Per Curiam:
This is a petition, originally filed in the Tax Court, for redetermination of the excessive profits of a joint venture for its accounting year ended December 31, 1963. The Renegotiation Board determined by unilateral order that petitioner realized excessive profits in the amount of $1,200,000, before tax credits, and ordered elimination of that amount under 50 U.S.C. App. § 1215. The Tax Court [251] petition was transferred here under Pub.L No. 92-41, 85 Stat. 97, 98, and we have jurisdiction under the same statute, which amended 50 U.S.C. App. § 1218.
The case was tried before Trial Judge David Schwartz, who has submitted a recommended decision and conclusion of law under Rule 134(h). He would reduce the determination to $778,036 and both parties except. After briefing and oral argument, the court agrees with the said recommended decision and adopts the same as its own, with minor corrections, and with a few added comments which here follow. We adopt as our own the findings of fact (except for the conclusion of law at the end, which is replaced by ours), but they are not printed herewith, having been furnished to the parties. All the most significant facts are stated in the opinion.
The plaintiff was formed to submit proposals for the single contract here in issue. The joint venturers were Page Communications Engineers, River Construction Corporation, Curran and Company, and Fischbach & Moore, Inc. The contract called for installation in South Dakota of the buried intersite cable communication system in one of the six wings of the intercontinental ballistic missile network known as the Minuteman. The original price, as bid, was $5,476,132, but there were numerous changes, and plaintiff suffered from numerous delays that were attributable to defendant, including delays in delivery of government furnished material. The defendant obligated much over the contract price from the very outset. Rather than a series of equitable adjustments, the parties decided to negotiate a single new fixed price. This was done in late April and early May 1963, and the new fixed contract price was $13,000,000, of which $1,152,000 was the estimated allowance for profit, equal to 8.8 percent of the agreed price. Throughout the negotiation, it was assumed and expected that the negotiated price would allow 10 percent profit on costs. By the date of this supplemental agreement, much of the work had been done and major problems overcome. The trial judge believed that plaintiff at the date of the negotiation could have estimated its costs for the entire job with approximate accuracy. The parties still debate what [252] uncertainties remained. Clearly there were some, but we do not consider it helpful to measure them exactly.
The plaintiffs entire revenues from the job were $13,200,494 and its costs, $10,484,147, leaving a net profit of $2,716,347. These figures are reviewed in this proceeding in their entirety, and revenues under no other contract are involved, because this renegotiation was conducted on a completed contract basis of accounting.
The trial judge, after an exhaustive analysis, constructed a reasonable profit figure by allowing 10 percent, not on actual costs, but on the estimated costs in the negotiation, thus, $1,152,000, the profit contemplated in the 1963 negotiations. Then he added 5 percent of actual costs, for efficiency, and 2% percent for contribution to the defense effort, making a total non-excessive profit of $1,938,311.
Defendant criticizes this as too generous and would restrict the plaintiff to the 10 percent of costs it said it expected.
We note at the outset of our review that the trial judge characterizes the cost estimates plaintiff used in the 1963 negotiation as "inflated.” This is true in the sense that hindsight shows they were excessive by a large figure. It does not mean they were willfully false or that plaintiff had corrective data that it withheld. Defendant disavows such a contention, and necessarily. The Truth in Negotiations Act, Pub.L. No. 87-653, 76 Stat. 528, 10 U.S.C. § 2306(f), as amended, was applicable to this negotiation. Defendant considered but rejected invoking it, but now would accomplish the result it would have achieved if it had invoked that Act, and established that the entire excess of the estimated over the actual cost was contrary to data in plaintiffs possession. The Renegotiation Act is intended for a different purpose. If plaintiff had achieved a large saving in actual as against estimated costs, in a fixed price negotiated contract, negotiated in good faith before performance began, no one would have doubted that in renegotiation it would have been at least entitled to share in the benefit the saving achieved. We are not convinced that the circumstances dictate a different result here. If defendant had wanted to restrict plaintiff to 10 percent on audited costs, it could have proposed a contract to that end. [253] If the original contract overruns had been left to be settled by change order and equitable adjustment, the same result would have occurred, substantially. In insisting on rolling the whole thing into a fixed price contract, without cost escalation, defendant cannot but have supposed it was protecting itself against possible costs in excess of the estimates. We think that by achieving actual costs below good faith estimates, plaintiff is entitled to credit in renegotiation under the "efficiency” and "reasonableness of cost” factors, even though the estimates in question came late and applied partly to costs actually realized already, though not accurately known.
