Opinion

FRANK B. ELLIS, District Judge.

During the night of September 25, 1956, respondent’s unmanned vessel, the-Barge CBC 603, broke its mooring line- and drifted down the Chattahoochee River until it collided with an Army pontoon-bridge which spanned the river at Bradley's Landing, Fort Benning, Georgia.. *87 The United States, as owner of the bridge, instituted an action for damages to the bridge, and in an amended libel, claimed salvage for the recovery of respondent’s barge. The claims are directed against the Barge CBC 603, in rem, and against its owner, Joseph M. Jones, in personam. 1 Respondent seeks to avoid liability on the grounds of inevitable accident or “force majeure.” The barge CBC 603 was bareboat chartered at the time of the accident to Mr. Thurston Crawford of Columbus, Georgia, who was then engaged in the towing business.

In July of 1956 the barge was loaded at Columbus, Georgia, with a cargo of approximately one hundred tons of rock to be towed downstream for use in a construction project. Due to the low level of water in the Chattahoochee River at that time of year, the barge ran aground approximately seven miles north of libel-lant’s pontoon bridge. The charterer, upon realizing that a continued attempt to free the grounded barge would be to no avail, directed his employees to secure the stranded vessel by attaching one end of a manila line two or two and a half inches in diameter, to a cleat on the barge while securing the other end to a tree trunk on the bank. Once attached, the line extended approximately one hundred and fifty to two hundred feet from the rtree to the barge.

The barge remained in this grounded •position for approximately two and a half •months. Meanwhile, on or about September 21, 1956, Hurricane Flossy formed -'in the Gulf of Mexico near the Yucatan Peninsula. On the 23rd of September, the storm reached its maximum intensity .at sea somewhat to the south of the Louisiana coast. On the 24th, it hit the mainland in the vicinity of Pensacola, Florida, after having curved to the northeast. 'Eventually, Hurricane Flossy dropped below hurricane intensity, and on the 25th, while crossing in a northeasterly direction through the southern part of Geor-rgia, the storm became classified as an extra-tropical cyclone.” Although the storm did not pass in the immediate vicinity of Fort Benning, Ga., it did produce heavy rains totalling 5.8 inches and winds up to 20 knots in that area. The intensity of the rainfall caused a flooding condition in the upper part of the Chattahoochee River which necessitated an opening of the gates at the Bartlett’s Ferry Dam located above Columbus, Ga. This resulted in a 12-foot rise of the waters below the dam which, in turn, caused the Barge CBC 603 to re-float. Eventually, the line securing the barge to the tree trunk on shore became inadequate to hold the barge and its heavy cargo against the onrush of the rising river. tt

Meanwhile, at Bradley’s Landing, soldiers were attempting to raise the bridge and to move floating debris through and under the pontoon bridge. After a lookout had cited what then appeared to be a very large object floating towards the bridge, a warning was issued and the bridge was cleared of all personnel. Shortly thereafter, at approximately 10:30 p. m., the barge struck the bridge with considerable impact. The soldiers at the site were first ordered to secure the damaged bridge, and later they attempted to remove the barge from its contact with the bridge. This was to be accomplished by attaching cables from the barge to winch-equipped trucks on the east bank of the river. However, a successful removal of the barge was rendered impossible due to a lack of sufficient traction on the rain-soaked earth where the trucks were located. Eventually, the weakened bridge, with the barge continually pressing against it, gave way and broke into several parts which then floated away. The barge which had already been secured by cables attached to the winch trucks came to rest alongside the east bank of the river.

Respondents have raised the defense of inevitable accident. In addition to showing the presence of a “force *88 majeure”, one who asserts this defense also has the burden of clearly establishing his freedom from fault before he can be exonerated from payment for damages to the property of an innocent third party. Sherwood Refining Co., Inc. v. Whiteman, 127 F.Supp. 478 (E.D.La. 1955). In such a case, freedom from fault is generally determined by the reasonableness of the precautions taken under the circumstances as known or reasonably to be anticipated. Swenson v. The Argonaut, 204 F.2d 636 (3 Cir. 1953); see also Gilmore and Black, The Law of Admiralty (3rd Ed. 1957) at p. 398.

It is thus incumbent upon respondent in this case to show that the accident could not have been prevented even by the use of that degree of reasonable care and attention which the situation demanded. Moran Towing & Transportation Co. v. M/S Hoperange, 226 F.Supp. 1018 (E.D.La.1964); Boudoin v. J. Ray McDermott and Co., 281 F.2d 81 (5th Cir. 1960); The J. N. Gilbert, 222 F. 37, 41 (5th Cir. 1915).

Ordinarily, several hours are required for waters released by the dam to reach that area where the barge was located. Although the charterer of the barge, Mr. Crawfoi’d, was not directly informed that the dam was to be opened at any precise time, he nevertheless admitted his awareness of the unusual weather conditions and of the fact that, under the circumstances, the gates of the Bartlett’s Ferry Dam would eventually have to be opened. (Transcript, pp. 93, 96.) It thus appears that the party in control of the moored vessel has failed to show that he made a critical evaluation of the circumstances and the reasonable courses of action which may have been taken under such circumstances. The defense of “force majeure” necessitated in this case a credible showing that the charterer had no reason to anticipate the possibility that the barge would have been rapidly refloated at that time which in turn would have required an immediate inspection of the mooring lines.. On the contrary, the charterer, by reason, of his knowledge of the area and of the-conditions which ordinarily caused the-dam to be opened, admitted to the Court his awareness of a foreseeable opening-of the dam due to the prevailing climatic conditions. The only excuse offered for-his failure to inspect the sufficiency of the mooring was his lack of certainty as-to the precise moment the waters at the dam would probably be released. Under-such circumstances, a lack of such precise knowledge does not mitigate the duty to exercise some precautionary measures, particularly that duty to inspect the-security of an unattended, lightly-secured vessel, exposed to the foreseeable and', forceful onrush of released flood waters.. Such failure to inspect the mooring lines coupled with the absence of larger and' stronger lines constitutes negligence.

Respondent further asserts, that the alleged failure of libellant to immediately attempt a removal or securing' of the barge prior to its breakthrough constituted an intervening cause and thereby became the proximate cause of the bridge’s destruction.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
233 F. Supp. 85, 1964 U.S. Dist. LEXIS 8197, Counsel Stack Legal Research, https://law.counselstack.com/opinion/united-states-v-barge-cbc-603-laed-1964.