The Tank Steamer Fort Fetterman, Libellee, and Chas. Kurz & Co., Inc., Cross-Libellant v. South Carolina State Highway Department, Libellant And

278 F.2d 921, 1960 U.S. App. LEXIS 4525, 1960 A.M.C. 1325
CourtCourt of Appeals for the Fourth Circuit
DecidedMay 19, 1960
Docket8023_1
StatusPublished
Cited by9 cases

This text of 278 F.2d 921 (The Tank Steamer Fort Fetterman, Libellee, and Chas. Kurz & Co., Inc., Cross-Libellant v. South Carolina State Highway Department, Libellant And) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fourth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
The Tank Steamer Fort Fetterman, Libellee, and Chas. Kurz & Co., Inc., Cross-Libellant v. South Carolina State Highway Department, Libellant And, 278 F.2d 921, 1960 U.S. App. LEXIS 4525, 1960 A.M.C. 1325 (4th Cir. 1960).

Opinion

HOFFMAN, District Judge.

We have considered the merits of this controversy on two prior occasions. 1 Upon rehearing following our first opinion, we adhered to the applicability of the Pennsylvania rule, but remanded the *924 case to the District Court for specific findings.

Essentially there are two questions for determination. One involves the alleged protrusion of the gear racks and whether this constituted a statutory fault; the other concerns the admitted violation of the permit issued by the War Department prior to the construction of the Ashley River bridge with regard to the maximum elevation of the raised bascule spans.

As to the gear racks, we have heretofore proceeded on the assumption, conceded in argument by proctors for both parties, that the plans and specifications must be considered as a part and parcel of the permit to determine whether the bridge was constructed in accordance with the requirements of 33 U.S. C.A. §§ 401, 491. Upon remand this matter was examined at length and, from the testimony presented to the District Judge, it is apparent that when an application to construct a bridge across navigable waters wholly within the limits of a state is submitted to the Chief of Engineers for approval by him and the Secretary of the Army, the “location and plans” required by § 401 do not contemplate complete plans, specifications and finished drawings as a condition precedent to the issuance of a permit authorizing construction of the bridge. By the terms of § 491, acknowledged as a part of the Bridge Act of 1906, it is provided that, when authority is granted by Congress to construct and maintain a bridge across or over any navigable water of the United States, the “bridge shall not be built or commenced until the plans and specifications for its construction, together with such drawings of the proposed construction and such map of the proposed location as may be required for a full understanding of the subject, have been submitted to the Secretary of the Army and Chief of Engineers for their approval, nor until they shall have approved such plans and specifications and the location of such bridge and accessory works.” Section 491 further states that when the plans for any bridge constructed under the Bridge Act of 1906 have been approved by the Chief of Engineers and Secretary of the Army, “it shall not be lawful to deviate from such plans, either before or after completion of the structure, unless the modification of such plans has previously been submitted to and received the approval of the Chief of Engineers and of the Secretary of the Army.” In 1946, the Bridge Act of 1906 was further implemented and modernized by 33 U.S.C.A. § 525-533 but, of course, these latter statutes are not applicable to the Ashley River bridge constructed during the years 1923-25.

As the bridge in question was built under authority of the South Carolina Legislature (30 S.C.Stat. 1072) and the navigable portions are wholly within the State of South Carolina, it is clear that the applicable statute is 33 U.S.C.A. § 401 — a fact that was not mentioned until receipt of appellant’s supplementary brief on rehearing. Both parties now concede that § 401, formerly a part of the Rivers and Harbors Appropriation Act of 1899, is controlling. It is important to the extent that § 401 requires the submission and approval of “the location and plans” of the bridge, whereas § 491 calls for the submission of “the plans and specifications for its construction, together with such drawings of the proposed construction and such map of the proposed location as may be required for a full understanding of the subject.”

The application for a permit required that there be submitted, among other things, the following: “(b) Plan of the bridge showing the length and height of spans, width of draw openings, position of piers, abutments, fenders, etc., and those features which affect navigation, giving on both horizontal sections and elevations the outside structure lines separating the area left for navigation from the area occupied by the bridge, and, in figures, the least clear width of openings at right angles to the axis of the channel, and the least clear heights with reference to high water, ordinary *925 boating water, and low water, (c) The essential features of the draw in two positions, closed and fully open.” These particulars were contained within the so-called “plans” accompanying the application of the Sanitary & Drainage Commission of Charleston County for a permit to construct the bridge in question. The “plans” approved consist of one ordinary letter-size sheet entitled “Plan and Profile for Proposed Reconstruction of Bridge.” It reveals the 138 feet clear opening between the raised bascule spans, but demonstrates nothing with respect to the location of the gear racks. Appellant contends that as the gear racks constitute a “feature which affects navigation”, a violation of the permit follows.

It now appears from the testimony following remand that neither the Secretary of War nor the Chief of Engineers had before them the detailed drawings and specifications at the time of the issuance of the permit. The District Court has found, upon credible evidence, that the protrusion of the gear racks was not a feature affecting navigation, and was not required to be shown on plans submitted for approval. Such a finding is amply supported in the procedures followed by the Army Engineers. While undoubtedly additional particulars could have been required as a prerequisite to the issuance of the permit under 33 U.S.C.A. § 401, they were not demanded as to this application. Moreover, the interpretation placed on the permit and so-called “plans” by the Army Engineers is entitled to weight. Baltimore & Ohio R. Co. v. Jackson, 353 U.S. 325, 77 S.Ct. 842, 1 L.Ed.2d 862; United States v. Zucca, 351 U.S. 91, 76 S.Ct. 671, 100 L.Ed. 964. The interpretation of the requirements established by the Army Engineers furnishes a rational basis for its conclusions and may not be disturbed by judicial action in such instances. Rochester Tel. Corp. v. United States, 307 U.S. 125, 146, 59 S.Ct. 754, 83 L.Ed. 1147.

As so interpreted by the administrative agency, the word “plans” as denominated in 33 U.S.C.A. § 401 does not contemplate the submission of detailed drawings and specifications, unless specifically demanded by the agency as a condition to the issuance of the permit. The burden rests upon the party asserting the statutory fault to establish same. As to the protruding gear racks this burden has not been met and, on this point, no fault exists which calls for the application of the Pennsylvania rule.

We turn to the overhanging bascul® span which, as noted, is an admitted violation of the permit. The District Court, at the first trial, did not consider the Pennsylvania rule and predicated its finding on lack of proximate cause. On remand the trial court applied the Pennsylvania rule and concluded that there was no reasonable possibility that the destruction of the bascule span, which occurred at an angle of elevation of 71 degrees, would not have occurred had the bridge been elevated to an angle of 80 to 82 degrees.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

In Re Silver Bridge Disaster Litigation
381 F. Supp. 931 (S.D. West Virginia, 1974)
Dow Chemical Co. v. Dixie Carriers, Inc.
330 F. Supp. 1304 (S.D. Texas, 1971)
Bedeian v. Commissioner
54 T.C. 295 (U.S. Tax Court, 1970)
United States v. Sabine Towing & Transportation Co.
289 F. Supp. 250 (E.D. Louisiana, 1968)

Cite This Page — Counsel Stack

Bluebook (online)
278 F.2d 921, 1960 U.S. App. LEXIS 4525, 1960 A.M.C. 1325, Counsel Stack Legal Research, https://law.counselstack.com/opinion/the-tank-steamer-fort-fetterman-libellee-and-chas-kurz-co-inc-ca4-1960.