Total Rebuild Inc v. P H C Fluid Power L L C

District Court, W.D. Louisiana·Decided September 9, 2019·No. 6:15-cv-01855·Unknown

Opinion

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF LOUISIANA LAFAYETTE DIVISION TOTAL REBUILD, INC. CASE NO. 6:15-CV-1855 VERSUS JUDGE TERRY A. DOUGHTY PHC FLUID POWER, L.L.C. MAG. JUDGE CAROL B. WHITEHURST

RULING

This is a patent infringement case in which Plaintiff Total Rebuild (“Plaintiff”) contends systems and/or methods utilized by or through Defendant PHC (“Defendant”) infringe claims of United States Patent No. 8,146,428 (“the ’428 Patent”). The ’428 Patent is directed to systems and methods for safely testing devices and components under high-pressure. Pending before the Court is Defendant’s “Motion in Limine regarding Accused Systems Not Identified in Infringement Contentions” [Doc. No. 296]. Plaintiff responded to the motion. [Doc. No. 331]. For the following reasons, the motion is GRANTED IN PART and DENIED IN PART. I. PERTINENT FACTS AND PROCEDURAL HISTORY

Defendant moves the Court to enforce the Patent Rules for the Eastern District of Texas (“Patent Rules”) in this case. Defendant argues that the Joint Scheduling Order set a due date of August 8, 2016, for Plaintiff to comply with Patent Rule 3-1. [Doc. No. 296-1 at 5] (citing Doc. No. 50 at 1).1 Patent Rule 3-1 requires Plaintiff to serve infringement contentions that identify the “Accused Instrumentality,” and includes “[a] chart identifying specifically where each element of each asserted claim is found within each Accused Instrumentality.” [Doc. No. 51-1 at 6-7].

1 Citations to the parties’ filings are to the filing’s number in the docket [Doc. No.] and pin cites are to the page numbers assigned through ECF. On August 23, 2016, Plaintiff served its Disclosure of Asserted Claims and Preliminary Infringement Contentions (“Original Infringement Contentions”) on Defendant. [Doc. No. 296-1 at 5). Defendant argues that the Original Infringement Contentions include only generic names without any reference to any specific device or process as required by Patent Rule 3-1(b). Id. at 6. On January 23, 2017, Plaintiff served its Supplemental Disclosure of Asserted Claims and

Preliminary Infringement Contentions (“First Supplemental Contentions”) on Defendant. Id. Defendant contends that the First Supplemental Contentions include the identical Patent Rule 3- 1(b) disclosure found in the Original Infringement Contentions. Id. Defendant further contends that Plaintiff’s counsel “spent over 20 hours at PHC’s Houston, Texas facility reviewing, inspecting, and scanning design documents, drawings, and other related documents for pressure testing systems sold by PHC,” on June 7-9, 2017. Id. at 7. On August 27, 2018, over a year after the on-site review, Plaintiff served its Second Supplemental Disclosure of Asserted Claims and Preliminary Infringement Contentions (“Second Supplemental Contentions”) on Defendant. Id. at 8. Defendant argues that the Second

Supplemental Contentions include only generic names without any reference to any specific device or process as required by Patent Rule 3-1(b). Id. at 9. On November 30, 2018, Plaintiff’s counsel sent the following email to Defendant regarding infringement contentions for specific units. Id. at 10. Sam, I'm still working on it. May not be done tonight though. The chart is taking too long. I'm going to be working on it over the weekend to get to you as soon as | can. But, in the meantime, | can at least identify the specific units we allege are infringing: PHC-TB-15-W-ATV4-GSF100-ASF150-AGT62-152-RC sold to Baker Hughes Emmott Rd., □□□□□□□□□□□□□□□□□□□□□□□□ ASF150-DL-1 sold to Baker Hughes in Oklahoma, PHC-TB-23-WATV4-HSF202-RV-RC to Cameron Dnilling and Production Houston, PHC-TB-15-W-ASFB22-H$F202-RC and PHC-TB-30-W-ASF100-HSF302-RC sold to Cameron Tanner Rd, PHC-TB-20-W-ATV4-HSF202-RC sold te GE in Canton Ohio, PHC-TB-23-W-ATV4-HSF202-4RC sold to GE in Sugarland Texas, and PHC's Systems sold from PHC's Broussard, LA business location evidenced in PHC's production bates numbered PHC0003114-PHC0003130. Thank you, Chase Manuel

[Doc. No. 296-2 at 2]. On December 6, 2018, Plaintiff's counsel sent the following email stating that its Third Supplemental Infringement Contentions would be “accurate and sufficiently detailed regarding each unit.”

