Opinion

Opinion by

Mr. Chief Justice Kephart,

Appellee brought this action of trespass for damages caused by slides of earth which covered its tracks and *452 yards in tlxe vicinity of 26th Street and Bigelow Boulevard, in the City of Pittsburgh. Grant, now Bigelow Boulevard, was constructed in 1898 on the face of a steep hill at the base of which appellee’s tracks were located, approximately 250 feet perpendicularly below, and 450 feet surface-measurement from, the boulevard. A large ravine, known as Jones Hollow, occupied the intervening space, and the boulevard passed over it. This was done partly by cutting into the side of the hill and partly by a fill. In the original filling operations in 1898 and 1899, earth and stone slipped downward from the boulevard, spreading over properties in the Hollow. Further filling was enjoined until the land in the Hollow was purchased by the City, and a large retaining wall of masonry, 60 feet high, 15 to 22% feet thick, and 140 feet long, was erected south of appellee’s property to withhold any movement of the fill. Between it and the boulevard a timber.crib was built across the Hollow, and French drains were constructed by appellant near the base of the hill to take off percolating and subterranean water.

From 1900 to 1920, 75,000 cubic yards of additional fill were gradually deposited in the Hollow. Pilings were placed on Jones Avenue in 1905, but another slip occurred in that vicinity the following year. In 1919 an ordinance of the City Council authorized the widening and improvement of Bigelow Boulevard in this location. Two contracts were awarded and the work started in 1920. In the course of it, 20,000 additional cubic yards of earth were deposited on the fill in the Hollow west of Jones Avenue and the Boulevard, and 13,300 cubic yards east of that intersection., A terracotta sewer pipe located under Jones Avenue, broke, saturating the filled ground. On September 22, 1920, large cracks appeared on the surface of Jones Avenue and a portion of that street subsided. Appellant’s engineers Avere notified, and emergency operations to divert the sewage were begun. On September 28th, the entire *453 fill in Jones Hollow was discovered to be in' motion, and cracks appeared in" tbe masonry retaining wall. Notwithstanding tbe notice given appellant of tbe movement-of tbe fill, the contractors continued dumping in tbe Hollow, pursuant to their contracts. Large quantities of.earth slid over and around tbe retaining wall, wbicb bad been forced outward, onto tbe tracks and yards of appellee. Appellee’s “Car Wash Building,” was in the direct path of the slide and was demolished. Tbe slide continued, until tbe earth at its head bad reached a height of approximately 55 feet on appellee’s property, covering two main passenger tracks, and several tracks in tbe yards' - Traffic was diverted by appellee and emergency crews were rushed to the' scene. Steam Shovels, cranes, ditching machines, a derrick, and hundreds of trains were used to remove this great accumulation of 178,860 cubic yards of earth. Tbe main tracks were opened December 5th. Tbe slide temporarily stopped, but resumed motion on June 27, 1921, and again tbe property of appellee was covered by approximately 35,000 cubic yards of earth, tbe removal of wbicb occupied appellee’s emergency forces until August.

On June 20, 1923; appellee issued its summons in trespáss, and subsequently tbe ease was listed to be tried in 1924. When it was called, appellant requested a continuance, to wbicb appellee agreed. It was again listed in November, 1924. Tbe parties discussed: settlement in 1925, but reached no agreement. In November of that year, tbe case was again called, and again placed on tbe deferred list at appellant’s request, with tbe stipulation that it be put down for trial “later at some convenient time.” On October 14, 1926, appellant filed its affidavit of defense with a counterclaim. Appellee promptly filed á demurrer to tbe counterclaim wbicb was sustained. Nothing further was done until April 12, 1935, when tbe case was placed upon the trial list by-appellee. During this interval there had been *454 some negotiations between the parties regarding this case and other matters of litigation, but no attempts at settlement were made.

The case was called for trial early in 1936, but was deferred for special listing. On May 4, 1936, the case was discussed with William B. Secrist, newly appointed city solicitor, who asked time to familiarize himself with the facts. On June 22nd, he executed a stipulation for trial during the week of November 2, 1936. City Solicitor Secrist died in August. The new city solicitor, Gregory Zatkovich, appointed September 4, 1936, entered into a stipulation for an extension to January 18, 1937. On November 6, 1936, his successor filed a petition and rule for judgment of non pros. This was dismissed by the court en banc on December 27, 1937. An appeal to the Supreme Court was quashed on January 12, 1938. In February appellant petitioned the court below for reargument, which was refused.