We conclude, then, using as a "starting point” the expected profit of $1,152,000 — which certainly should stand even though the cost on which it was based was lowered — it would be reasonable to share equally between plaintiff and defendant the benefit inuring from the reduction in costs below the estimates. The trial judge’s determination approximately does this, and therefore it need not depend wholly on his 5 percent and 2% percent allowances, which without corroboration might seem arbitrary to some minds.
We note that the Renegotiation Board’s allowed costs were $10,717,000 and its profit before renegotiation $2,431,000 instead of the trial judge’s determination of $10,484,147 and $2,716,347, respectively. The principal but not the sole reason for these differences is that the Board "as a matter of judgment” allowed $300,000 for overhead expenses in the home offices of the several joint venturers., Apparently it was what is often called in this court a "jury verdict.” It stands to reason that the delays and difficulties, for which defendant was chargeable, must have increased these costs, and the Board made its allowance despite a lack of detailed substantiation. The trial judge disallowed $208,885, allowing only $103,052. See his footnote 1 and findings 132, 133. Finding 132 (i) reads: "The principle of a home office charge is found to be reasonable and fair.” He disallowed as he did for lack of substantiation. However, when it stands to reason a cost has been incurred, but it cannot be substantiated on audit, the proper technique in renegotiation is to consider it under the statutory factor: "Reasonableness of Costs and Profits.” We consider that [254] this item tends to support the trial judge’s determination of a reasonable level of profit while reducing to some extent the dependence on his allowances for efficiency and contribution, of 5 percent and 2% percent. Other revenue inclusion and cost allowance disputes we deem to be inconsequential in face of the broad-brush nature of renegotiation.
Plaintiff urged the trial judge to add to sales and costs the value of government-furnished material (GFM), mostly cable and splice cases. This would have halved or more the profit rate, i.e., the percentage of profit to costs or sales. He refused to do so, a refusal which we support. We note that in several recent cases we have done this. In Camel Manufacturing Co. v. United States, 215 Ct. Cl. 460, 572 F. 2d 280 (1978), we rejected as not binding on us a Board ruling to the contrary. In agreement are Major Coat Co. v. United States, 211 Ct. Cl. 1, 543 F.2d 97 (1976) and Blue Bell, Inc. v. United States, 213 Ct. Cl. 442, 556 F.2d 1118 (1977). However, the circumstances in those cases were different and they are not necessarily binding as precedents here. The change of course does not add to or subtract anything from profits. It diminishes percentage ratios of profits to sales and costs, and therefore may have an influence on minds that rely toó much on such percentages. More legitimately, in many cases it facilitates comparisons to other business of the contractor, or to other companies. A contractor is entitled to profit on GFM, as well as on material he supplies, but not at the same rate. As to GFM, his contribution may, as the trial judge says, be considered one of management, but management also is entitled to some reward.
We think the existence of a large amount of GFM under the contract, excluded from sales and costs, is a matter to be considered under the statutory factor: "Character of business.” Such consideration tends to support the trial judge’s determination of a reasonable level of profit, while reducing to some extent the dependence that has to be placed on his allowances for efficiency and contribution of 5 percent and 2% percent.
It is not, of course, required that favorable consideration under the factors must be cumulated as separate percent[255] age allowances. See Camel Manufacturing Co., supra, 215 Ct. Cl. at 514, 572 F. 2d at 310,
Defendant says that none of the venturers, considered separately, were accustomed to a profit of as much as 10 percent on costs. Assuming this to be true, the record does not disclose the nature of that other business sufficiently for us to weigh the significance of the fact. Each side in oral argument blamed the other for the paucity of the record in that regard. Defendant cannot benefit from this empty comparison; plaintiff does not ask to.
Except for the foregoing, the trial judge sufficiently speaks the opinion of the court.
Chart A, printed herewith, shows in summary form the differences between the Board decision and the trial judge’s decision which we adopt.
