United States v. Bissett-Berman Corporation, Pike Corporation of America, Western Offshore Drilling and Exploration Company and M/v Nesco I

481 F.2d 764, 1973 U.S. App. LEXIS 9552
CourtCourt of Appeals for the Ninth Circuit
DecidedJune 7, 1973
Docket71-1658
StatusPublished
Cited by31 cases

This text of 481 F.2d 764 (United States v. Bissett-Berman Corporation, Pike Corporation of America, Western Offshore Drilling and Exploration Company and M/v Nesco I) is published on Counsel Stack Legal Research, covering Court of Appeals for the Ninth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
United States v. Bissett-Berman Corporation, Pike Corporation of America, Western Offshore Drilling and Exploration Company and M/v Nesco I, 481 F.2d 764, 1973 U.S. App. LEXIS 9552 (9th Cir. 1973).

Opinion

TRASK, Circuit Judge:

Summary judgments were entered against the United States and in favor of the defendant, Bissett-Berman Corporation, and others in actions filed by the United States as plaintiff, under 28 U. S.C. § 1345, to recover damages for breach of contract to make certain marine installations. The United States appeals from those summary judgments for the defendants. We affirm.

On June 11, Í964, the Navy Electronics Laboratory (NEL) invited a proposal for the design, fabrication, installation at sea, and operational testing in situ of what was described as a “Deep-Moored Vertical Hydrophone Array with Radio Telemetry Line.” The invitation contemplated a proposal to award two contracts to the same contractor. First, a research and development contract covering the design, fabrication and interim testing of the array; and second, a time and material contract covering the installation and checkout at installation sites.

Bissett-Berman Corporation (BBC) was awarded both contracts. The manufacturing contract was completed and after dockside checkout was approved, BBC proceeded with the installation of the system at sea at a point approximately 18 miles off Point Arena, California. For this purpose BBC chartered a ship, the M/V Nesco I from Western *766 Offshore Drilling & Exploration Company (WODECO), a division of Pike Corporation of America. The system was installed on or about April 27, 1967. In place it consisted of surface marker buoys to which was attached a polypropylene line leading to a subsurface buoy some 1,000 feet below the surface. From that point an armored cable descended 5,000 feet more to the bottom. Although anchored at the bottom, the cable thereafter extended 7,000 feet along the bottom to a point at which it was again anchored. It then was brought to the surface where it attached to the transmission buoy. The hydrophone array was attached to the descending cable. Thus, on the surface the marker buoys and the transmission buoy were 7,000 feet apart although connected by a continuous line and cable beneath the surface.

Approximately 30 days after initial installation the transmission buoy broke loose and the cable to which it was attached dropped to the floor of the ocean. This buoy was recovered, repaired, and BBC was instructed by the United States to reinstall the system. The plan was to recover the system by locating the two marker buoys, which established the other end of the system, and by pulling these on the ship and thereafter the cable to which they were attached. This procedure would result in the recovery of the hydrophone array and the rest of the cable to which the transmission buoy had been attached at the opposite end of the installation. The transmission buoy would then be reattached to its end of the system and the apparatus replaced in the sea.

The marker buoys on the surface were located and pulled aboard. Because it was difficult to haul in the line, Mr. Wyborny, the BBC employee in charge of the operation, instructed the captain by hand signal to back the ship so as to create slack in the line. Too much slack was created quickly however permitting the polypropylene line to become entangled in the propellers. During an attempt to splice the line around the tangle, it parted and all was lost beneath the surface.

As a result of the loss of the hydrophone array, the United States filed this action asserting several claims against BBC. The first was for breach of the contracts claiming damages; second, for breach of warranty that the system was free from defects and conformed to specifications; third, for the amount of insurance coverage procured by BBC to protect and indemnify BBC against liability for loss or damage to government property in BBC’s possession or control; fourth, for gross negligence tantamount to willful misconduct or bad faith on the part of BBC’s representatives in their handling of government property. 1 The total amount sought was $742,561.50.

In addition, and in the same action below, the United States asserted several claims in separate causes of action against Pike, owner of Nesco I, and WODECO, operator of Nesco I, in personam and against Nesco I in rem. The first cause of action was for damage caused by the negligent navigation of the vessel resulting in the fouling of the polypropylene line and the loss of the array; the second was for damage caused by negligence of the crew.

