This text of 149 Ill. App. 111 (Ruddy v. McDonald) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Ruddy v. McDonald, 149 Ill. App. 111, 1909 Ill. App. LEXIS 427 (Ill. Ct. App. 1909).

Opinion

Me. Justice Dibell

delivered the opinion of the court.

The specifications for the heating contained the following provisions: “The contract when awarded will be for a complete and perfect job, even though every item required to make it such is not specially noted in the drawings or these specifications; ’ ’ and also the following: “Contractor shall furnish all labor, tools and appliances necessary to complete his work according to these specifications, and shall perform his work in a true workmanlike manner in every particular and thus provide the building with a durable and mechanically perfect system, and should any defect in his work. appear the contractor shall remedy such defects at his own cost within a reasonable time after receiving a written notice of same.” In Keeler v. Herr, 157 Ill. 57, our Supreme Court used the following language in relation to building contracts which have been performed in all substantial particulars, but where there are slight and unimportant omissions or defects: “In contracts like the one in suit, sometimes called ‘building contracts’, a literal compliance with the specifications is not necessary to a recovery by the contractor. A substantial performance, in good faith, is sufficient. As was said in Sinclair v. Tallmadge, 35 Barb. 602: ‘If there has been no wilful departure from the terms of the contract, or omission in essential points, and the laborer has honestly and faithfully performed the contract in all its material and substantial particulars, he will not be held to have forfeited his right to remuneration by reason of mere technical, inadvertent or unimportant omissions or defects. The law imposes no such liability and enforces no such penalty.’ Glacius v. Black, 50 N. Y. 145, is to the same effect, and in Crouch v. Gutmann, 134 id. 45, it is said: ‘ Then slight defects caused by inadvertence, or unintentional omissions, are not necessarily in the way of recovery of the contract price, less the amount, by way of damages, requisite to indemnify the owner for the expense of conforming the work to that for which he contracted.’ ” This was approved in Shepard v. Mills, 173 Ill. 223, where the court said: “A literal compliance with such contracts is not necessary to a recovery, but it will be sufficient that there has been an honest and faithful performance of the contract in all its material and substantial particulars, and no omission in essential points or wilful departure from the contract; and mere technical or unimportant omissions will not defeat a recovery of the contract price, less any damages however, requisite to indemnify the owner.” Bauer v. Hindley, 222 Ill. 319. Appellant contends that, though this is the ordinary rule, yet because of the language above quoted from the specifications it was essential to the maintenance of a lien in favor of appellee that he should prove an absolute compliance with the specifications in every particular, and also that the work remained perfect for a series of years thereafter. The proof showed a number of slight deviations, and the master made allowances therefor. For some of these deviations the proof showed appellant responsible, and in other cases the deviation was unimportant. In one room the style and size of radiator selected by appellant furnished one foot more of radiation than the specifications called for. In another room the plans provided for a certain number of feet of radiation to be put in a certain place but appellant afterwards selected a different kind of radiator from that required by the plans and specifications, and this newly selected radiator took up more room, so that in the space where the radiator was to be placed one less coil could be inserted than was intended, and as a result the radiation in that room was a few feet less than was called for by the plans. The master deducted the proven cost of this omitted radiation. In other instances of slight deviations the proof by witnesses engaged in that business differed as to whether the appliance used or that called for by the plans was the more useful. We are of the opinion that the law stated in the cases above cited entered into and formed a part of this contract, and that, notwithstanding the langmage above quoted from the specifications, appellee could recover upon establishing a substantial compliance with the contract, though he had not in every particular complied exactly therewith.

Appellant’s main contention is that the heating apparatus was substantially defective; that it would not heat the building in severe cold weather; that it was difficult or impossible to heat all the radiators at the same time; and that there was pounding in certain radiators, and other like defects. The specifications for the heating required the owner to furnish the boiler and pump set in position and ready for the steam and other connections. The owner furnished and put in position what is called by the witnesses an old boiler. Appellee made the connections therewith. The proof shows that when appellee finished the work it was in perfect condition and heated the building perfectly. Appellant’s architect examined it and accepted the work. The perfection of the work at that time is proved not only by appellee and by those working for him but also by the architect and by another servant of appellant. Afterwards appellant became dissatisfied with the boiler which he had furnished. After appellee had completed the work and had left the job appellant removed the old boiler and purchased and installed another boiler, and the connections of that boiler with the pipes were made by the parties from whom he purchased the new boiler, and they were not called as witnesses to show the manner in which they made these connections nor what they did in that regard. The only testimony as to defects in the subsequent operation of the heating plant, except that of appellant himself, comes from men who examined the plant long afterwards, and who found fault with the plant in various respects. Several of these witnesses were very guarded in finding any fault with the work appellee bad done. Upon a consideration of all the evidence upon this subject we do not feel warranted in disturbing the conclusion of the master and of the trial judge on this subject.

It is argued that it was error to allow appellee interest from the date of filing the master’s report to the date of the decree upon the amount found due by the master. The course pursued seems to be expressly authorized by section 3 of chapter 74 of the Revised Statutes which directs that when judgment is entered upon any award, report or verdict, interest shall be computed at the rate of five per cent per annum from the time when made or rendered to the time of rendering judgment and shall be made a part of the judgment. This statute was applied to a master’s report in Goodwin v. Bishop, 145 Ill. 421, where it was held proper to include the interest that had accrued after the master’s report was filed, and proper for the court to compute the interest without a reference, and this has been followed in several cases by the Appellate Courts. Goodwin v. Bishop, supra, was a bill to foreclose a trust deed to secure an interest-bearing debt, and it is argued that the statute is not applicable to a case like this where there was no contract to pay interest. We find no such limitation in section 3 of the Interest Act above referred to. That provision is in terms applicable to every judgment entered upon any award, report or verdict. It has been frequently applied to verdicts awarding damages in actions on the case, where there has been no contract of any kind, and therefore no contract for interest. The Supreme Court in Goodwin v.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Union Steamboat Co. v. Chaffin's Adm'rs
204 F. 412 (Seventh Circuit, 1913)

Cite This Page — Counsel Stack

Bluebook (online)
149 Ill. App. 111, 1909 Ill. App. LEXIS 427, Counsel Stack Legal Research, https://law.counselstack.com/opinion/ruddy-v-mcdonald-illappct-1909.