Sam, We are coordinating with our expert to ensure that the supplement is accurate and sufficiently detailed regarding each unit. But it is taking some time to complete. It is to all our benefit to make sure they are as complete as possible. We believe it will be done by Monday. We denve no benefit fram waiting as PHC's supplemental non-infringement contentions will be similarly postponed, but these contentions need to be done nght. In the meantime, we have previously provided you with a list of the units we are alleging infringe the ‘428 Patent so that you are not kept in the dark as to what units our contentions will be directed. Sincerely, Chase

[Doc. No. 296-3 at 2]. On December 10, 2018, over three and a half years after this case began, Plaintiff served its Third Supplemental Infringement Contentions on Defendant. [Doc. No. 296-1 at 11). On February 28, 2019, Defendant moved to strike Plaintiff's Third Supplemental Infringement Contentions (“Motion to Strike”). [Dkt. No. 243]. Defendant argued in the Motion to Strike that Plaintiff was attempting to vastly expand its infringement theories, and that the Third Infringement Contentions were untimely because they were served over 2 years after the deadline, and after fact discovery had closed. /d. at 1.

Page 2 anf 10

On March 28, 2019, the Court granted the Motion to Strike and found that Plaintiff was improperly trying to expand its infringement contention by taking the new position that “using pumps or pump systems outside an explosion-safety housing can infringe its patent.” [Doc. No. 263 at 2] (emphasis in original). The Court noted that Plaintiff “does not dispute that its latest contentions ‘vastly expand’ its claims or that it failed to serve the contentions until December

2018.” Id. Instead, Plaintiff argued that its supplementation was timely because the Court has not adopted the proposed scheduling order (Doc. No. 162-1) and local rules allow it to amend its contentions as late as 30 days after a claim-construction ruling. Id. The Court found that “[b]ecause the Court has not made a claim-construction ruling, Local Patent Rule 3-6(a) does not apply.” Id. at 3. The Court further found that the factors courts consider when evaluating motions to strike all weighed in favor of striking the contentions. Id. at 4-5. The Court then granted Defendant’s Motion to Strike Infringement Contentions (Doc. 243), and further ordered that Plaintiff “is PRECLUDED from proceeding on any infringement theory not identified with sufficient specificity in its original infringement contentions, first supplemental

infringement contentions, or second supplemental infringement contentions. A boilerplate allegation of infringement under a doctrine-of-equivalents theory is insufficient.” Id. at 6. On April 1, 2019, Plaintiff’s counsel stated in an email that it was asserting infringement by “one additional system attached as a pdf to this email,” which is identified in the email as “PHC-TB-15-W-ASFB10-ASF150-RV-CR-SPCL” to Wells Dynamics. [Doc. No. 296-1 at 12]. Per the April 1, 2019 email, the eight systems Plaintiff identified as infringing are as follows: 1. PHC-TB-30-W-ASF100-HSF302-RC to Cameron (hereinafter “Cameron Black”)

2. PHC-TB-23-W-ATV4-HSF202-RV-RC to Cameron (hereinafter “Cameron North Dakota”); 3. PHC-TB-15-W-ASFB10-ASF150-RC-CR-SPCL to Well Dynamics (hereinafter “Well Dynamics”);

4. PHC-TB-23-W-ATV4-HSF202-4RC to GE (hereinafter “GE Oil”);

5. PHC-TB-15-W-ATV4-GSF100-ASF150-AGT62-152-RC to Baker Hughes (hereinafter “Baker Hughes Emmott”);

6. PHC-TB-15-W-ASFB22-HSF202-RC to Cameron (hereinafter “Cameron Brown”);

7.

Free access — add to your briefcase to read the full text and ask questions with AI

Total Rebuild Inc v. P H C Fluid Power L L C, (W.D. La. 2019).

Total Rebuild Inc v. P H C Fluid Power L L C (Total Rebuild Inc v. P H C Fluid Power L L C) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Betzel v. State Farm Lloyds
480 F.3d 704 (Fifth Circuit, 2007)
Computer Acceleration Corp. v. Microsoft Corp.
503 F. Supp. 2d 819 (E.D. Texas, 2007)