Pepe v. Center for Jewish History, Inc.

59 A.D.3d 277, 873 N.Y.S.2d 571
CourtAppellate Division of the Supreme Court of the State of New York
DecidedFebruary 19, 2009
StatusPublished
Cited by7 cases

This text of 59 A.D.3d 277 (Pepe v. Center for Jewish History, Inc.) is published on Counsel Stack Legal Research, covering Appellate Division of the Supreme Court of the State of New York primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Pepe v. Center for Jewish History, Inc., 59 A.D.3d 277, 873 N.Y.S.2d 571 (N.Y. Ct. App. 2009).

Opinion

Order, Supreme Court, New York County (Michael D. Stall-man, J), entered April 28, 2008, which, in an action under the Labor Law for personal injuries, after granting plaintiffs motion for summary judgment on his Labor Law § 240 (1) cause of action against the building owner (the Center for Jewish History, Inc. [CJH]), insofar as appealed from, denied the motion of third-party defendant-appellant masonry subcontractor (D’Aprile) for summary judgment dismissing CJH’s third-party claim against it for contractual indemnification, unanimously reversed, on the law, without costs, D’Aprile’s motion granted, and CJH’s third-party claim against D’Aprile for contractual indemnification dismissed.

Plaintiff, an employee of the general contractor, was assigned on the day of the accident to clear debris from the roof. It appears that a ramp connecting the roof to the exterior elevator had been removed, and that in order to access the roof, plaintiff hopped over the parapet wall that D’Aprile was then in the process of constructing, landing on unsecured plywood planking covering a hole in the roof, and falling through with resulting injury. D’Aprile’s subcontract, which required it to construct the parapet wall on the building’s facade and was performed entirely by use of scaffolds, did not require access to or work on the roof, and did not impose a duty to provide plaintiff with a safe means of accessing the roof. The motion court found that no issues of fact exist as to either D’Aprile’s nonnegligent performance of its contract or its lack of any involvement in the creation of the hole on the roof or the installation or maintenance of the plywood covering the hole. It did find, however, that an issue of fact exists as to whether the removal of the ramp was a necessary step in D’Aprile’s erection of the parapet wall, and, as a consequence, that an issue of fact exists as whether the accident “arose out of’ or “in connection with” D’Aprile’s work within the meaning of the broad indemnifica[278]*278tion clause in D’Aprile’s subcontract on which CJH relies. We disagree. The connection between plaintiffs accident and the mere existence of the partially constructed wall where the ramp formerly had been is too tenuous to trigger the indemnification clause (see Worth Constr. Co., Inc. v Admiral Ins. Co., 10 NY3d 411, 415-416 [2008]). A contrary conclusion is not required by the clause in D’Aprile’s subcontract authorizing it to disturb any existing structures if necessary to do its masonry work. Even if D’Aprile did remove the ramp in order to perform its work—and there is no evidence that it did—and even if removal of the ramp and location of the commencement of the erection of the wall forced plaintiff to climb over the wall in a place that put him close to the hole, plaintiff was not performing work that was even remotely related to D’Aprile’s masonry work, and the ramp was neither an instrumentality for which D’Aprile was responsible nor a tool or material supplied by or needed by D’Aprile to perform its work (cf. Balbuena v New York Stock Exch., Inc., 49 AD3d 374, 376 [2008]; Urbina v 26 Ct. St. Assoc., LLC, 46 AD3d 268, 271-273 [2007], citing inter alia Torres v Morse Diesel Intl., Inc., 14 AD3d 401 [2005]). In short, plaintiff was injured not because the ramp had been removed, but because someone had removed the secure covering over the hole that everyone, including plaintiff, thought was still in place, and replaced it with a flimsy, unsecured piece of plywood. We have considered CJH’s remaining contentions and find them unavailing. Concur—Tom, J.P., Moskowitz, Acosta and Freedman, JJ. [See 19 Misc 3d 1130(A), 2008 NY Slip Op 50950(11).]

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Walsh v. New York City Hous. Auth.
2026 NY Slip Op 30848(U) (New York Supreme Court, New York County, 2026)
Stewart v. JMDH Real Estate Offs., LLC
2024 NY Slip Op 34166(U) (New York Supreme Court, New York County, 2024)
Torres-Quito v. 1711 LLC
2024 NY Slip Op 01279 (Appellate Division of the Supreme Court of New York, 2024)
Basile v. Legacy Yards Tenant LP
205 A.D.3d 531 (Appellate Division of the Supreme Court of New York, 2022)
Hammond v. Toy Industry Ass'n
8 F. Supp. 3d 484 (S.D. New York, 2014)
Cohen v. New York City Industrial Development Agency
91 A.D.3d 416 (Appellate Division of the Supreme Court of New York, 2012)
Bovis Lend Lease LMB Inc. v. Garito Contracting, Inc.
65 A.D.3d 872 (Appellate Division of the Supreme Court of New York, 2009)

Cite This Page — Counsel Stack

Bluebook (online)
59 A.D.3d 277, 873 N.Y.S.2d 571, Counsel Stack Legal Research, https://law.counselstack.com/opinion/pepe-v-center-for-jewish-history-inc-nyappdiv-2009.