Tri-State Generation & Transmission Ass'n v. Shoshone River Power, Inc.

874 F.2d 1346, 1989 WL 47073
CourtCourt of Appeals for the Tenth Circuit
DecidedMay 5, 1989
DocketNo. 87-2288
StatusPublished
Cited by62 cases

This text of 874 F.2d 1346 (Tri-State Generation & Transmission Ass'n v. Shoshone River Power, Inc.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Tenth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Tri-State Generation & Transmission Ass'n v. Shoshone River Power, Inc., 874 F.2d 1346, 1989 WL 47073 (10th Cir. 1989).

Opinions

McKAY, Circuit Judge.

I. Background

The background of this case is detailed in our previous opinion, reported at Tri-State Generation & Transmission Association, Inc. v. Shoshone River Power, Inc., 805 F.2d 351 (10th Cir.1986) [hereinafter Shoshone 7], which considered Tri-State Generation and Transmission Association, Inc.’s (Tri-State’s) appeal from the district court’s dissolution of the preliminary injunction in this case. We highlight portions of the background for purposes of this appeal as follows.

In 1936 Congress enacted the Rural Electrification Act, 7 U.S.C. §§ 901-950b (1982 & Supp.1986), which instituted a program designed to provide electric power to rural America. Apparently, Congress was concerned with the fact that those then engaged in the business of generating electrical energy had failed to extend electric service to the rural communities of America and determined that the national interest would be served by subsidizing the rural user of electricity. The Rural Electrification Act created the Rural Electrification Administration (REA) and authorized the REA to make and guarantee loans that would enable rural communities to obtain electric power.

In response to the Rural Electrification Act, rural communities across America formed nonprofit electric distribution cooperatives. In 1942 individuals from Park County, Wyoming, organized a distribution cooperative, Shoshone River Power, Inc. (Shoshone). Basically, the consumers of electric power within the geographic area served by Shoshone are the members of Shoshone.

After REA-financed distribution cooperatives such as Shoshone were formed, groups of cooperatives banded together to form central generation and transmission cooperatives (G & Ts).1 This second-level cooperative formation stemmed from an effort on the part of the distribution cooperatives to secure and more economically obtain a long-term source of power.

In 1952 distribution cooperatives in Colorado, Nebraska, and Wyoming formed a central G & T, Tri-State, to be “operated on a cooperative, non-profit basis for the [1349]*1349mutual benefit of its members.”2 Record, vol. 1, doc. 86, exh. A (Articles of Incorporation, art. IV; Bylaws, art. VII, § 1). Specifically, Tri-State was organized for the purpose of furnishing long-term wholesale power and energy to its member distribution cooperatives who, in turn, funnel the power to their consuming members. TriState is comprised of its member distribution cooperatives which are comprised of the actual consumers of the electric power.

Although not one of the original distribution cooperatives forming Tri-State, Shoshone became a member of Tri-State in 1958. Like all member distribution cooperatives, Shoshone entered into a long-term wholesale power contract (the all-requirements contract) with Tri-State for electric service. In general, the all-requirements contract provides that Tri-State would sell and deliver to Shoshone, and Shoshone would purchase and receive from Tri-State, all electric power and energy which Shoshone would require for the operation of its system. The contract secures a long-term source of power for Shoshone, assures a stable market for the power produced by Tri-State, and provides a long-term revenue stream with which Tri-State could repay obligations incurred by it on behalf of its members.

Shoshone initially agreed that the all-requirements contract would remain in effect for a term of thirty-three years — until December 31, 1991. On June 23, 1965, the contract was replaced by a similar all-requirements contract, under which Shoshone agreed to extend the term of the contract to December 31, 2005. This 1965 contract recites that Tri-State proposed to construct

an electric generating plant or transmission system, or both, and that Tri-State would enter into similar all-requirements contracts for electric power with all member distribution cooperatives. The contract also provides that the rate for electric power charged to Shoshone, along with the other member distribution cooperatives, could be revised so that the revenues produced from the all-requirements contracts and other sources would be sufficient to meet the costs of operating and maintaining Tri-State’s system and sufficient to make payments on all of Tri-State’s indebtedness. The 1965 contract was subsequently modified, Shoshone agreeing most recently in 1977 to extend the term of the contract to December 31, 2020.