CHART A
Page-River-Curran, a Joint Venture Renegotiation, Year ended 12 - 31 - 63
Renegotiation Board Trial Judge
Reneg. Sales (Revenue) $13,148,000 $13,200,494
Renegotiation Profit Percent 2,431,000 18.5% 2,716,347 20.6%
Profit to be Eliminated 1,200,000 778,036
Adj. Sales (Revenue) 11,948,000 12,422,458
Adj. Profit Percent 1,231,000 10.4% 1,938,311 15.6%
Conclusion
Upon the above per curiam opinion of the court, and the trial judge’s opinion and his findings, which have been furnished to the parties, and are adopted by the court, but not printed, the court concludes as a matter of law that plaintiff realized excessive profits in the gross amount of $778,036. The case is remanded to the Trial Division under Rule 131(c) for proceedings to determine what payment, if any, plaintiff has already made, the appropriate credits and adjustments for state and federal taxes, according to law, the allocation of the excessive profits among the [256] venturers for the purpose of determining such credits and adjustments, the interest due according to law, the net amount to be awarded defendant or plaintiff in view of the foregoing, and to recommend the amount of the judgment to be entered for plaintiff or defendant.
Schwartz, Trial Judge:
This is a de novo proceeding under Section 108 of the Renegotiation Act of 1951 brought by plaintiff to determine whether its profits on a single contract with the Air Force were excessive within the meaning of the Act and if so by what amount. 65 Stat. 7, 21 (1951) as amended, 50 U.S.C.App. § 1218 (Supp. V, 1975). The plaintiff, a joint venture, had no other business than the one contract.
The contract called for the installation of the buried intersite cable communication system in one of the six wings of the intercontinental ballistic missile network known as the Minuteman. Gross contract revenue, in this case gross renegotiable income, was $13,200,494, on which plaintiff made a net profit subject to renegotiation of $2,716,347. This profit is 20.6 percent of the contract revenue or sales of $13,200,494 and 25.9 percent of contract costs of $10,484,147.
The conclusion reached here is that the profits were excessive to the extent of $778,036. The recoupment of this sum leaves plaintiff with a profit of $1,938,311, a profit rate of 15.6 percent of gross receipts of $12,422,458 as reduced by the refund of excessive profits and 18.5 percent of costs of $10,484,147.
Minuteman, at the time the country’s most advanced strategic weapon, is composed of missiles placed underground in a gridiron in separate "silos” called launch facilities, interconnected with facilities for launch control. Six wings comprise Minuteman, now called Minuteman 1— four of 150 missiles each and two of 200 missiles each. Plaintiffs wing 2 was a 150-missile wing and consisted of 15 clusters or flights of 10 missiles each, each flight controlled by a launch-control facility. Plaintiff laid slightly over 1500 miles of cable, 30 inches below the ground, in a [257] gridiron covering 10,000 square miles centered on Ell-sworth Air Force Base in Rapid City, South Dakota.
The contract called for delivery of each of the first of the 15 flights on specified dates from November 30, 1962 to July 1, 1963. Time was of the essence. Minuteman, a measure of cold war, was deemed of first priority in the defense of continental United States. Time was of the essence more specifically because performance of cable-laying had to interlock with performance of other contracts, including that of the producer of the missiles. The contract provided for liquidated damages of $1,000 per day per flight for late delivery.
The Government supplied the contractor with the necessary cable and splice cases — the latter are the housings in which the lengths of cable are joined — real estate rights and permits, together with other major materials used, such as pressure component assemblies, load-coils, demi-valves, contactors and conduits. The contractor would survey, prepare the right-of-way, furnish heavy equipment and excavate, lay cable, train splicing personnel and splice the cable, pressurize it by a system of its design, backfill, clean up, test the system and deliver in operational condition the 15 flights of Wing 2 by a series of specified dates.
Plaintiff joint venture is composed of Page Communications Engineers, River Construction Corporation, Curran and Co. and Fischbach & Moore, Inc.; plaintiffs name, PRC, is an acronym for the first named three, the original partners. Page, a subsidiary of Northrop Corporation, provided overall management and technical matters such as pressurization of the system, testing, training and quality control. River, a subsidiary of Morrison-Knudsen Co. Inc., and Curran and Co., both experienced in pipeline construction, undertook the preparation of the right-of-way and the digging and laying of the cable; Fischbach & Moore did the electrical work and cable-splicing.
