Power v. Village of Hibbing

233 N.W. 597, 182 Minn. 66, 1930 Minn. LEXIS 1302
CourtSupreme Court of Minnesota
DecidedDecember 12, 1930
DocketNos. 28,124, 28,125.
StatusPublished
Cited by8 cases

This text of 233 N.W. 597 (Power v. Village of Hibbing) is published on Counsel Stack Legal Research, covering Supreme Court of Minnesota primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Power v. Village of Hibbing, 233 N.W. 597, 182 Minn. 66, 1930 Minn. LEXIS 1302 (Mich. 1930).

Opinion

Olsen, J.

These are appeals by Dottie M. Power and Itasca Bazaar Company from orders denying their motions for new trials.

One action was brought by Dottie M. Power as the owner of the real estate, consisting of four lots and a business building thereon in the village of Hibbing, and the other by the Itasca Bazaar Company, the tenant of the building. In each case damages are sought to be recovered because of water and sewage backing up in the sewer in the alley in the rear of the premises and flowing back through the connecting pipes and entering and flooding the basement of the building.

The court at the close of the evidence directed verdicts in defendant’s favor. Motions for new trials were made and denied. The questions presented are whether the court erred in directing the verdicts or in denying the motions for new trials. No errors occurring at the trial in other respects are claimed. The two cases were tried together. Mrs. Power ,owns the Bazaar company, and the two suits may be considered as one case.

Plaintiff seeks recovery on several grounds: (1) That defendant was negligent in maintaining for a number of years the sewer in question in the condition in which it was; (2) that the flooding in question was a trespass; (3) that the maintenance of the sewer in the condition in which it was constituted or resulted in a nuisance.

Negligence in- the plan or construction of the sewer is not alleged. The claim is that the village was negligent in permitting *68 roof water from a number of buildings to continue to be drained into the sewer, originally constructed as a sanitary sewer, and that thereby the capacity of the sewer was overtaxed so that the water and sewage therein backed up into the basement of plaintiff’s business building and caused damage. Plaintiff’s building was constructed in 1921. A storm sewer was located in front of the building and a sanitary sewer in the alley in the rear thereof. The sewer system was constructed in 1914 to 1918. It ivas a dual system for storm or surface water sewers and separate sanitary sewers to-carry the sewage from dwellings and business buildings. The basement floor in plaintiff’s building was about 18 inches above the sanitary sewer. Toilets were placed on the basement floor, and there were also drainage outlets at other places in the floor. These toilets and drainage outlets were connected with the sewer by pipes coming in under the basement floor. In the pipe leading from the floor drains a check valve was placed, which in the opinion of plaintiff’s engineer was sufficient to prevent back-water from the sewer from coming into the basement through the floor drains. No such valve was placed in the pipe leading from the toilets. As to whether such a check valve in that pipe would be practical or efficient, the testimony of the engineers is somewhat in conflict. As originally constructed the sanitary sewer past plaintiff’s premises was 8 inches in diameter. Further down stream it increased to 12, then to 15, and finally to 18 inches. The proprietors of some 47 buildings above plaintiff’s premises and of 27 below that point drained the roof water from their buildings, together with the sewage from inside the buildings, into this sewer. Some flooding of plaintiff’s basement occurred in 1923 and prior thereto. She presented to the village a claim for damages for floodings • in 1923, and a settlement was made therefor by the village in February, 1925, and for all damages prior to such settlement. There was no flooding causing any damage in 1924. Plaintiff made no further claim or complaint until after the rainstorm on June 9, 1929, hereinafter described.

In 1923 the village passed a general ordinance prohibiting the drainage of roof water into sanitary sewers. The ordinance is not *69 in the record, and it does not appear that it required roof water drains already connected to be disconnected from such sewers.

