Roach v. Haynes

72 S.W.2d 532, 189 Ark. 399, 1934 Ark. LEXIS 214
CourtSupreme Court of Arkansas
DecidedJune 11, 1934
Docket4-3489
StatusPublished
Cited by12 cases

This text of 72 S.W.2d 532 (Roach v. Haynes) is published on Counsel Stack Legal Research, covering Supreme Court of Arkansas primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Roach v. Haynes, 72 S.W.2d 532, 189 Ark. 399, 1934 Ark. LEXIS 214 (Ark. 1934).

Opinion

Butler, J.

T. W. Roach, the appellant, is engaged in the work of the construction of levees, and as a part of his equipment a tower machine was in use. This machine is composed of a tower about one hundred feet high with cables, engines, etc., installed thereon. It was used for placing dirt on the levee by means of buckets or scoops moving on cables from a point between the levee and the river. This structure moved on wheels along a track made of cross ties and heavy timbers, constructed in sections called “mats.” As the work progressed the tower was pulled along the track by means of a cable which was fastened to a “dead man” and wound around a drum, thence back under the machine. After the machine passed over one section the cable was attached to that section, which was then pulled underneath the machine to the front so that the machine could pass over it again. A small steam engine was used in pulling the machine forward and also for bringing forward the “mats” or sections. This engine was located on a platform about twenty feet above the ground floor. The floor of the machine was about six feet above the ground level at the rear and about four feet in front. It was constructed in this manner because it operated on a slope.

The appellee Haynes was in the employ of the appellant and in charge of the operation of the tower machine. On the 10th of October, 1932, in the regular course of his employment, the appellee was under the machine taking some measurements at a time when the ‘£ mat ’ ’ over which the machine had just passed was about to be pulled forward. On a given signal the engine was started suddenly by the application of a full head of steam which caused the cable to vibrate violently from side to side, striking Haynes and severely injuring him. This suit was brought to recover damages for such injuries, and resulted in a verdict and judgment in favor of the appellee, from which is this appeal.

It is contended that the injury was the result of a risk assumed by the appellee; that there was no negligence on the part of the appellant proved, that the cause of the injury was the negligence of the appellee, and, lastly, that the case was submitted to the jury on improper instructions.

In determining these questions, under settled rules, we must view the evidence with every reasonable inference arising therefrom in the light most favorable to the appellee, and which so considered may be thus stated: The appellee was experienced in the nature of the work he was performing and aware of the danger ordinarily incident thereto. He had been in the employ of the appellant for some time before the accident occurred and had operated the tower machine, beginning about the first of August, 1931, for a few months. Por an interval for some reason the machine was not in operation, and then about July, 1932,' while the machine was at Greenville, Mississippi, appellant obtained a contract to construct a levee near Grand Lake in Chicot County, Arkansas. The machine was moved there and work began on that job about July 10th with Haynes in charge of the operation of the machine. At the time of the removal of the equipment, between the first and the tenth of July, Haynes notified the appellant that the small engine used for moving the machine forward and for bringing forward the “mats” was worn and defective. The appellant promised that he would have it repaired when it was taken “to the lower job.” The defects were described to be the result of a worn condition, which caused about a fifty per cent, loss of power. The cylinders and pistons were worn, and, if the engine was started in the proper manner, it would come “on center” and stop. This necessitated the opening of the throttle wide and letting the steam start with full head in order that the engine would operate. This would cause the slack in the cable to be taken up quickly, resulting in the cable whipping from one side to the other. If the engine had been in proper condition, the proper manner of operation was -to start it slowly, gradually applying the cable and tightening it before applying full steam. The engine could not be repaired while on the job, and it would be necessary to stop operations and take it to some machine shop for the repairs to be made. The engine was not repaired before beginning work on the lower job, and Haynes called that fact to the attention of Mr. Frank Grant, who, according to the claim of Haynes, was the superintendent of the job. Grant promised several times to have it fixed at the first favorable opportunity when something would occur— such as rains or anything else which would cause the work to stop for a time — and that, on the occurrence of an event of this nature, the engine would be taken to the shop at Greenville and there be repaired. Relying on the promise of the appellant and Grant, Haynes continued to operate the tower machine up until the time of his injury and, not realizing the extent of his injury, operated it for some time longer.

