Reardon v. United States

731 F. Supp. 558, 20 Envtl. L. Rep. (Envtl. Law Inst.) 20698, 30 ERC (BNA) 2073, 1990 U.S. Dist. LEXIS 1611, 1990 WL 15432
CourtDistrict Court, D. Massachusetts
DecidedFebruary 6, 1990
DocketCiv. A. 89-2278-C
StatusPublished
Cited by12 cases

This text of 731 F. Supp. 558 (Reardon v. United States) is published on Counsel Stack Legal Research, covering District Court, D. Massachusetts primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Reardon v. United States, 731 F. Supp. 558, 20 Envtl. L. Rep. (Envtl. Law Inst.) 20698, 30 ERC (BNA) 2073, 1990 U.S. Dist. LEXIS 1611, 1990 WL 15432 (D. Mass. 1990).

Opinion

CAFFREY, Senior District Judge.

This case is before the court on plaintiffs’ motion for a preliminary injunction restraining the defendants from imposing a federal lien on the plaintiffs’ property pursuant to section 107(i) of the Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”), as amended, 42 U.S.C. § 9607(1). The plaintiffs, Paul and John Reardon (the “Rear-dons”), filed this action against the defendants, the United States and the United States Environmental Protection Agency (“EPA”) asserting three counts in their complaint. First, the Reardons claim that they are “innocent landowners” under section 107(b) of CERCLA, 42 U.S.C. § 9607(b), and, consequently, they are not liable to the EPA for the cost of removing contaminated soil from their property or studying future long-term remedies for the site. Second, the Reardons assert that the EPA’s imposition of a federal lien under section 107(i) of CERCLA, 42 U.S.C. § 9607(Z), constitutes a deprivation of their property and violates their rights of procedural due process under the fifth amendment. Third, the Reardons allege that the EPA exceeded its statutory authority under section 107(Z) of CERCLA, 42 U.S.C. § 9607(1), by placing the federal lien on all their property rather than just the parcels affected by the EPA cleanup. The plaintiffs seek declaratory judgment as to their liability under count one and a preliminary injunction as to counts two and three. For the reasons stated below, counts one and three should be dismissed for lack of subject matter jurisdiction, and, as to count two, plaintiffs’ motion for preliminary injunction should be denied.

I.

The property at issue in this case is a 16-acre parcel of grassy field in Norwood, Massachusetts. The property, now called *560 Kerry Place, is situated between a residential neighborhood along Pellana Road and an industrial manufacturing plant along Route One. For many years, the land was vacant and neighborhood children used the field as a playground.

Prior to 1979, Kerry Place was part of a larger 25-acre parcel which included the manufacturing plant. On October 10,1979, the Grant Gear Realty Trust purchased the manufacturing facility and the fenced area around the plant (the “Grant Gear property”). On November 10, 1979, the Rear-dons, in partnership with Paul J. Birmingham, purchased the remaining property and renamed the principal parcel Kerry Place. The Reardons intended to develop the property commercially.

On April 1, 1983, a resident of Pellana Road reported to the Massachusetts Department of Environmental Quality and Engineering (“DEQE”) that Kerry Place had been contaminated with industrial wastes from prior owners of the manufacturing plant. DEQE investigators responded to the complaint and sampled soils from Kerry Place and the Grant Gear property. The DEQE discovered high levels of polychlori-nated biphenyls (“PCBs”) at certain “hot spots” on both of the properties. Certain samples from Kerry Place contained more than 110,000 parts per million (ppm) of PCBs; the accepted safe levels for PCBs in the environment is 50 ppm. 1

The contamination was concentrated along a fence marking the boundary between Kerry Place and the Grant Gear property. Upon further investigation, the DEQE learned that, since its first operation in 1942, the manufacturing plant had produced electrical equipment and electrical components. Electrical manufacturers commonly use large quantities of dielectrical fluid which contains PCBs. The DEQE investigators concluded that companies at the Grant Gear property, stretching back many years, had dumped toxic wastes and carcinogens across the fence onto Kerry Place.

