This text of 735 P.2d 125 (Trus Joist Corp. v. Safeco Insurance Co. of America) is published on Counsel Stack Legal Research, covering Court of Appeals of Arizona primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Trus Joist Corp. v. Safeco Insurance Co. of America, 735 P.2d 125, 153 Ariz. 95, 1986 Ariz. App. LEXIS 729 (Ark. Ct. App. 1986).

Opinion

BROOKS, Judge.

This case involves several appeals and cross appeals from three separate judgments arising from appellees, cross-appellants’ (plaintiffs’) suit for breach of an insurance contract and bad faith. To say that the facts and procedural history are unique and somewhat complex would be an understatement.

FACTS

Trus Joist Corporation (Trus Joist), appellee, cross-appellant, is a Nevada corporation that designs and manufactures building trusses which are the structural supports that hold up the roofs and floors of buildings. As part of its comprehensive liability protection plan, Trus Joist carried the following liability insurance coverage:

1) a primary policy for $250,000 with Safeco Insurance Company of America (Safeco), appellant, cross-appellee;
2) a $1,000,000 umbrella policy providing excess coverage from American Bankers Insurance Company of Florida (American Bankers), appellee, cross-appellant.

The Safeco policy provided very comprehensive coverage to Trus Joist for a variety *97 of potential losses. In return for such protection, Trus Joist paid an extraordinarily high annual premium of $62,500.

Sometime in 1975, Trus Joist was hired by a local general contractor to design and manufacture trusses for a new automobile showroom being built for Chapman Chevrolet in Tempe. Chapman was in the business of selling new and used cars and desired to move its location from Chandler to a much larger facility.

Trus Joist had its nonengineer employees design the required trusses for the planned showroom. The design and specifications for these trusses were subsequently approved by a licensed engineer, Fred Miller. Trus Joist then sent the plans and specifications for the trusses, along with the material for building the trusses, to the general contractor for installation. After reviewing the plans and specifications for the trusses, the general contractor contacted Trus Joist several times about what it perceived to be an error in the trusses’ design. 1 Trus Joist responded each time by informing the general contractor that this was a new type of truss and that there would be no problems. The trusses were thereafter installed and a new roof constructed over them.

On August 18,1976, several of the trusses failed due to a clear design defect, causing a major portion of the unfinished showroom’s roof to collapse. No personal injuries resulted from this “falldown,” as it is termed in the industry, but extensive physical damage was done to the building site. Trus Joist immediately contacted Safeco about the falldown since the general contractor, roofing subcontractor, and Chapman Chevrolet were all holding Trus Joist responsible for their damages.

Safeco began an immediate investigation. By the end of August, it had gathered sufficient information to permit it to estimate that the damages from the falldown would probably exceed Safeco’s $250,000 policy limit. However, the company desired further investigation into the cause of the falldown and the nature of the claimed damages.

By early September, 1976, Trus Joist had notified Safeco of its belief that it was clearly responsible for the falldown and that it wanted a quick settlement of the claims against it in order to avoid a costly law suit which could harm the company’s reputation. Safeco informed Trus Joist that its investigation was not yet complete and that it was in no position to settle any of the claims.

On September 28, 1976, in an effort to speed Safeco’s investigation along in the hope of obtaining a quick settlement, Trus Joist sent Safeco an itemized list of the damages claimed against it. These damages exceeded $300,000. Safeco still refused to consider settling the claims, saying that its investigation was not yet complete.

Because of Safeco’s unwillingness to discuss settlement, the claimants threatened to bring suit against Trus Joist for the damages arising from the falldown. They agreed, however, to meet with Trus Joist on October 14, 1976, in a final attempt to settle. Prior to this meeting, Trus Joist contacted Safeco about the possibility of allowing Trus Joist to settle with the claimants on its own without waiving any of its rights to reimbursement from Safeco for monies due under the policy. 2 Safeco agreed on the condition that Trus Joist consent to a reduction of the policy limits from $250,000 to $230,000 and that it further agree that any dispute as to the amount of reimbursement due under the policy would render the entire amount subject to arbitration upon demand by either party. A written contract incorporating these modifications to the insurance policy was signed on October 11, 1976.

On October 14, 1976, Trus Joist met with the claimants. Representatives from both Safeco and American Bankers were *98 present. However, Safeco’s representative refused to participate in the settlement negotiations, stating that he was present only as an “observer.” Because the claimants were demanding more than $250,000 in damages, Trus Joist refused to settle on its own and prepared to walk away from the negotiations. American Bankers, realizing that litigation would drive up costs and that it would be liable as the excess carrier for any award against Trus Joist over Safe-co’s policy limits, urged settlement. To this end, it agreed to pay $250,000 to settle the claims against Trus Joist and to release it from any liability in return for an assignment of Trus Joist’s right to reimbursement from Safeco under the October 11 agreement. Trus Joist agreed and the third party claims were settled for $256,-000. Of this amount, American Bankers paid $253,000 and Trus Joist $3,000.

Subsequently, Safeco appraised the prior claimants’ damages and offered Trus Joist $195,000 as reimbursement under the October 11 agreement. 3 Trus Joist rejected this offer and on December 28, 1976, demanded arbitration. Arbitration was pending for approximately a year and a half without a hearing. Trus Joist eventually filed suit against Safeco on April 4, 1978, claiming breach of the insurance contract and bad faith. 4 American Bankers subsequently joined in this action as a plaintiff.

During discovery, Safeco learned that Fred Miller, the engineer who approved the truss plans and specifications, was not an employee of Trus Joist, but was an independent consultant. As a result, Safeco claimed that it owed no coverage to Trus Joist under exclusion (h) of the policy, which reads:

This insurance does not apply:
******
(h) to contractual liability assumed by the insured, if the insured or his indemnitee is an architect, engineer or survey- or, for ... property damage arising out of the rendering of or the failure to render professional services by such insured or indemnitee, including.
1) the preparation or approval of ... designs or specifications____

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
735 P.2d 125, 153 Ariz. 95, 1986 Ariz. App. LEXIS 729, Counsel Stack Legal Research, https://law.counselstack.com/opinion/trus-joist-corp-v-safeco-insurance-co-of-america-arizctapp-1986.