Opinion
POTTER, J.
Statement of the Case
This is an appeal from a judgment in two consolidated actions in which appellants seek to prevent respondent Division of Highways of the Department of Public Works of the Business and Transportation Agency of the State of California (hereinafter “Division of Highways”) from carrying out a proposed state highway project known as the Lompoc Bypass, a freeway.
Appellants Bosio and Gherini were named as defendants in a condemnation action (No. SM 11049) commenced by respondent on May 25, 1972, to acquire property for use as right-of-way for the highway project. Their demurrer to the complaint filed October 4, 1972, raised the [501] objection that the complaint did not show whether an environmental impact study and report had been made with respect to such project. That demurrer was overruled on January 24, 1973. In an accompanying statement of reasons the court said, “The proper way to reach this problem would be for the defendants to raise the defense by answer, together,with a cross-complaint for injunctive relief.” On March 7, 1973, such an answer and a cross-complaint to restrain further progress of the project were filed, asserting that it would have a significant effect upon the environment and that respondent Division of Highways had not complied with the environmental impact report (hereinafter “EIR”) requirement of the California Environmental Quality Act (hereinafter “CEQA”). Demurrers and motions to strike the affirmative defense and cross-complaint and for summary judgment thereon were made by respondent; these resulted in an order of June 5, 1973, sustaining the demurrer to and motion to strike the affirmative defense but overruling the demurrer and denying the motion to strike and motion for summazy judgment on the cross-complaint. The trial court thereupon severed the cross-complaint for injunctive relief from the other issues in the condemnation action.
The stated basis of the court’s orders sustaining the demurrer to and striking the affirmative defense was its holding that the issue of alleged noncompliance with CEQA was not available as a defense to forestall the taking of the property by condemnation. An appeal by appellants Bosio and Gherini from these orders was dismissed by this court on the grounds of nonappealability and mootness, on February 2, 1974. Further attempts to obtain appellate review by extraordinary writ were also unsuccessful, and the condemnation action is still pending, but inactive.
The other action (No. SM 13017) commenced July 12, 1973, by appellants Preserve Lompoc’s Unique Surroundings (hereinafter “PLUS”)1 and Homeowners Security Alliance (hereinafter “Alliance”)2 was a petition for writ of mandamus; in it these appellants, as “concerned” citizens and “in the capacity of private attorneys general,” also attacked respondent’s determination to carry out the project without first complying with the requirements of CEQA.
[502] Responsive pleadings were filed by respondent in both actions, raising the affirmative defense of laches. Thereafter, a supplemental cross-complaint was filed in No. 11049 by appellants Bosio and Gherini, (1) raising additional issues under the National Environmental Policy Act (hereinafter “NEPA”), (2) asserting, in addition to their own interests as condemnees, “the interests of the general public in requiring the cross-defendant to comply with both the National Environmental Policy Act and the California Environmental Quality Act,” and (3) seeking fees and court costs for “acting as a private attorney general.”
The two actions were then consolidated for an early trial which commenced on July 25, 1973. After 11 days of trial, the matter was submitted. On August 13, 1973, the court announced its intended decision in favor of respondent on the dual bases that it had complied with all requirements of CEQA and that the actions of appellants were barred by laches. The NEPA was found inapplicable by reason of respondent’s good faith determination not to qualify the project for federal funds.
Immediately following the filing of the memorandum opinion, respondent indicated its intent to proceed with the project by letting a contract for its construction. Upon application to this court, further activity to carry out the project was ordered halted on August 22, 1973. Subsequently, a peremptory writ issued, extending that order until disposition of this appeal.3
Findings were requested by appellants. When proposed findings were lodged by respondent, appellants filed (1) objections to the proposed findings, (2) counterfindings, and (3) request for special findings. The court signed findings and conclusions on November 2, 1973. These were followed on November 8, 1973, by the judgment adjudging that the applications of appellants for writ of mandate and injunctive relief be denied, and that appellants “take nothing by reason of their cross-complaints, complaints and petitions herein.” This appeal followed.