The above facts are drawn from the testimony of the appellee. There was no dispute in the testimony as to the defective condition of the engine. As to the promise of repair, Mr. Roach, when asked if Haynes had made complaint to him at Greenville about the engine being defective, answered, “Not that I remember.” Mr. Grant, in testifying regarding the notice as to the defective condition of the engine claimed by Haynes to have been given him and as to whether or not it was before or after the injury, when asked, “Did he ever make any such complaint to you,” answered, “I don’t think so — not before then. He did afterwards.”

It will be observed that there were positive statements of Haynes regarding the notice and promise of repair both given to and made by Roach and Grant, while there is not a positive denial by them of those facts. There was therefore sufficient substantial evidence to warrant the conclusion of the jury that such notice was given and the promise of repair made.

There is a conflict in the testimony relative to the position Grant occupied and as to whether or not he was clothed with authority to represent the appellant with respect to shutting down the work for the purpose of having the engine repaired. Haynes testified that Grant was general superintendent, and that, while he himself directed the operation of the tower machine, kept it in shape, and did such repairs to its structure or machinery as might be done without serious interruption of the work, the general supervision of the work was under Grant, from whom he received hisi orders. The testimony of Boach details the particular duties required of Grant, and that Haynes “was superintendent of the tower machine and had charge of all the machinery, ’ ’ but did not deny that given by Haynes to the effect that Grant was in charge of the general supervision of the work and that Haynes took his orders from him. The testimony of Grant relative to this told of his specific duties, which were that of a timekeeper and commissary man, and the statement that he did not have anything to do with the operation of the tower machine. But there was no denial by him of that part of the testimony of Haynes to the effect that he was clothed with general supervision of the work. We think that the evidence as to the authority of Grant to receive the notice of the defective condition of the engine and to have the repairs made is sufficient to justify the submission of that question to the jury, and its conclusion that he had such authority is binding on us, and therefore notice to him was as effectual as if made to the appellant himself.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Louis B. Siegel Company, Inc. v. Moore
161 S.W.2d 387 (Supreme Court of Arkansas, 1942)
Arkansas State Highway Commission v. Jelks
159 S.W.2d 465 (Supreme Court of Arkansas, 1942)
Collett v. Loews
158 S.W.2d 658 (Supreme Court of Arkansas, 1942)
New York Life Insurance Company v. Weeks
148 S.W.2d 330 (Supreme Court of Arkansas, 1941)
Faulkner v. Big Rock Stone Material Company
143 S.W.2d 883 (Supreme Court of Arkansas, 1940)
Temple Cotton Oil Co. v. Brown
132 S.W.2d 791 (Supreme Court of Arkansas, 1939)
Missouri Pacific Transportation Co. v. Jones
122 S.W.2d 613 (Supreme Court of Arkansas, 1938)
Missouri Pacific Railroad Co. v. Dotson
111 S.W.2d 566 (Supreme Court of Arkansas, 1937)
D. F. Jones Construction Co., Inc. v. Lewis
98 S.W.2d 874 (Supreme Court of Arkansas, 1936)
Missouri Pac. R.R., Baldwin, Tr. v. Westerfield
92 S.W.2d 862 (Supreme Court of Arkansas, 1936)
Mutual Benefit Health & Accident Ass'n v. Basham
87 S.W.2d 583 (Supreme Court of Arkansas, 1935)
Trinityfarm Construction Co. v. Brannam
82 S.W.2d 523 (Supreme Court of Arkansas, 1935)

Cite This Page — Counsel Stack

Bluebook (online)
72 S.W.2d 532, 189 Ark. 399, 1934 Ark. LEXIS 214, Counsel Stack Legal Research, https://law.counselstack.com/opinion/roach-v-haynes-ark-1934.