Dibell, C.

This is an action in equity to determine and apportion the liability of the defendant insurance companies upon policies of tornado insurance issued by them to the plaintiff. The basis of equity jurisdiction in such cases is stated in Fegelson v. Niagara Fire Ins. Co. 94 Minn. 486, 103 N. W. 495. There were findings for the plaintiff determining that some of the defendants, were liable and that some were not and fixing the amount of liability of the companies found liable. Certain defendants appeal from the order denying their motion for a new trial. Other defendants are respondents.

There were 25 defendants and 40 policies. Two forms were used. The description of the property in form 1 was as follows:

“On all steel superstructures consisting of towers, bridges, trolleys and transfer cars, including all machinery, fixtures, equipment and attachments thereto and constituting a part thereof, all situate and contained on their premises at the foot of Hill Avenue at Superior, Wisconsin, and known as Northwestern Fuel Company’s Dock Number 1. Permission to make necessary alterations and repairs, and for other concurrent insurance.”

The description in form 2 was the same except as to alterations, etc., which was as follows:

“Permission to make necessary alterations and repairs and for additional construction. This policy to cover same, and for other insurance.”

The form 1 policies, numbering 15, were issued at various dates from August 11, 1911, to September 22, 1913, most of them, however, in the latter part of 1912. The form 2 policies were executed at various dates from June 10, 1913, to April 6, 1914, but largely in October, 1913.

The plaintiff’s dock covered some 40 acres and was located on the water front at Superior, Wisconsin. It was a single dock, but for purposes of convenience was referred to as of three sections. Sections 1 and 2 had been constructed a number of years. On section 1 there were four [22]*22bridges. On section 2 there were two towers but no bridges. The portion of the dock proper referred to as section 3 had been in course of improvement by way of filling in and cribbing for several years and in the early part of 1913 was ready for the superstructure. The superstructure is indifferently referred to as section 3 or bridge 5. The contract for the construction was executed in January, 1913. The sills were laid on May 17, 1913, and the false work was constructed on May 23, 1913. The superstructure was completed on July 29, 1913, so far as to be capable of practical operation; but it was operated by the building contractors under an arrangement with the plaintiff until about October 23, 1913, when its operation was taken over by the plaintiff. It was the most modern and extensive of the sections and exceeded both of the others in value. On May 25, 1914, it was damaged by a windstorm. The conceded damage was $125,000.

No question is made but that the form 2 policies covered bridge 5. Nearly all of them were subsequent in date to the completion of the construction and all of them covered additional construction. Four policies of form 1, one dated May 26, 1913, two dated July 11, 1913, and one dated September 22,1913, aggregating $12,500, were issued after the false work was up and while the bridge was in course of construction. The trial court held that these four policies aggregating $12,500 should contribute in paying the loss and that the other policies of form 1 aggregating $62,500 should not contribute.

The defendants issuing form 2 policies claim that all of the form 1 policies should contribute; and that if they do not there is a violation of the coinsurance clause of the policies. The companies issuing the four form 1 policies, held liable to contribute, claim that they should not contribute. If the form 1 policies all contribute there is no question of coinsurance involved; otherwise there is.

1. The court held that the four policies dated in May, July and September, 1913, should contribute. At the time they were issued the false work was up and the bridge was in process of active construction. The bridge was of structural steel work and the materials were at the time assembled on the dock. When completed it was some 721 feet long and some 131 feet high. The insurance was for a three-year period. In Frost’s Detroit L. & W. W. Works v. Millers & M. M. Ins. Co. [23]*2337 Minn. 300, 34 N. W. 35, 5 Am. St. 848, the court said:

“The building was in process of construction when the insurance was effected, and the contract of insurance should be deemed applicable, not only to the incomplete structure, but to the building when completed.”

It appeared there that the agent of the insurance company actually knew that the construction was in progress. It does not so appear here. It does appear, however, that certain soliciting agents placed practically all of the insurance, both that issued before and that issued after these four policies, and, inferentially at least, that they issued the builders’ insurance taken at the time of the commencement of the construction. That construction was in progress when the insurance was written was a matter of notoriety. Insurance companies survey property which they insure. They should not be heard to say, when a loss came a year after-wards, that the insurance had no reference to the superstructure in process of construction.

The court was right in holding that the other form 1 policies, three of which were issued in March and April, 1913, most of them in the latter part of 1912, and one as early as 1911, did not cover bridge 5. The superstructure was then in contemplation and for a portion of the time under contract, but there was nothing in the way of a structure in process of erection. The court adopted a reasonable construction when it held that these earlier policies did not cover the later erection.

2. There was an effort on the part of certain of the companies to prove conversations between the soliciting agents and the assured at the time of the issuance of the policies “in respect to the matters in connection with this risk, for the purpose of enabling the court to get a correct interpretation of the contract.” This was upon the theory that the insurance contracts were ambiguous and that a resort to parol evidence was proper within the general rule that where the contract' is ambiguous parol evidence as to conversations in explanation is admissible. See 1 Dunnell, Minn. Dig. §3397. The objection was sustained upon the ground that the contracts were not ambiguous. We think the court was correct in its ruling. The proffered proof amounted, at the most, to no more than evidence of conversations made at the time of the issuance of the policies to the eifect that they should cover subsequently erected structures. This was not competent. See Frost’s [24]*24Detroit L. & W. W. Works v. Millers & M. M. Ins. Co., supra. The policies involved no ambiguity subject to explanation by conversation* contemporaneous with their issuance.

3. All the policies contained a coinsurance clause as follows:

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Marshall Produce Co. v. St. Paul Fire & Marine Insurance
98 N.W.2d 280 (Supreme Court of Minnesota, 1959)
Cement, Sand & Gravel Co. v. Agricultural Insurance
30 N.W.2d 341 (Supreme Court of Minnesota, 1947)
Indiana Lumbermen's Mut. Ins. v. Fair
109 F.2d 607 (Fifth Circuit, 1940)
St. Paul Fire & Marine Ins. v. Lipsitz
295 S.W. 343 (Court of Appeals of Texas, 1927)
E. H. Emery & Co. v. American Insurance
177 Iowa 4 (Supreme Court of Iowa, 1916)
Anderson v. Upper Cuyuna Land Co.
157 N.W. 581 (Supreme Court of Minnesota, 1916)

Cite This Page — Counsel Stack

Bluebook (online)
154 N.W. 515, 131 Minn. 19, 1915 Minn. LEXIS 772, Counsel Stack Legal Research, https://law.counselstack.com/opinion/northwestern-fuel-co-v-boston-insurance-minn-1915.