Plaintiffs bid of $5,476,132 was the lowest of the nine responses to the Request for Proposals, and on analysis by a Source Selection Board of the elements of the proposals, plaintiff led the other bidders. Accordingly, the contract was awarded to plaintiff on December 28,1961, and a letter [258] contract was issued by the Ballistics Systems Division of the Air Force on January 29, 1962.
Surveying work began as scheduled, on January 2, 1962, but delays set in almost immediately by reason of deliveries of insufficient amounts of both cable and splice cases and of defects in what was delivered. The plan was that cable and cases — 1500 miles of cable and 2800 cases— would be produced and delivered on calls by the contractor in specified amounts to a total of material needed for 300 miles of progress per month. The plan broke down at the outset.
The urgency of the whole project was such that the required cable and splice cases were not yet in production — the splice cases were still on the drawing boards— when the contract was awarded to plaintiff and it was scheduled to begin work. Thus while the first cable call was given in January, when plaintiff started trenching, there was no cable for it to lay. Of the first 150 miles of cable called for so as to be due in April 1962, when laying was scheduled to begin, only 10 miles were delivered. An amount sufficient for laying did not arrive until June. When sufficient cable and splice cases did arrive, there were numerous defects requiring "field fixes” or return for repair or replacement.
Some 80 different types of cable were needed for different terrains and function and the various types were called for delivery in the sequence appropriate for use. When deliveries did come, they were out-of-sequence. The results were trenches left open, "spotty” cable-laying, retraced steps and increased costs.
Cable was frequently late and in short supply. For instance, at one point in the course of performance, plaintiff intensified its trenching work on the promise of large production of cable. The promises were not kept, because of an unexpected manufacturing problem, and plaintiff was left with 735 miles of open trench in October 1962, at the beginning of the winter. Open trench meant cost of patrolling and repair as the sides of the trench sloughed in, and the cost of returning to continue the work increased over what would have been the cost had the cable been available at the time the trench was dug.
[259] Production difficulties at the plants of the cable and splice case manufacturers were the prime or exclusive cause of the delays. The products were new — such a system had not been installed before — and there was apparently a goodly number of bugs, both in specifications and production.
The original plan had been that cable-laying, splicing and back-filling would be completed before the winter of 1962-63 set in, with testing and final hook-up to the launch control facilities to take place in the spring and early summer of 1963. No winter work was planned. Under the contract, no work could be done on cable in zero conditions, and winter work would in any event be inefficient. The cumulative effect of the delays caused by late delivery and defects in GFM, however, forced work to go on through the harsh South Dakota winter of 1962-63. Trenches had to be dug in frozen ground. Substantial extra costs were incurred, from the effects of snow and cold.
The Government readily accepted responsibility for the increased costs from the lateness of deliveries of GFM and from its defects, and directed the expansion of work required to meet the needs for completion on schedule or on a revised schedule. Change orders, supplemental agreements and provisional billings and payments at agreed rates per unit of work, to the limit of administratively committed sums beyond the stated contract price, made the original contract a formality.
The original letter contract for $5.5 million was "definitized” in a fixed-price contract at the same price of the original contract. This "definitized” contract was scheduled for March 30, 1962 but the storm of delays and changes was such that it was signed only on September 13, 1962 and made retroactive to April 23, 1962. The "fixed price” stated therein, $5,476,132, was as much a formality as the original price. Funds obligated to the performance of the contract had been increased to $7,050,630, by a fifth amendment to the contract on August 21, 1962, in the month before the signature of the "definitized” contract. And in the month following the "definitized” contract, funds were increased to $8,950,131, by Supplemental Agreement No. 2 of November 30, 1962.
[260] Unable to distinguish the source of costs as the original contract work, the change orders or expanded operations undertaken at Government behest to meet slippage in program, the Air Force decided to reprice the entire contract. Early in 1963, therefore, plaintiff on request submitted a total-price proposal, soon updated to $16,524,000, of which $9.2 million was an estimate of costs to completion.
