Tolles v. Winton, Exrs.

28 A. 542, 63 Conn. 440, 1893 Conn. LEXIS 64
Supreme Court of Connecticut·Decided December 13, 1893·Published·Cited by 7 cases

Opinion

Fenn, J.

This is an appeal by the defendants from a judgment rendered by the Court of Common Pleas in Fairfield Countjn The complaint contained the common counts, under which a bill of particulars was filed, as follows : — “ To $500 cash paid to Andrew L. Winton by the plaintiff, upon an agreement for the purchase of certain real estate by the plaintiff from said Winton, which agreement the said Win-ton improperly failed and refused to consummate and carry out.” The answer, a general denial, was accompanied by a counter-claim, which set up a contract for the conveyance of real estate, alleged a breach on the part of the plaintiff and claimed $1,000 damages. The court found that the plaintiff did refuse to consummate the contract, for the reason that the defendants, between the date of the contract and the time fixed for the final payment and the delivery of the deed, removed from the premises a steam engine thereon located, and sold and delivered the same to third parties, without the knowledge or consent and against the will of the plaintiff. And thereupon the parties were at issue, as to whether the removal of said engine from the premises legally justified the plaintiff in refusing to consummate the *442 contract, the plaintiff claiming that the engine was a part of the realty, which claim the court below sustained, and the defendants claiming that it was personal property.

This ruling of the court that the engine was a part of the realty, is the only matter before us for review. For, although the defendants now insist that even if the engine was a fixture, the plaintiff was not justified in refusing to consummate the purchase because of its removal, since its value was capable of exact appraisement the amount of which might have been deducted from the agreed purchase price of the realty, it is sufficient to say that no such question was made in the court below. Nor could it have been under the pleadings. Furthermore, the defendants are in no position to raise this question inasmuch as they sold the remaining portion of the real estate after the commencement of the present action but before the trial, thereby putting it out of their power to specifically perform, either wholly or in part.

The facts found by the court in reference to the engine were these : — “ The land and buildings referred to in the contract consisted of a substantial three story and basement brick edifice, with the ground under and about the same, situated on Middle street in the city of Bridgeport. Said Winton had long owned the premises, and about five years before the contract was made and while owning the same, had occupied the first floor thereof as a feed store, and in order to make the upper stories available for tenants needing power, he placed in the basement thereof an engine and boiler, and connected the same by appropriate shafting and belting with the upper stories, and thereby supplied motive power to his tenants renting the same. Said building had not been constructed originally for the use of machinery, and the interior of the building was prepared by Winton, in the manner herein set forth, for the reception of the engine and boiler, together with the belting and shafting necessary to convey the power from the celler to the upper stories. No machinery Was prepared for the use of power on the first floor, occupied by said Winton. The engine stood three or four feet from the boiler, and about two years before the *443 execution of the contract was disconnected from tbe boiler by unscrewing couplings, because the tenant who then occupied the upper part of the building desired to run a small engine, placed in the upper stories, which was run however by steam supplied by the boiler in the basement. The engine continued so disconnected at the date of the contract. The engine was set up and attached to the property in the following manner: — a cavity was dug in the basement floor, in which a solid foundation of stone and cement was laid, and in this grouting were imbedded bolts, which extended upwards, passing through a timber placed on the grouting in such a manner and location as to receive the engine. The engine was then placed on the timber, and the bolts passing through plates on the engine were capped by nuts screwed upon them, thus fastening the engine firmly to the timber and grouting. By unscrewing the nuts the engine could be lifted from the bolts, and removed without other injury to" the building than the loss of the engine, but the bolts could not be removed without tearing up and destroying the grouting. The boiler was similarly fixed upon a foundation of grouting, and a pit was dug in the basement floor, in connection with the boiler for ashes.”

Free access — add to your briefcase to read the full text and ask questions with AI

Tolles v. Winton, Exrs., 28 A. 542, 63 Conn. 440, 1893 Conn. LEXIS 64 (Colo. 1893).

28 A. 542 (Tolles v. Winton, Exrs.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Atc Partnership v. Town of Windham, No. 95-0049838-S (Sep. 29, 2000)
2000 Conn. Super. Ct. 12126 (Connecticut Superior Court, 2000)
Waterbury Petroleum Products, Inc. v. Canaan Oil & Fuel Co.
477 A.2d 988 (Supreme Court of Connecticut, 1984)
Norwalk Vault Co. of Bridgeport, Inc. v. Mountain Grove Cemetery Ass'n
433 A.2d 979 (Supreme Court of Connecticut, 1980)
Hartlin v. Cody
134 A.2d 245 (Supreme Court of Connecticut, 1957)
Radican v. Hughes
86 A. 220 (Supreme Court of Connecticut, 1913)
Camp v. Charles Thatcher Co.
52 A. 953 (Supreme Court of Connecticut, 1902)
Readfield Telephone & Telegraph Co. v. Cyr
49 A. 1047 (Supreme Judicial Court of Maine, 1901)