Facts
This litigation involves the propriety of action taken by respondent Division of Highways with respect to-the Lompoc Bypass, a project to relocate and convert to freeway a segment of Highway No. 1 in Santa Barbara County. As presently constituted, Highway No. 1 follows a route traversing the streets of the City of Lompoc. Lompoc is a small city of [503] some 28,000 residents situated to the south and west of Santa Maria. It is in a valley through which the Santa Ynez River flows northwesterly toward the Pacific Ocean. Both sides of the valley are bordered by coastal hills. The valley proper is largely devoted to agricultural use.
Compliance with CEQA
The project, comprising some five miles of four-lane freeway with four interchanges and a pair of bridges several hundred feet in length across the Santa Ynez River, underwent its original planning phase in the period between 1960 and 1962. Initially it was planned and processed so as to become eligible for federal highway funds, though ultimately the respondent proceeded solely on the basis of state highway funds. In January 1961, respondent held a public meeting in Lompoc to consider alternative locations for the Lompoc Bypass. Interested members of the public attended and were heard; however, the possible effect of the project upon the environment was not discussed at said hearing. On June 21, 1961, the California Highway Commission adopted the present route of the Lompoc Bypass. Thereafter, in 1961 and 1962, respondent consulted with the local agencies and as a result freeway agreements were entered into with the City of Lompoc and with Santa Barbara County providing for the closure of local streets and for access to the freeway in accordance with the provisions of California Streets and Highways Code section 100.2. These agreements showed the general location of the freeway project to be on the west side of the Santa Ynez River adjacent to the easterly portion of the city, and the general placement of interchanges. Geometric maps of the four interchanges were submitted to the Federal Highway Administration which expressed no objection thereto. Under existing informal procedures, this constituted approval thereof.
No further action was taken by respondent to implement the plan to construct the Lompoc Bypass from 1962 until 1969. On September 7, 1969, the Highway Commission approved a budget which authorized $200,000 for right-of-way acquisition for this freeway. Since none of these funds were expended prior to June 30, 1970, they were transferred to the succeeding year’s budget and $100,000 was added thereto, making a total authorization of $300,000 for right-of-way acquisition as of June 17, 1970. On October 22, 1970, another $620,000 was authorized for right-of-way acquisition. As of November 23, 1970, the effective date of CEQA, the sum of $20,525 had been spent for right-of-way acquisition. No funds had been authorized for or expended for costs of construction.
[504] After CEQA became effective on November 23, 1970, generally requiring preparation of an EIR with respect to any projects state agencies proposed “to carry out which could have a significant effect on the environment” (Pub. Resources Code, § 21100), the Division of Highways issued a directive for environmental clearance for California highway projects entitled, “Circular Letter No. 71-7,” effective February 16, 1971, which under the heading “Application” provided:
“Either an Environmental Statement or Negative Declaration will be required on all projects unless regular right-of-way funds (i.e. capital outlay funds exclusive of hardship and protection funds) or construction funds were budgeted for the project prior to November 23, 1970. Major projects (projects on new location or major reconstruction projects on adopted routes) that have advanced beyond the regular right-of-way funding stage must be reviewed to determine if the proposed design minimizes adverse environmental consequences and to examine the highway planning to insure that its environmental consequences were thoroughly considered. Such projects, to the extent practical, should be modified to incorporate additional elements or features identified and considered prudent to minimize environmental harm. This review will be made by appropriate Headquarters and District personnel and representatives of the FHWA. After the review, a determination will be made on the need for Environmental Statements for projects in this category.”
This review procedure, in lieu of a full environmental impact report, was patterned after interim guidelines issued by the Federal Highway Administration on November 24, 1970. Under the federal guidelines, state highway projects which had “received design approval before February 1, 1971,” were required only to undergo “reassessment” by the state agency in consultation with the Federal Highway Administration Division Engineer. Ah environmental impact statement under NEPA was dispensed with unless requested by the Division Engineer.