Negotiations for the repricing took place in late April 1963 when funds committed to the contract and the provisional billing total for progress payments already amounted to over $10 million. After 5 days of negotiations, on May 2, the parties agreed on the round sum of $13,000,000. Their agreement was embodied in a Supplemental Agreement No. 8 effective May 2, 1963, of which more later. The agreed price of $13 million was thereafter increased by minor change orders to $13,148,613, which became the final contract price. Additional contract-related income of $51,881 brought total renegotiable income to $13,200,494, the sum first mentioned above.
Supplemental Agreement No. 8 again, as had an earlier agreement, recited the Government’s recognition that it was responsible for its failure to furnish GFM in time and in a condition suitable for intended use, for the resulting delays and the expansion of plaintiffs work to minimize the delays, and for the consequent increases in cost and in the time needed for performance of the contract. The original delivery dates of the 15 flights were changed from November 30,1962 — July 1, 1963 to May 15,1963 — October 1, 1963.
Lest the size of the increase in contract price from first award to final pricing be thought unusual, it is added that comparable increases characterized, also, the contracts for the cable systems in the other five wings of the Minuteman project. The award and final contract prices for the six wings were as follows:
[261] Final Wing Award price Contract Price Increase %
1 $8,642,000 $12,740,000 4,098,000 47
2 5,746,132 13,147,863 7,401,731 128.81
3 4,740,598 7,000,000 2,259,402 48
4 6,225,000 14,196,194 7,971,194 128
5 6,434,234 7,366,647 932,413 14
6 2,992,736 6,328,293 3,335,557 111.46
With the foregoing preliminary review of the contract, the several statutory factors stated in section 103(e) of the Renegotiation Act, 50 U.S.C.App. § 1213(e), as bearing on excessiveness will be considered.
The Character of the Business. "Character of business, including source and nature of materials, complexity of manufacturing technique, character and extent of subcontracting, and rate of turnover.” Renegotiation Act § 103(e)(5), supra; Regulations, 32 C.F.R. § 1460.14 (1973).
The "manufacturing technique” employed in performance was not a single one for the entire job. About 70 percent of the job, consisting of relatively non-complex cable-laying, that is, surveying, trenching, laying, backfilling, compacting and right-of-way work, was construction work done by experienced pipelayers. Cable was laid in large part under winter conditions, at scattered locations, under conditions frequently disorganized by the late deliveries of cable and splice cases and the defects in the goods delivered. The other large part of the work— about 30 percent — was cable splicing, pressurization and testing, all relatively complex work performed by skilled electricians. The splicing responsibility entailed the establishment by plaintiff of a school for the training of its own splicers as well as the Government’s quality examiners. The basic design of the system was done by the Air Force. A limited amount of engineering design was required of plaintiff for the pressure system, which included an automatic alarm feature supplied by the contractor.
[262] Efficiency. "In determining excessive profits favorable recognition must be given to the efficiency of the contractor or subcontractor, with particular regard to the attainment of quantity and quality production, reduction of costs, and economy in the use of materials, facilities, and manpower.” Section 103(e) Renegotiation Act; see also Regulations § 1460.9(a). There is no doubt that plaintiff did an excellent job, exercising superior skill and exhibiting high technical proficiency, under conditions of very substantial difficulty. The several elements of efficiency will be separately discussed.
Quality, Quantity and Volume. In this case quality, quantity, scheduled timeliness and volume, ordinarily separate elements of efficiency, all merge into the delivery by plaintiff on time of a working system. Completed flights were delivered beginning May 16, 1963 and ending September 6, 1963. The first flight was delivered only 1 day late and the successive flights were each delivered on time or from 2 to 27 days earlier than schedule. The final flight was delivered 25 days earlier than the required delivery date of October 1, 1963.
The system was operational; it did what it was supposed to do and no more could be asked. Since time was particularly of the essence of the contract, delivery on and before schedule was especially commendable.
Labor. Labor was in short supply; similar jobs were going on in the same or nearby areas. Plaintiff very effectively recruited and trained its labor. There were no labor stoppages. When work was interrupted by deliveries of GFM either late or in unsuitable condition, plaintiff sensibly kept its men on rather than letting them go, rehiring and retraining them.
