Tetherton v. United States Talc Co.

58 N.Y.S. 55, 41 A.D. 613
Appellate Division of the Supreme Court of the State of New York·Decided May 9, 1899·Published·Cited by 3 cases

Opinion

MEBW3N, J.

On the 13th day of February, 1897, the defendant was engaged in operating a talc mine at the village of Talcville, St. Lawrence county, and Alfred Tetherton, plaintiff’s intestate, was in its employ as a miner. Upon that day, at about 4:30 in the afternoon. Tetherton, being then at the bottom of the mine, was killed by the fall upon him- of a large mass of material, called in the case a pillar of talc. It is alleged by the plaintiff that the accident was caused by the negligence of the defendant, in that it failed to provide a safe place for the decedent to work in, allowed the mine to become unsafe and insecure, and did not barricade or timber the [56] mine. Upon the trial a general verdict was rendered for the plaintiff for the sum of $3,500. Specific questions were also submitted to the jury, which,.with the answers by the jury, are as follows:

“First. Did the defendant fail to exercise due care in regard to the pillar? Ans. Yes. Second. Did the fall of the pillar result directly from an excessive blast? Ans. Yes. Third. Had the duty of the deceased for the day ceased when the blast went off? Ans. No. Fourth. Was the defendant guilty of negligence? Ans. Yes. Fifth. Was there any negligence on the part of the deceased contributing to the injury? Ans. No. Sixth. What was the amount of damages sustained by the widow and üie next of kin from the death of Tetherton? Ans. $3,500.”

It is claimed by the defendant that the evidence does not warrant the finding of any negligence on the part of the defendant, and that the firing of the excessive blast was the act of a co-employé, and not chargeable to the defendant. The mine had been opened some years before, and it was worked by sinking a shaft into the ground at an angle of about 45 deg. This shaft, at the time of the accident, extended down about 150 feet. Its mouth was 15 to 20 feet wide, and 10 to 12 feet high. It was larger as it went down. In this shaft, for the purpose of removing material from the mine, a railroad track had been laid, on which a car was run by means of a cable connected with an engine upon the top of the bank. The vein of talc which was being mined was on an incline the same as the shaft. The tale was in layers from 2 to 18 inches thick. After the shaft had been sunk about 50 feet, a drift or level was made to tire right, which was extended in that direction from 30 to 35 feet. After the talc was taken from this drift, the shaft was carried down about 25 feet further, and then another drift to the right was made, about the same distance and direction as the first one. This drift seems to have extended as far down as the bottom of the shaft. The lower drift was directly beneath the upper one, following the angle of. the shaft and the vein. At the further end of the lower drift, workmen had, for some days prior to the accident, been engaged in blasting for a passageway up to the further end of the upper drift, and had progressed so that the distance between the two at that point or neck was about 7 feet. The opening of this passageway would sever the connection between the column of talc and the surrounding material on each of its sides, and leave the column in position between the foot wall and hanging wall. In the afternoon in question preparation was made for a blast, at this passageway or neck, under the direction of McCoy, the pit boss, and an unusual amount of powder or dynamite was used. The blast was fired at about 4 o’clock. Before this was done, the decedent and others at work at the bottom of the pit previously went up the shaft to a place of safety, and there remained for 15 or 20 minutes after the firing, when, supposing the danger was over, they returned. About half an hour after the firingj the mass of talc between the two drifts fell. This mass of material, constituting the pillar, was about 30 feet long, 25 feet wide, and 14 to 20 feet thick. It ran from the bottom or foot wall to the top or hanging wall upon a slant. The pillar, in falling, started from the top. Ho portion of the hanging wall dropped with it. Some part of the pillar remained along the foot wall. The decedent had [57] nothing to do with the blasting. The superintendent or foreman of the mine testifies that the blasting and excavation at the passageway, back of the pillar was done by his directions, for the purpose of shifting the car track from the position it occupied to a new route, and one that would be more convenient and economical in taking out the talc.

The fact, as found by the jury, that the fall of the pillar resulted directly from an excessive blast, does not necessarily relieve the defendant. Assume that the blast was excessive by reason of the negligence of McCoy, the pit boss, in disregarding the instructions given to him by the superintendent, still he was engaged in carrying out the plan of the master in the preparation of a new way or appliance to be used in carrying on the work. In Hankins v. Railroad Co., 142 N. Y. 416, 87 N. E. 466, the rule is laid down that, when a servant is injured by the negligent performance of an act or duty which the master, as such, is required to perform, the latter is liable, al-' though the negligence was that of another servant to whom the performance of the act or duty was intrusted, and this' without regard to the rank or title of the person guilty of the negligence; that the master is not relieved from liability in such case by the fact that he has promulgated rules or regulations for the proper performance of the act or duty by his agent, which were disregarded by the latter. It is not clear that the principle of this rule may not be applicable here. Passing, however, this question, there is another phase of the case to be considered.

Free access — add to your briefcase to read the full text and ask questions with AI

Tetherton v. United States Talc Co., 58 N.Y.S. 55, 41 A.D. 613 (N.Y. Ct. App. 1899).

58 N.Y.S. 55 (Tetherton v. United States Talc Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Arras v. Standard Plaster Co.
121 A.D. 61 (Appellate Division of the Supreme Court of New York, 1907)
Tetherton v. United States Talc Co.
60 N.Y.S. 1149 (Appellate Division of the Supreme Court of New York, 1899)