Respondent Division of Highways considered the project to have received federal design approval. It, therefore, combined the “reassessment” of the project in consultation with the Federal Highway Administration and its own environmental review pursuant to Circular Letter No. 71-7. As a result, an “Environmental Fact Sheet” was compiled. This was submitted to and approved by the Federal Highway Administration and based thereon respondent Division of Highways determined that an environmental impact report was not needed.
[505] As the trial court expressly found, the environmental review of the Lompoc Bypass and the Division of Highway’s final Environmental Fact Sheet did not constitute the preparation of “a detailed environmental impact report (EIR) as defined by section 21100 of the California Environmental Quality Act of 1970.” Due consideration was given to all the matters specified in the Division of Highway’s Circular Letter No. 71-7, that is, the project was reviewed “to determine if the proposed design minimizes adverse environmental consequences and to ensure that its environmental consequences were thoroughly considered,” but there was no comprehensive description of all the environmental consequences of the project nor any consideration given to the alternative of abandoning it. The trial court also found, and neither party disputes the finding that “the Lompoc Bypass is a project which would have a significant effect on the environment, if constructed as proposed.”4
In its Environmental Fact Sheet respondent concluded that additional consideration should be given to a noise barrier, that precautions should be taken “to revegetate all cut and fill slopes with grass compatible with the area,” but that the project “is justified in itself as an environmental help to the City of Lompoc.”- Respondent treated the fact sheet as a determination that the project could proceed without preparation of an EIR. Thereafter, the Lompoc Bypass continued to receive environmental review and consideration. As a result of a study of damage resulting from a 1969 flood of the Santa Ynez River, the bridges across the river were lengthened so as to reduce backwater effects. Erosion studies were made with respect to the major cut at the southern end of the project which resulted in further design details enhancing erosion control and providing for a more natural appearance. An extension of an existing city street in connection with an access road was realigned to avoid the destruction of a grove of trees and the grade of a portion of the freeway was lowered in order to reduce noise in a residential area. As this subsequent review progressed, the Division of Highways continued its preparations to commence construction of the Lompoc Bypass.
[506] Other changes in the design details, not based upop environmental considerations, were considered and adopted. All interchanges were widened from two-lane to four-lane, the median strip was widened to 26 feet and the right-of-way requirements adjusted to compensate therefor.
Concurrently, the Division of Highways proceeded with steps necessary to acquire the right-of-way required for the project and to make provision for its construction. In 1971 and 1972 negotiations with land owners progressed. On March 17, 1971, the State Highway Commission passed a resolution of condemnation of the real property required for the right-of-way. In October 1971 the State Highway Commission made the first allocation or authorization of funds for construction of the project. At that time $9.75 million were authorized for such purpose, with provision made for the money to be available over a period of several years. Right-of-way acquisition continued during 1972 and 1973.
Laches
Considerable evidence was received concerning appellants’ knowledge of the steps being taken by respondent with respect to the Lompoc Bypass from the time of its inception. On the basis of this evidence, the court found that in late 1962 appellants Bosio and Gherini inquired concerning the effect of the project upon their property and in 1963 the right-of-way lines were staked thereon. Thereafter, said appellants were supplied with various information concerning the project. Appellant Gherini was an attorney at law and as such was aware of the environmental laws at the time of their enactment. In February 1971 appellant Gherini spoke to the Board of Supervisors of Santa Barbara County protesting the bypass project but instituted no legal proceedings on environmental grounds until he raised the issue of noncompliance with CEQA by the demurrer filed October 23, 1972, in the condemnation action.
Appellant PLUS became actively engaged in opposition to another freeway project in the Lompoc area. This project, known as the Harris Grade Project, adjoined the Lompoc Bypass project to the north and was designed to connect the north end of the bypass with an existing four-lane expressway which, in turn, connected with another such expressway to Santa Maria. PLUS was formed primarily to challenge the Harris Grade Freeway on environmental grounds and it led an active and extensive opposition thereto, commencing in June 1970. Though [507] PLUS passed a motion to study the impact of the Lompoc Bypass on June 30, 1970, the organization decided to attack the Harris Grade Freeway but make no attack on the Lompoc Bypass. In June 1971 members of PLUS were advised by the Highway Commission that it did not intend to prepare an EIR on the Lompoc Bypass project. In response to an inquiry by the chairman of PLUS in June 1972 the Highway Commission advised that a major portion of the construction funds for the project had been included in the 1972-1973 budget and that the project was then scheduled for advertising in late 1973.