Economy and reduction of costs. Profits were high and might ordinarily indicate economy and a reduction in costs by an efficient fixed-price contractor. A major dispute in the case, discussed below, is over whether the surplus of estimated over actual costs is to be attributed to plaintiffs economical use of facilities and manpower with resulting reduction of costs or to an overestimation of costs, overpricing and an overbearing treatment by plaintiff of [263] the Government in the price negotiations in which the contract was repriced from $5.5 to $13 million.
A saving was realized by the termination of a subcontract for seeding and mulching the right-of-way, and the performance of the work by the plaintiffs own forces. The subcontract would have cost $160,000; plaintiffs costs were $100,000 — a saving of $60,000.
Plaintiff was economical in the use of the Government’s materials. It made field fixes of damaged materials, suggested economical repairs and utilized scrap cable where possible. Thrifty suggestions included a method of sealing cable ends while the cable was on reels, thereby enabling testing of pressure integrity in advance of laying; and a method of attaching the cable to reels which prevented damage to cable during shipping. When a grommet used in a particular size of splicing case did not provide a tight fit against gas pressure, the project manager, Mr. Bailey, suggested the use of uncured isobutyl rubber for the purpose. He had had experience with such use of uncured rubber in his extensive earlier work in laying cable.
Work Under Difficult Conditions. The work was done, as already indicated, under extraordinarily difficult conditions. The project was a matter of urgent defense, the materials were delivered late and were often defective; production schedules were consequently disorganized and abandoned, and work had to be extended over the winter.
The difficulties caused by the late deliveries, however, can be exaggerated. Particularly misleading are comparisons between contract contemplated deliveries of cable and splice cases and the "average” actually delivered, and the number of months accumulated of delay, according to the schedule, in the late stages of performance. There were substantially no deliveries in the early months of the schedule. The schedule was found impossible to keep and the costs resulting from the delays were borne by the Government, from the first time they appeared. In essence, the contemplated schedule was agreed to be ineffective.
But great difficulties there were — difficulties which changed a big but straightforward cable-laying job into a complex task of management and coordination requiring [264] greatly increased expenditures, borne by the Government, and management talents of high order, which plaintiff was able to and did supply.
Management. The project was fortunate in the assignment of Mr. Loren A. Bailey as chief of the project. Mr. Bailey, a man of much experience in cable-laying, successfully coped with the unusual management difficulties. At the conclusion of the contract Mr. Bailey and his management staff were commended by the Air Force for their outstanding management of the project, described as a "job well done.”
Suggestions and Improvements. Mr. Bailey in consultation with the cable and splice case manufacturers and Air Force representatives and in some cases alone, was the source of numbers of suggestions for improvement and repair of elements of the system. His experience particularly enabled him to help with repairs and field "fixes” for damaged cable and methods for improving equipment in the light of actual operating conditions.
At one point Mr. Bailey suggested a change in the design of the largest type of splice case to be manufactured, of which 850 were to be manufactured at a cost of $1750. Plaintiff would have it that without Mr. Bailey’s suggestion the case would have been a total loss and that his suggestion made the case workable, and that the suggestion thus saved the Government 850 times $1750. This is too much for credibility. The testimony was somewhat self-serving; also, it may be doubted whether the suggestion makes the case workable or rather only improved it and whether a complete run of 850 of totally useless cases would have resulted from the failure to make the suggestion.
In another instance plaintiff suggested the repair of slashed cable by the application of tape over the cut. This is said to have saved the cost of the two splice cases had the damaged piece been cut out and a new length spliced in. But the suggestion seems rather obvious. Suggestions for even more complex repairs to avoid expensive and wasteful replacements are to be expected as a matter of course from a competent and experienced contractor.
[265] Again, when the load coils turned out to be too big to fit in the splice cases, as the specifications had provided, and they were put outside the case and attached to it by stub cable, plaintiff used surplus short ends of cable which would otherwise have been discarded. The use of such cable as against newly-manufactured cable of course saved the cost of new cable. Again, no less should have been expected of a competent contractor. Still another such episode is plaintiffs improvement by way of a "modification” of a tool used to apply the connector clamp which spliced the wires of two lengths of cable.