Getting electric power out to the rural communities was obviously an expensive task. The REA program and formation of central G & Ts made it possible for rural communities to obtain the needed help and financial aid. With the all-requirements contracts in place, the G & T system provided a stable, interdependent network whereby the distribution cooperatives could pool their resources and band together to obtain power at wholesale prices, build central facilities, obtain favorable loans, and attempt to keep costs down. In this respect, notwithstanding a G & T’s low equity ratio,3 it is clear from the record that REA has been willing and authorized to provide and guarantee favorable long-term, low-interest loans to G & Ts inasmuch as REA is able to look to the revenue stream under the all-requirements contracts as an assured source of repayment and security for the loans4 and as an essential factor to [1350]*1350the cohesiveness and financial strength of the G & T systems. Effectually, then, the all-requirements contracts place the financial strength of the distribution cooperatives behind G & T loans.

Initially, Tri-State operated as a paper G & T; it owned no generation facilities and acted mainly as a pooling agent to manage more efficiently its members’ power allocations. Later, during the 1960’s, the member distribution cooperatives anticipated substantial future growth in demand for electricity and projected increased needs. The record is clear that in response to its members’ power requirement forecasts and to avert a possible power shortage, TriState built generation and transmission facilities, obtaining REA loans and REA-guaranteed loans to do so. The terms of Tri-State’s all-requirements contracts with its member distribution cooperatives were extended to match the payment periods of the loans taken out by Tri-State. The record is clear that REA required extensions and the member distribution cooperatives agreed to the extensions so that TriState could obtain loans to build the facilities for its members’ benefit.

After Tri-State built facilities, made substantial capital outlays, incurred debt, and expended funds on behalf of its members, economic conditions changed. The projected growth in demand failed to materialize, and there was an oversupply of electric power. In the early 1980’s, Tri-State, like other G & Ts, found itself with stagnant demand, excess capacity, enormous debts to be repaid, and increasing rates being charged to its members.

In October 1985, Shoshone entered into a Memorandum of Understanding with Paci-fiCorp dba Pacific Power & Light Company (Pacific), an investor-owned utility. Pursuant to the Memorandum of Understanding, Pacific offered to purchase substantially all of Shoshone’s assets, which include the power-delivery subscriptions of Shoshone’s members and some poles and power lines.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

United States v. Stacy
Tenth Circuit, 2025
Knowlton v. Armijo
Tenth Circuit, 2024
Denver Homeless Out Loud v. Denver, Colorado
32 F.4th 1259 (Tenth Circuit, 2022)
Church Mutual Insurance Co. v. Ma'Afu
657 F. App'x 747 (Tenth Circuit, 2016)
New Mexico Ex Rel. State Engineer v. Trujillo
813 F.3d 1308 (Tenth Circuit, 2016)
Petrella v. Brownback
787 F.3d 1242 (Tenth Circuit, 2015)
Denbury Onshore, LLC v. Christensen
101 F. Supp. 3d 1147 (D. Wyoming, 2015)
Miller v. Basic Research, LLC
750 F.3d 1173 (Tenth Circuit, 2014)
Entek GRB, LLC v. Stull Ranches, LLC
937 F. Supp. 2d 1328 (D. Colorado, 2013)
White v. Goff
348 F. App'x 366 (Tenth Circuit, 2009)
Southern Ute Indian Tribe v. Leavitt
564 F.3d 1198 (Tenth Circuit, 2009)
Snyder v. American Kennel Club
575 F. Supp. 2d 1236 (D. Kansas, 2008)
Croy v. Cobe Laboratories, Inc.
132 F. App'x 229 (Tenth Circuit, 2005)
Winnebago Tribe of Nebraska v. Stovall
205 F. Supp. 2d 1217 (D. Kansas, 2002)

Cite This Page — Counsel Stack

Bluebook (online)
874 F.2d 1346, 1989 WL 47073, Counsel Stack Legal Research, https://law.counselstack.com/opinion/tri-state-generation-transmission-assn-v-shoshone-river-power-inc-ca10-1989.