Persons involved in the formation of appellant Alliance first manifested concern with respect to the construction of the Lompoc Bypass in 1961 when they appeared to protest the location of the freeway on the westerly side of the Santa Ynez River. This protest was ultimately withdrawn before the freeway agreements were executed in 1962. Though the Alliance was not formally organized until 1973, the residents of the affected neighborhood, led by persons who later were active in the organization of the Alliance, protested the alignment of the Central Avenue connection to the bypass in 1971 on the basis that it would destroy an existing grove of trees. This activity contributed to respondent’s determination to realign that connection in 1971. Members of that group were at that time supplied with a copy of the Environmental Fact Sheet and of the position of the Division of Highways that it was a sufficient compliance with the CEQA. At that time the recipient of this copy discussed the environmental laws with his attorney with particular reference to the extension of Central Avenue in the immediate area of his property but concluded that he had neither the resources, time or organization to fight the matter.
It was not until June 1973 that the Alliance was formally organized as a homeowners group to oppose the Lompoc Bypass project. This was followed shortly thereafter by their joinder with PLUS in filing their joint petition for mandate in July 1973.
The evidence with respect to the detriment allegedly suffered as a result of appellants’ delay all related to the expenditures made on the project as it progressed, and the circumstances with respect to the bids for its construction.
The evidence with respect to expenditures detailed the costs of acquisition of right-of-way and related expenses. This evidence indicated [508] that by May 25, 1972 (the date the condemnation action against appellants Bosio and Gherini was filed), the total capital outlay for right-of-way acquisition was $93,000, but that the amount obligated in that connection increased to $1,205,000 by October 3, 1972 (the date of the demurrer to the condemnation complaint) mostly as a result of a $962,000 settlement for relocation of plant facilities with one land owner. The court, however, did not make.findings concerning the date or extent of any such expenditures or obligations other than as of the time of trial.
Evidence was received showing that advertising for bids on the construction contract was completed on June 5, 1973, bids were opened June 20, 1973, that the low bid was $350,000 below the state’s estimated cost of construction, and the last date for acceptance was August 13, 1973. Opinions by qualified experts were received indicating that if this low bid were lost, the state would sustain a direct monetary loss of between $700,000 and $1,000,000. The court made a finding to this effect.
As the conclusions of law signed by the court indicate, the judgment in favor of respondent had two independent bases. The first basis was the court’s holding that the National Environmental Policy Act was inapplicable5 and that the requirements of CEQA had been complied with by the environmental review and Environmental Fact Sheet completed in 1971. The second basis for the judgment was the court’s conclusion that the appellants and each of them were barred from any relief in this action by laches and unreasonable delay, by reason of which “the state would be unjustly harmed” if relief were granted.
Contentions
Appellants contend:
(1) That respondent failed to comply with the requirements of CEQA that an EIR be made before proceeding with the Lompoc Bypass Project.
(2) That respondent has failed to comply with the requirements of NEPA that an environmental impact statement be prepared with respect to said project.
[509] (3) That respondent has failed to comply with the public hearing requirements of the Federal Aid Highway Act, as amended, 1968 (23 U.S.C. § 128(a)).
(4) That the court erred in finding appellants barred by laches, and
(5) That appellants are entitled to reasonable attorneys’ fees as private attorneys general.
Respondent takes issue with each of the above contentions of appellants.
Issues
The issues which are dispositive of the merits of this appeal are those created by appellants’ contentions (1) and (4).6 In addition, there is appellants’ claim for attorneys’ fees. The pertinent issues, therefore, are as follows:
1. Did the environmental review undertaken and the Environmental Fact Sheet produced by respondent constitute compliance with CEQA with respect to the Lompoc Bypass Project?