Finally, the United States added a fifth and sixth cause of action against BBC sounding in contract, asserting that to the extent that BBC had failed to provide in its subcontracts with the divers, (fifth cause of action), and with *767 the vessel and its owners, (sixth cause of action), for liability of the subcontractors to the government and had by subcontract relieved the subcontractors of liability for loss and destruction of the array, BBC was liable to the United States. In support of this theory, the United States relied upon a paragraph of the Pike and WODECO subcontract which provided that BBC personnel aboard the ship would be in complete charge of the installation thus making the Pike and WODECO personnel on the ship “borrowed servants” of BBC and exonerating them from direct liability according to the government’s theory.

Under Rule 56(c) Fed.R.Civ.P. a summary judgment shall be rendered forthwith,

“if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.”

The affidavits shall be made on personal knowledge,

“shall set forth such facts as would be admissible in evidence, and shall show affirmatively that the affiant is competent to testify to the matters stated therein.” Rule 56(e).

Thus, the district court does not try issues of fact. Its function is to determine whether an issue of fact exists which might be material to the determination of an issue in the case. On review it is our function to determine “whether there is any genuine issue of material fact underlying the adjudication, and, if not, whether the substantive law was correctly applied.” 6 Moore’s Federal Practice (2d ed.) ¶ 56.27 [1] at 2973; Vickery v. Fisher Governor Co., 417 F.2d 466 (9th Cir. 1969).

The issue upon which the district court decided the case in favor of BBC was that all of the claims asserted by the United States against BBC in the first four causes of the First Amended Complaint were barred by a Stipulation of Settlement executed between the parties on December 22, 1969.

After the loss of the array and before the action was filed in the district court, the contracting officer of the government directed BBC to pay certain sums to it as damages for the loss of the array and announced that the government was not obligated to pay the balances due under the contract. BBC appealed both decisions to the Armed Services Board of Contract Appeals (ASBCA).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Sira Cruz v. Nat'l Steel & Shipbuilding Co.
910 F.3d 1263 (Ninth Circuit, 2018)
Jean S. Gray v. Larry O. Bain and Sharon Johnston
164 So. 3d 553 (Supreme Court of Alabama, 2014)
Cebe Farms, Inc. v. United States
116 Fed. Cl. 179 (Federal Claims, 2014)
Lublin Corp. v. United States
98 Fed. Cl. 53 (Federal Claims, 2011)
Stevens Van Lines, Inc. v. United States
80 Fed. Cl. 276 (Federal Claims, 2008)
Arakaki v. United States
71 Fed. Cl. 509 (Federal Claims, 2006)
Gemini Electronics, Inc. v. United States
65 Fed. Cl. 55 (Federal Claims, 2005)
CEMS, Inc. v. United States
59 Fed. Cl. 168 (Federal Claims, 2003)
Government of the Virgin Islands v. 0.459 Acres of Land
286 F. Supp. 2d 501 (Virgin Islands, 2003)
Thomas Creek Lumber & Log Co. v. United States
41 Cont. Cas. Fed. 76,971 (Federal Claims, 1996)
Wolsiffer v. Atlantis Submarines, Inc.
848 F. Supp. 1489 (D. Hawaii, 1994)
H. Landau & Co. v. United States
36 Cont. Cas. Fed. 75,863 (Court of Claims, 1990)
H. Landau & Company v. The United States
886 F.2d 322 (Federal Circuit, 1989)
H. Landau & Co. v. United States
885 F.2d 322 (Federal Circuit, 1989)
Parker v. Joe Lujan Enterprises, Inc.
848 F.2d 118 (Ninth Circuit, 1988)
Norman Castillo, D.O. v. United States
707 F.2d 422 (Ninth Circuit, 1983)
Cheyenne-Arapaho Tribes of Indians v. United States
671 F.2d 1305 (Court of Claims, 1982)

Cite This Page — Counsel Stack

Bluebook (online)
481 F.2d 764, 1973 U.S. App. LEXIS 9552, Counsel Stack Legal Research, https://law.counselstack.com/opinion/united-states-v-bissett-berman-corporation-pike-corporation-of-america-ca9-1973.