Plaintiffs claims to sole credit for many suggestions and for savings in the "millions” from its suggestions were pardonably exaggerated by its witnesses. The Air Force report to the Renegotiation Board answered "None” to a question as to "innovations of contractor that would have reduced costs.” Savings no doubt accrued to the Government from Mr. Bailey’s useful suggestions and helpful discussions with others involved in the project but there is little basis for the conclusory testimony that many millions were saved, or for the claims of fundamentally important changes, indispensable for the working of the system, emanating from plaintiff working alone.
The savings, though doubtless real, were, for one thing, on the record not quantified and quite likely not quantifiable. See Butkin Precision Mfg. Corp. v. United States, 211 Ct. Cl. 110, 130-31, 544 F.2d 499, 510-11 (1976). For another, plaintiffs design suggestions were usually in consultation with Air Force and GFM manufacturer representatives. The suggestions for economy and simplicity were of the kind to be expected from a competent contractor. Plaintiffs suggestions were, however, valuable and contribute to the high consideration to which plaintiff is entitled for its efficiency.
Contribution to the Defense Effort, the Public Interest and Fair and Equitable Dealing: "Nature and extent of contribution to the defense effort, including inventive and developmental contribution and cooperation with the Government and other contractors in supplying technical assistance;” * * * "Such other factors the consideration of which the public interest and fair and equitable dealing [266] may require * * *” Renegotiation Act, § 103(e)(4) and (6); Regulations, supra, §§ 1460.13, 1460.15.
Asked by the Renegotiation Board to appraise the plaintiffs contribution to the defense effort, "with particular emphasis on work done by him in development of new materiel, invention of new devices, management of large weapons systems contracts as prime or associate contractor, effective use of value engineering, and the like” the Air Force responded "NA-[not applicable] No R&D effort or Value Engineering. Basically a production type effort.”
Here, too, the plaintiffs claims aré exaggerated. The claim of unique achievement in providing an unprecedented state-of-the-art communications system is somewhat blunted by the fact that the contractors for the cable communication systems for the other wings also furnished a working system on time, and that none of them seems to have done less than a good job. All were operational; none developed unusual or unexpected maintenance problems. No credit is given to the fragmentary opinion evidence suggesting that plaintiffs wing was the best of all, or that some others were poorly installed.
Somewhat exaggerated, too, is the claim to credit for having exceeded contract requirements, by virtue of having provided a system with 8 pounds of pressure instead of the 7 pounds called for by the specifications. The specifications required 7 pounds of pressure, which should not drop more than 2 pounds. Compliance would have required setting contactors — pressure indicators — individually at a multitude of points. Trenches would have had to be reopened or left open for this purpose. To avoid this, plaintiff proposed providing an 8 pound system, with all contactors pre-set at 6 pounds. The suggestion was adopted. The change seems to have been a useful, economical step primarily profitable for plaintiff but also of value to the system furnished. Plaintiff was entirely cooperative with the Government and other related contractors. Mr. Loren Bailey personally worked with Air Force representatives, Anaconda, the cable supplier and Channell, the splice case supplier, to solve design, manufacturing and delivery problems. Plaintiff was, as already noted, the source of or a contributor to numerous suggestions in the course of the work designed to [267] overcome difficulties and solve the problems created by the defects which appeared in the Government-furnished material. While these are recognized under the factor of efficiency, their cumulative effect calls for recognition under the contribution factor as well.
Upon completion of the contract plaintiff turned over to the Government the data it had accumulated on defects in splice cases and other technical documentation, valuable for purposes of the maintenance of the system, and was commended for doing so. This, too, adds to the favorable consideration of the plaintiff under the contribution factor.
Finally, plaintiff is entitled to favorable consideration under the factor of contribution to the defense effort for having merged the resources of four partners in order to respond to the need for a large-scale cable-laying effort for military and essentially wartime purposes. Production for war demands the marshalling of resources and efforts beyond the ordinary civilian capacity, together commanding the variety of abilities needed. The grouping of four companies into one joint venture, to bid successfully on the project, was an affirmative contribution to national defense. A.C. Ball Co. v. United States, 209 Ct. Cl. 223, 254, 531 F.2d 993, 1010 (1976).
