Sommer Corporation, Cross-Appellant v. Panama Canal Company, Cross-Appellee

475 F.2d 292, 1973 U.S. App. LEXIS 11318, 1973 WL 54504
Court of Appeals for the Fifth Circuit·Decided March 5, 1973·No. 71-3379·Published·Cited by 18 cases

Opinion

JOHN R. BROWN, Chief Judge:

What this case presents is whether the failure of a nominal shipper to pay an additional $6.88 for Trans-Isthmian handling charges on equipment directly destined to a Panama Canal Company construction contract limits Canal Company’s liability for cargo damage to less than the full stipulated loss of $9,610.85. For reasons peculiar to the relationship involved we answer in the negative and affirm with modification.

Sommer Corporation brought an admiralty action in personam against the Panama Canal Company for cargo damage arising during the shipment of three packages of transformer radiator cooling fins to a Canal Zone construction project. Canal Company appeals from the District Court’s $9,610.85 judgment in favor of Sommer, .329 F.Supp. 1187, invoking the $500 per package liability limitation prescribed for cargo handling 1 under Canal Company’s published tariff. 2 Sommer cross appeals from the denial of prejudgment interest. We modify and affirm.

On June 30, 1967, Sommer contracted with Canal Company for the installation of a power transformer at the Miraflores Locks substation in the Canal Zone. In accordance with the contract specifications Sommer provided a detailed breakdown of all materials and equipment to be furnished for the project, including descriptive brochures and *294 literature, and there is no dispute that the Construction Division of Canal Company was aware of the approximate actual value ($11,500) of the transformer radiators as a result of the cost estimates prepared under its standard bid procedures.

The contract itself incorporated by reference the provisions of a booklet entitled “General Conditions for Panama Canal Company and Canal Zone Government Construction Contracts (July 1966),” which included an explanation of an optional procedure by which a contractor could secure free ocean freight and rail service for the shipment of construction materials. 3 Since commercial freight service would have increased contractors’ costs by approximately 15%, which would have to be passed on to Canal Company by an increased bid, Sommer elected to utilize this procedure and arranged through its New Orleans freight forwarder for delivery of the transformer radiators from the General Electric plant at Rome, Georgia, to Canal Company’s New Orleans pier. There the shipment was through billed to Balboa (see GC-13(f)(2) note 3, supra) under Canal Company’s standard Short Form Bill of Lading naming Sommer as consignee. 4 This meant that the goods *295 would have to be discharged at Cristobal, loaded onto Canal Company cars for rail transshipment to Balboa, C.Z. The goods arrived safely at Cristobal, but at some undetermined point in time between discharge on the dock and loading aboard Canal Company’s freight cars three of the nine packages in the consignment were crushed, resulting in the damage here in dispute.

Canal Company does not contest the District Court’s holding that the statutory $500 per package limitation of liability imposed by COGSA 5 is inapplicable because the damage occurred after the goods were discharged from the vessel. Likewise, it cannot contend that the contractual limitation contained in Clause 18 of the Long Form Bill of Lading (note 4, supra) is controlling since Canal Company knew of the value far in excess of the $500 limit and the tariff did not prescribe any additional charges for declared excess value. 6 Canal Company's Water Transportation Division, from two certificates stamped on the face of the shortblading, knew that these nine packages (1100 cubic feet, 13,800 lbs.) were for a specified Canal Company contract. No purpose, therefore, would have been served by a declaration in this unique situation.

But the fact that this was a through shipment from New Orleans to Balboa on a through bill of lading which prescribed that Canal Company’s liability would be measured by Clause 18 and COGSA “throughout the entire time the goods are in the custody of the carrier” 7 means that the handling tariff *296 and its restrictive $500 limitation (notes 1 and 2, supra) were in effect substantially modified, if not altogether supplanted or superseded.

In any event the handling Tariff limitation (note 2, supra) is of no help. 8 This is so even though the construction contract provides that the “free” transportation of supplies for Canal Company projects does not include “the Isthmian handling charge which will be for the account of the contractor, at the rates stated in the official PCC tariff schedule.” 9 And in this analysis we may assume that the contractor did not know of, but was charged with knowledge of, the local tariff.

Several things lead to this conclusion. First, whether it amounts to supersession or something less, the blading’s parenthetical phrase of the Clause Paramount for this through shipment limits departures from COGSA to “(except as may be otherwise specifically provided herein)” (Clause 1, note 4, supra). It does not say “except as provided for herein or in other tariffs of carrier.”

Even more important, considering that exculpatory terms of tariffs or contracts of carriage are to be narrowly construed, 10 the provision in the construction contract imposing the costs for port handling on the contractor “at the rates stated in the * * * tariff *297 schedule,” (GC-13(f) (1), note 3, supra), does not undertake to impose on this sort of contractor-shipper any burden to do anything except pay the handling charges. There is, for example, no provision in that contract, or in Part One of the Tariff, for declaring value. And this record is completely silent either as to the work-a-day system set up for such action or, even more significant, why a shipper under a through bill of lading should take any action except — and the except is narrowly circumscribed — pay when billed.

Free access — add to your briefcase to read the full text and ask questions with AI

Sommer Corporation, Cross-Appellant v. Panama Canal Company, Cross-Appellee, 475 F.2d 292, 1973 U.S. App. LEXIS 11318, 1973 WL 54504 (5th Cir. 1973).

475 F.2d 292 (Sommer Corporation, Cross-Appellant v. Panama Canal Company, Cross-Appellee) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related