Pearson v. Twohy Bros.

231 P. 129, 113 Or. 230, 36 A.L.R. 1113, 1924 Ore. LEXIS 21
CourtOregon Supreme Court
DecidedOctober 7, 1924
StatusPublished
Cited by7 cases

This text of 231 P. 129 (Pearson v. Twohy Bros.) is published on Counsel Stack Legal Research, covering Oregon Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Pearson v. Twohy Bros., 231 P. 129, 113 Or. 230, 36 A.L.R. 1113, 1924 Ore. LEXIS 21 (Or. 1924).

Opinion

BURNETT, J.

For many years the defendant, Oregon-Washington Railroad & Navigation Company, has owned and operatéd a railroad running easterly out of the City of Portland in Sullivan’s Gulch. When the scheme of improvement here involved was inaugurated, several streets crossed the railroad tracks at grade. The City of Portland is a municipal corporation, the legal voters residing in which'have authority to make or amend its charter, where formerly such instrument was enacted by the legislative assembly of the state. In other words, within the scope of municipal government it is practically an autonomy.

At all times involved in this litigation, the council of the city had power and authority, subject to the limitations and restrictions of the charter:

“To exercise within the limits of the City of Portland all the powers commonly known as the police power to the same extent as the State of Oregon has or could exercise said power within said limits.” Portland Charter, § 73, subd. 1.

Operating under this power, the council by ordinance declared nine grade crossings of the railroad in *233 the eastern part of the city to be dangerous and directed the City Engineer to prepare plans, specifications and estimates of costs for their elimination. The general feature of the project was to lower the existing grade of the railroad company at the crossings an average of eleven feet and to raise the street level at those points correspondingly so that the trains of the company could go under viaducts to be erected there. In these intersections were various sewers, water-mains and gas-mains. The water-mains were owned by the city as part of its Bull Run water system, and the sewers were also city property. After the plans and specifications were prepared by the engineer and submitted to the council, they were amended in various particulars and an ordinance was regularly enacted adopting them as thus altered. The city retained the power of . building the viaducts, lowering the water-mains and sewers, and required the owners of the gas-mains to lower them to a certain subgrade.

The following provisions appear in the specifications adopted by the ordinance.

Article I, Section 3.

“Regrading the right of way, or such portions of the right of way as may be desired by said railroad company, outside the lines of streets where viaducts are proposed to be built under these specifications and the accompanying plans, shall be performed by the Oregon-Washington Railroad & Navigation Company and shall be directly paid for by said Company.

“It is specifically provided that the excavation of said company for regrading their right of way shall conform to the plans and profile attached hereto, in that the finished grade of the railroad tracks shall be so laid that foundations of sewers, new viaducts, water mains, gas mains or any other public utilities shall in no manner be endangered nor interfered *234 with, and shall be to the satisfaction and approval of the Engineer.”

Article I, Section 4.

“ (a) Contract.

“A contract will be let by the Council for the construction' of all subways, temporary viaducts, permanent viaducts and their approaches complete, ready for the traffic for which they are designed; and for the removal and relaying of all water services and mains and for the relaying and extension of sewers, ■sewer services and inlets affected by the regrading operations; all water main operations subject to supervision by the Bureau of Water Works of the Department of Public Utilities of Portland.

“(b) East Sixtieth Street Mains.

“It is especially conditioned that the thirty (30) inch water main laid in E. Sixtieth Street shall be removed and relaid in subways to be constructed for that purpose Prior, to the commencement of physically regrading the roadbed of the said railroad company. When the thirty (30) inch water main shall have been reinstalled in service, the operation of removing and relaying all other water mains may proceed simultaneously with regrading operations.”

Article XXXVIII contains provisions for readjustment of all water-mains which cross the tracks of the railroad company, and for relaying them under the tracks or removing them from such a situation, as the case may be, involving work upon and under the railway tracks.

Article I, Section 1.

“A contract will be let by the City of Portland, Oregon, covering the furnishing of all materials and the construction of all viaducts, both temporary and permanent, together with all approaches thereto, the excavation of the railroad prism under all permanent viaducts, the construction and reconstruction of all sewers.and their appurtenances affected by the opera-’, tions, and the removal and replacement of all water *235 mains affected by the operations, upon which a time limit is set and a per diem bonus is offered for the completion of the work prior to expiration of the said time limit and a per diem sum as liquidated damages contracted for, upon each day necessary to complete the entire contract after the expiration of the time limit set.”

Article XXIII, Section 3.

“Excavations for the installation of the subways shall be made to line and grade, which shall be of sufficient size in which to build forms and brace the trench, and shall be made in conformity with Section 1 of this Article. Price bid for this excavation shall include the blocking of alignment and gradienting of water mains and removal of blocking when subways shall have been completed.”

Article XXIII, Section 5.

“At the location of each of the permanent viaducts and within the lines given by the Engineer, the prism for the full number of railroad tracks for which the viaduct is designed, shall be excavated to the subgrade of the railway tracks, and shall be deposited in successive layers or courses in the approaches as is provided in Section 1 of Article XXIV of these specifications, for which a price shall be paid as foundation excavation, measured in excavation only.”

The city let a contract to the plaintiff for the performance of such work in the enterprise as the city reserved to itself. About the same time the railroad company let a contract to the defendant Twohy Brothers Company for excavating the part required to be excavated by the railroad company. The plaintiff claims that the defendant railway company and Twohy Brothers interfered with his work, hindered and delayed him, doing great damage to him, particularly that they excavated the prisms that he was required to excavate, and instead of placing the earth *236 therefrom upon the approaches in the particular street from which the excavation was made, they carried it away and disposed of it in a fill in Mock’s Bottom, some miles from the improvement. The answers of the defendants avowed the taking of the earth from the prisms and claimed that the soil thus excavated was exclusive property of the railway company, and made other defenses to the remaining grievances of the plaintiff.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

K.R.A.M. Corp. v. City of Vernonia
770 P.2d 77 (Court of Appeals of Oregon, 1989)
Artman v. Ray
501 P.2d 63 (Oregon Supreme Court, 1972)
Morris v. City of Salem
174 P.2d 192 (Oregon Supreme Court, 1946)
City of Austin v. Deats
32 S.W.2d 685 (Court of Appeals of Texas, 1930)
Connersville Hydraulic Co. v. City of Connersville
173 N.E. 641 (Indiana Court of Appeals, 1930)
Kershaw v. City of Willamina
250 P. 235 (Oregon Supreme Court, 1926)

Cite This Page — Counsel Stack

Bluebook (online)
231 P. 129, 113 Or. 230, 36 A.L.R. 1113, 1924 Ore. LEXIS 21, Counsel Stack Legal Research, https://law.counselstack.com/opinion/pearson-v-twohy-bros-or-1924.