2. Did the court err in finding appellants’ claims barred by laches?
3. Are defendants entitled to an award of attorneys’ fees?
CEQA Was Not Complied With
Appellants’ attack upon the Lompoc Bypass is governed by. the provisions of Public Resources Code section 21168.5, which provides:
“In any action or proceeding, other than an action or proceeding under Section 21168, to attack, review, set aside, void or annul a determination or decision of a public agency on the grounds of noncompliance with this division, the inquiry shall extend only to whether there was a prejudicial abuse of discretion. Abuse of discretion is established if the agency has not proceeded in a manner required by law or if the determination or decision is not supported by substantial evidence.”
[510] The abuse of discretion charged is that respondent has “not proceeded in the manner prescribed by law” because it has proceeded to carry out the project without preparation of an EIR as required by CEQA. The first question, therefore, is the applicability of the EIR requirement.
The facts bearing upon the applicability of the EIR requirement to the Lompoc Bypass are essentially undisputed. The project was initiated almost 10 years prior to the effective date of CEQA. Procedures necessary to establish its location and general design features and to authorize the necessary closures of and connection with local streets were completed within two years thereafter. Though it was a project which would have a significant effect on the environment, no significant consideration was given environmental factors because there were no laws at that time requiring it. Fiscal considerations dictated postponement of the project for several years with the result that the initial authorization of funds for right-of-way acquisition did not occur until approximately one year prior to the effective date of CEQA. Immediately prior to the effective date of the act, additional funds were authorized for right-of-way acquisition, bringing the total to $920,000, but no funds were authorized for construction of the project until October 1971. The action taken by the Highway Commission at that time was described by Mr. Pengilly, principal highway engineer and chief of the Budget Development and Control Branch of the Division of Highways, who testified as follows: “The first state authorization for construction funds for this project was in October 1971.” He further testified that the amount approved was in excess of $9,700,000; however, “it was split-financed so the funds were spread over a several year period.” The provisions of Streets and Highways Code sections 183 and 757 clearly [511] make the State Highway Commission the agency which authorizes expenditure of funds from the State Highway Fund for highway construction.
At the time the above action was taken to authorize the expenditure of over $9.7 million for construction of the Lompoc Bypass without preparation of an EIR, sections 21100 and 21102 of the Public Resources Code read as follows:
“All state agencies, boards, and commissions shall include in any report on any project they propose to carry out which could have a significant effect on the environment of this state, a detailed statement by the responsible state official setting forth the following:
“(a) The environmental impact of the proposed action.
“(b) Any adverse environmental effects which cannot be avoided if the proposal is implemented.
“(c) Mitigation measures proposed to minimize the impact.
“(d) Alternatives to the proposed action.
“(e) The relationship between local short-term uses of man’s environment and the maintenance and enhancement of long-term productivity.
“(f) Any irreversible environmental changes which would be involved in the proposéd action should it be implemented.” (Pub. Resources Code, §21100.)
“No state agency, board, or commission shall request funds, nor shall any state agency, board, or commission which authorizes expenditures of funds, other than funds appropriated in the Budget Act, authorize funds for expenditure for any project, other than a project involving only planning, which could have a significant effect on the environment unless such request or authorization is accompanied by a detailed statement setting forth the matters specified in Section 21100.” (Pub. Resources Code, § 21102.)8
[512] The language of these two sections is unambiguous and mandatory. What they literally provide is that an EIR is required before any state agency proceeds “to carry out” any environmentally significant project in respect of which either a request for or an authorization of funds9 is required after the effective date of CEQA. The only exemption provided is for “funds appropriated in the Budget Act,”10 and no distinction between ongoing and new projects is suggested; to complete an ongoing project is to “carry out” such project. The decision to do so is to be governed by the results of the EIR process.