Early in 1924 the village enlarged the sewer past plaintiff’s premises to a 12-inch sewer. Defendant’s engineer testified that the sewer as so enlarged had a capacity of 83,000 gallons of flow per hour, and that the roof water and sewage coming into 'it, with a maximum rainfall of 1.4 inches per hour, would amount to 49,260 gallons per hour. The records since 1914 showed the highest rainfall in the locality as being 1.72 inches in one day. A greater rainfall than 1.4 inches in one hour was not known or anticipated. Plaintiff’s engineer-witness conceded that the sewer had sufficient capacity to carry the roof water and sewage past plaintiff’s premises under ordinary conditions of rainfall unless there were obstructions below that point or excessive amounts of water coming in below so as to cause the water to back up. There were several laterals, most of them short, and most of them coming in where the sewer was 15 and 18 inches in size. Near the outlet was a vertical drop of 10% feet. No obstruction in the sewer was shown, and the amount of water coming in from the laterals, or the effect thereof, is not shown.

There are general statements in the evidence that plaintiff’s basement, and the basements of others were to some extent flooded by water, claimed to have come from this sewer, prior to 1929. The dates and circumstances thereof are not shown. As the case stood at the close of the evidence, plaintiff, if entitled to recover, was limited to recovery for damages caused by the flooding of June 9, 1929. The rainfall on that day was an extraordinary occurrence and such a one as the defendant village could not reasonably anticipate or be required to guard against. There was a rainfall of 3.05 inches in 45 minutes, and a total of 5.12 inches in less than four hours. It might well be referred to as a cloud-burst. It washed out bridges and roadways, flooded streets and property generally, and caused great damage. It overtaxed this sewer and caused water to back through the toilets in plaintiff’s basement so as to cover the basement floor to a depth of from five to seven inches.

*70 Plaintiff invokes the rule of res ipsa loquitur, and cites Gould v. Winona Gas Co. 100 Minn. 258, 111 N. W. 254, 10 L.R.A.(N.S.) 889. The rule there applied is the well known rule that where an instrumentality or agency fails to work under proper working conditions such failure is evidence of the insufficiency or defective condition of the instrumentality or agency. The rule has no application where such failure is caused by some extraordinary occurrence which could not reasonably be anticipated or guarded against and which the instrumentality or agency ivas not designed or intended to meet or care for. The Gould case recognizes the limitations of the rule by pointing out that there was in that case no extraordinary occurrence or act of God and that reasonable care in such matters has reference to the known and varying climatic conditions.

The evidence before us was insufficient to justify any recovery on the ground of negligence on the part of the defendant in maintaining this sewer.

Could the plaintiff under the evidence in this case recover on the ground of trespass or of nuisance? We think not. Negligence is not necessarily one of the material elements of trespass or nuisance. Trespass is often used as the equivalent of tort or wrong. 26 R. C. L. 930.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Doug Blaine v. City of Sartell, County of Stearns
865 N.W.2d 723 (Court of Appeals of Minnesota, 2015)
Curtis v. Dewey
475 P.2d 808 (Idaho Supreme Court, 1970)
Segal v. Bloom Brothers Co.
82 N.W.2d 359 (Supreme Court of Minnesota, 1957)
Pettinger v. Village of Winnebago
58 N.W.2d 325 (Supreme Court of Minnesota, 1953)
Shann v. City of Rapid City
35 N.W.2d 399 (South Dakota Supreme Court, 1948)
H. Christiansen & Sons, Inc. v. City of Duluth
31 N.W.2d 270 (Supreme Court of Minnesota, 1948)
Roche v. City of Minneapolis
27 N.W.2d 295 (Supreme Court of Minnesota, 1947)
Hanson v. City of Montevideo
249 N.W. 46 (Supreme Court of Minnesota, 1933)

Cite This Page — Counsel Stack

Bluebook (online)
233 N.W. 597, 182 Minn. 66, 1930 Minn. LEXIS 1302, Counsel Stack Legal Research, https://law.counselstack.com/opinion/power-v-village-of-hibbing-minn-1930.