On June 19, 1983, the EPA dispatched a technical assistance team to investigate the site. The EPA discovered PCB concentrations ranging from 5,000 to 220,000 ppm in soil samples from Kerry Place and the Grant Gear property. The EPA authorized an immediate cleanup of the contaminated areas.

From June 24 to August 1, 1983, the EPA conducted a full-scale CERCLA removal action at Kerry Place and the Grant Gear property. The EPA removed 518 tons of contaminated soil from both properties, and the soil was trucked to Model City, New York for disposal. The EPA funded this removal action which cost about $200,-000.

In August 1983, the Reardons began to build a road along the fence between Kerry Place and the Grant Gear property. The Reardons also excavated a trench along the fence line. The Reardons notified the EPA of their actions, but the road construction was not done under EPA supervision. As a result of the new grading and excavation, the EPA retested the soil along the roadway. The samples showed PCB contamination as high as 11,000 ppm along the fence line of the Kerry Place property.

In 1984, the Reardons began selling parts of Kerry Place to various new owners. Kerry Place was subdivided into eight lots along the new road, and four of the lots were transferred to various commercial interests. The Reardons retained ownership of the remaining lots at Kerry Place.

In 1985, the EPA notified the Reardons by letter that they may be liable for the costs of cleanup at Kerry Place pursuant to sections 106 and 107 of CERCLA, 42 U.S.C. §§ 9606, 9607. The EPA identified the Reardons, along with ten other present and prior owners of the properties, as potentially responsible parties for the contamination. The letter explained that the Rear-dons, as an owner of the property, may be held liable for the cost of the EPA removal action. The letter, however, did not state the amount of possible liability.

*561 In 1987, the EPA undertook a long-term remedial investigation and feasibility study (“RI/FS”) of the remaining contamination at the Kerry Place and Grant Gear properties. In April 1988, EPA Project Manager Jane Downing met with one of the Rear-dons to discuss the preliminary results of the field investigations. Sometime after-wards, Downing learned that the Reardons intended to remove certain contaminated soil on their own so that they could develop the property. On October 20, 1988, Downing wrote a letter to the Reardons informing them of the test results from sampling data which would be used in a draft RI/FS and Downing requested the Reardons to keep her informed of any removal actions taken at the site. On December 2, 1988, Downing forwarded a list of potential hazardous waste transporters to the Reardons, and reminded the Reardons to coordinate any removal actions with the EPA. In January 1989, the Reardons informed Downing they had completed their own removal action at Kerry Place. 2

On March 23, 1989, the EPA filed a notice of lien with the Norfolk County Registry of Deeds on the Reardons’ remaining lots at Kerry Place pursuant to section 107(Z) of CERCLA, 42 U.S.C.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Ltd. v. Garcia-Padilla
201 F. Supp. 3d 223 (D. Puerto Rico, 2016)
United States v. American Color & Chemical Corp.
858 F. Supp. 445 (M.D. Pennsylvania, 1994)
United States v. American Color and Chemical Corp.
832 F. Supp. 106 (M.D. Pennsylvania, 1993)
Snediker Developers Ltd. Partnership v. Evans
773 F. Supp. 984 (E.D. Michigan, 1991)
City of Eureka, Mo. v. United States
770 F. Supp. 500 (E.D. Missouri, 1991)
Barmet Aluminum Corp. v. Reilly
927 F.2d 289 (Sixth Circuit, 1991)
Barmet Aluminum Corporation v. Reilly
927 F.2d 289 (Sixth Circuit, 1991)
Werlein v. United States
746 F. Supp. 887 (D. Minnesota, 1990)
Juniper Development Group v. United States
774 F. Supp. 56 (D. Massachusetts, 1990)
Apache Powder Co. v. United States
738 F. Supp. 1291 (D. Arizona, 1990)

Cite This Page — Counsel Stack

Bluebook (online)
731 F. Supp. 558, 20 Envtl. L. Rep. (Envtl. Law Inst.) 20698, 30 ERC (BNA) 2073, 1990 U.S. Dist. LEXIS 1611, 1990 WL 15432, Counsel Stack Legal Research, https://law.counselstack.com/opinion/reardon-v-united-states-mad-1990.