Section 21102 is thus at the same time a deadline for the completion of Environmental Impact Reports on projects initiated after the effective date of the act and a conclusive standard for determining when projects initiated prior thereto cannot be exempted from the EIR requirement. As written, it effectively and logically accomplishes both objectives. As applied to projects initiated after the effective date of the act, it determines the stage beyond which a project may not proceed without preparation of an EIR, to wit, the initial request for or authorization of funds. Once the EIR requirement is complied with, subsequent requests or authorizations may be “accompanied” by the original EIR unless, as indicated by section 21166, substantial changes in the project or in the circumstances under which it is being undertaken require “major revisions of the environmental impact report.”11 If such major revisions are required, section 21102 clearly requires the revised environmental impact report to accompany any future requests or authorizations for funds.
As applied to projects initiated before the effective date of CEQA, section 21102 provides a categorical and logical minimum requirement to establish nonapplicability based on “ongoing project” [513] status. If the funds necessary for the completion of a project have not been authorized, it is patent that the agency responsible for authorizing additional funds still has the power to determine whether “to carry out” the project to completion. Were this not true, it would have no discretion to withhold authorization of the funds.
The interpretation which respondent has consistently placed upon section 21102 and now urges dispenses with the requirement for an EIR if the initial authorization of funds for the project occurred prior to the effective date of CEQA. This position was asserted by respondent and rejected by the court in Keith v. Volpe (C.D.Cal. 1972) 352 F.Supp. 1324, 1337, footnote 16, and it is unsupportable. The requirement of section 21166 for major revisions of EIRs assumes that multiple decisions may be made on the basis thereof. Respondent’s interpretation would render section 21166 virtually meaningless by confining its effect to situations in which the changes requiring the revisions occur between the time of initial preparation of the EIR and the initial funding. In addition, the provisions of section 21102 apply with like effect to both requests for funds and to authorizations for expenditure of funds. If the reference to authorizations encompasses only initial authorizations, then only initial requests are governed thereby. The existence of previous requests (perhaps refused) would bear no rational relationship to the objects of CEQA and could not have been intended to result in nonapplicability.
Such a categorical minimum requirement is highly important. Without it the courts are left in the untenable position of being obliged to undertake determinations of the merits of environmental impact decisions in order to decide whether the responsible agency has proceeded in a manner required by law. As our Supreme Court pointed out in No Oil, Inc. v. City of Los Angeles, 13 Cal.3d 68 [118 Cal.Rptr. 34, 529 P.2d 66], these are separate questions. The court said (at pp. 74-75): “Since, as we shall explain, the judgment of the superior court sustaining the city’s decision must be reversed because of the city’s failure to proceed in the manner required by law, we do not reach the question whether that decision is supported by substantial evidence.”
Where no such categorical standard as that set forth in section 21102 was available, the courts have struggled, with little success, to evolve a workable standard. The NEPA lacks any express standard for permitting nonapplicability on the basis of ongoing project status. Arlington Coalition on Transportation v. Volpe (4th Cir. 1972) 458 F.2d 1323, cert, den., sub nom Fugate v. Arlington Coalition (1972) 409 U.S. 1000 [34 [514] L.Ed.2d 261, 93 S.Ct. 312], is a leading case attempting to state a workable standard. After characterizing the “design approval” test as “arbitrary and capricious,” the court said (458 F.2d at pp. 1331, 1332): “Doubtless Congress did not intend that all projects ongoing at the effective date of the Act be subject to the requirements of Section 102. At some stage of progress, the costs of altering or abandoning the project could so definitely outweigh whatever benefits that might accrue therefrom that it might no longer be ‘possible’ to change the project in accordance with Section 102. At some stage, federal action may be so ‘complete’ that applying the Act could be considered a ‘retroactive’ application not intended by the Congress. The congressional command that the Act be complied with ‘to the fullest extent possible’ means, we believe, that an ongoing project was intended to be subject to Section 102 until it has reached that stage of completion, and that doubt about whether the critical stage has been reached must be resolved in favor of applicability.
<6
“We cannot, of course, define for all cases the point of completion beyond which Section 102(C) is no longer applicable. We are certain, however, that Arlington 1-66 has not yet reached that point: P. S. & E. approval