The factors of the "public interest” and "fair and equitable dealing,” found in section 103(e)(6), supra, in this case require no separate comment. The two factors are the heart of the Renegotiation Act. Excessive profits are to be returned, consistently with fair and equitable dealing for the contractor, all in the promotion of the defense effort and the public interest.
Net Worth. "The net worth, with particular regard to the amount and source of public and private capital employed.” Renegotiation Act, § 103(e)(2); Regulations, supra, § 1460.11.
Plaintiff invested less than $750,000 of capital and the Government financed the contract with contributions of GFM whose cost was over $16 million and with progress payments for units of work at defined dollar rates, from ample funds committed to the project.
By May 1963, the time of the repricing of the contract at $13 million, plaintiff had already deposited contract funds [268] of $7.1 million, had received approval of progress payments of $8.8 million and had a claim, for work done, for $11.1 million, all to be compared with its total costs at completion, 6 months later of $10.5 million.
Plaintiffs contract was essentially one for construction services and not one involving capital investment. Accordingly, neither party argues for any materiality to the rate of reasonable profit of any standard of return on net worth or invested capital. In the circumstances the use of invested capital and of a return on invested capital as a starting point for the judgment on the reasonableness of plaintiffs profits would be inappropriate and even misleading. Mason & Hanger-Silas Mason Co. v. United States, 207 Ct. Cl. 106, 137, 518 F.2d 1341, 1359 (1975); A.C. Ball Co. v. United States, supra, 209 Ct. Cl. at 255, 531 F.2d at 1010-11 ; Butkin Precision Mfg. Corp. v. United States, supra, 211 Ct. Cl. at 123-24, 544 F.2d at 507-08
Extent of Risk Assumed. "Extent of risk assumed, including the risk incident to reasonable pricing policies.” Renegotiation Act § 103(e)(3); Regulations, supra, § 1460.14.
The parties are in dispute over the degree of risk of loss borne by plaintiff for the $16.2 million worth of GFM. Plaintiff was not required to carry insurance and the contract clause on the subject of responsibility limited plaintiffs risk to losses by the wilful misconduct or lack of good faith of its managers. No added risk can therefore be found in any responsibility of the plaintiff for the GFM.
Plaintiff sacrificed no civilian markets, made no price reductions or refunds. Its liabilities on the contract warranty against installation defects and for off-right-of-way claims are not risks of the kind contemplated by § 103(e)(3) of the Act, but rather contractual burdens, incident to the promised performance, for which full pay is made in the form of contract price.
The several comments relating to risk and pricing in the Air Force report to the Renegotiation Board are these (with the questions asked indicated in parentheses):
(C) (unusual risks-close pricing, cost increases, shortages of material, guarantees) No unusual risk. Risk was very limited due to majority of material required being GFP Changed Conditions Clause [269] protected Contractor from latent subsurface conditions. Delays in GFP were basis for change in Contract price and schedule.
* * * * *
(G) Based on experience at subsequent wings it would appear that PAGE-RIVER-CURRAN was a high cost producer. However, due to nature of the work, time period, etc., it is difficult to make a factual determination as to whether or not contractor is a high, average, or low cost producer.
(H) Reasonableness of proposals is questionable and on the high side. However, this is considered normal for the industry. Contractor’s cost proposal of $16,524,000 was negotiated at $13,000,000, a 22% variance between requested and acceptable settlement.
(I) (comparison of prices with competitors’ prices for similar products) Wing III -1500 miles, same effort with similar delays in receipt of GF cable and splice cases. Total cost expected to be slightly under $7,000,000.00. Wing V - 2200 miles, no delays in GFP. Estimated cost thru completion $8,500,000.00.
The official Air Force opinion, albeit presented in a written report by an officer not subject to cross-examination, is thus that risk was "very limited”; that though a "factual determination” is "difficult,” on the experience with subsequent wings, plaintiff was a high cost producer.
On a comparison made between the cost per mile of plaintiffs and other contractor’s installations, it appears that the cost per mile of the cable installations in the six wings of the Minuteman was as follows:
[270] Wing Final Contract Price Mileage Cost Per Mile
rH $12,740,000 LO CO $7218
oq 13,147,863 00 tH t-H $8661
CO 7,000,000