The case was brought to trial May 2, 1938, when the court dismissed a renewed motion for non pros. The jury returned a verdict for appellee in the sum of 1730,005.05, representing damages for the cost of removing the landslide from its tracks. Although additional damages in the form of detention money for the delay were asked by appellee, the jury specifically excluded this item from the verdict. Appellant moved for judgment n. o. v. and a new trial. From the refusal of these motions this appeal was taken.

The first question to be considered is the action of the court below in dismissing appellant’s motion for a non pros. It is urged that the delay of more than eight years from the action on the counterclaim to the listing of the case for trial on April 12, 1935, and the subsequent delay of approximately three years before the case was heard, constitute laches on the part of appellee. The court en banc fully considered this aspect of the case and, under our decisions, the conclusion reached cannot be disturbed on this appeal. *455 The grant or refusal of a non pros, for delay in prosecution is entirely within the discretion of the court to Avhich application is made. See Wingert et al. v. Anderson et al., 309 Pa. 402, 403; Potter Title & Trust Co. v. Frank et al., 298 Pa. 137, 139; Hillside Coal & Iron Co. v. Heermans, 191 Pa. 116, 121; Waring Brothers & Co. v. Pennsylvania R. R. Co., 176 Pa. 172, 176. The rule is stated in Insurance Company v. Clinger, 10 Pa. Superior Ct. 92, at page 102: “There is no fixed rule as to the length of delay that will prevent plaintiffs proceeding. It is a question of discretion controlled by the facts of the particular case and the decision of the court below will not be reversed unless there is a manifest abuse of discretion.”

Furthermore, the right to a non pros, may be waived if there is conduct indicating a willingness on defendant’s part to try the case on the merits notwithstanding the delay, or if he is a party to, or causes, the delay. In Potter Title & Trust Co. v. Frank et al., 298 Pa.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Wells Fargo v. Puharic, B.
Superior Court of Pennsylvania, 2018
London v. Adams
1998 SD 41 (South Dakota Supreme Court, 1998)
Herb v. Snyder
686 A.2d 412 (Superior Court of Pennsylvania, 1996)
Reynolds v. Thomas Jefferson University Hospital
676 A.2d 1205 (Superior Court of Pennsylvania, 1996)
Gonzalez v. Katz
27 Pa. D. & C.4th 243 (Montgomery County Court of Common Pleas, 1994)
Snyder v. Snyder
629 A.2d 977 (Superior Court of Pennsylvania, 1993)
Deitrich v. Deitrich
556 A.2d 398 (Superior Court of Pennsylvania, 1989)
Dusack v. Conrail Corp.
36 Pa. D. & C.3d 622 (Somerset County Court of Common Pleas, 1982)
Ridgeway Court, Inc. v. Landon Courts, Inc.
442 A.2d 246 (Superior Court of Pennsylvania, 1981)
Allegheny Ludlum Industries, Inc. v. CPM Engineers, Inc.
420 A.2d 500 (Superior Court of Pennsylvania, 1980)
Simon v. Simon
17 Pa. D. & C.3d 633 (Philadelphia County Court of Common Pleas, 1980)
American Bank & Trust Co. v. Ritter, Todd & Haayen
418 A.2d 408 (Superior Court of Pennsylvania, 1980)
Rizzo v. Rohrback
8 Pa. D. & C.3d 122 (Philadelphia County Court of Common Pleas, 1978)
Kennedy v. Bulletin Co.
346 A.2d 343 (Superior Court of Pennsylvania, 1975)
Bosniak v. Redevelopment Authority
341 A.2d 260 (Commonwealth Court of Pennsylvania, 1975)
Anderson v. Bernhard Realty Sales Co.
329 A.2d 852 (Superior Court of Pennsylvania, 1974)
State Ex Rel. State Highway Commission v. Graeler
495 S.W.2d 741 (Missouri Court of Appeals, 1973)
Hassett v. ST. MARY'S HOSPITAL ASS'N
478 P.2d 154 (Nevada Supreme Court, 1970)
Hodge v. Shea
168 S.E.2d 82 (Supreme Court of South Carolina, 1969)
Freer v. Parker
192 A.2d 348 (Supreme Court of Pennsylvania, 1963)

Cite This Page — Counsel Stack

Bluebook (online)
6 A.2d 907, 335 Pa. 449, 1939 Pa. LEXIS 453, Counsel Stack Legal Research, https://law.counselstack.com/opinion/pennsylvania-railroad-v-pittsburgh-pa-1939.