This text of 56 F.3d 1430 (New Charleston Power I, L.P. v. Federal Energy Regulatory Commission) is published on Counsel Stack Legal Research, covering Court of Appeals for the D.C. Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
New Charleston Power I, L.P. v. Federal Energy Regulatory Commission, 56 F.3d 1430, 312 U.S. App. D.C. 360 (D.C. Cir. 1995).

Opinion

Opinion for the court filed by Circuit Judge RANDOLPH.

RANDOLPH, Circuit Judge:

Should rain-soaked cow manure be treated like a volcanic eruption in the Philippines or, instead, like a golf ball that knocks out a high-voltage transformer? Odd as it may seem, that is one of the contested points in this strange case.

The case arises under legislation described as “the solution that won’t die for the problem that did.” Jeff Bailey, ‘Purpa’ Power, Wall St. J., May 17, 1995, at Al. Whether that accurately portrays § 210(a) of the Public Utilities Regulatory Policies Act of 1978 (PURPA), Pub.L. No. 95-617, 92 Stat. 3117 (codified at 16 U.S.C. § 824a-3), is not our concern. The “problem,” as the 1978 Congress foresaw it, was the high price of oil climbing ever higher and the country growing ever more dependent on foreign oil suppliers. A “solution,” Congress thought, was to encourage alternative sources of electricity from “small power production facilities” in the hope of diminishing the demand for fossil fuels. FERC v. Mississippi, 456 U.S. 742, 750, 102 S.Ct. 2126, 2132, 72 L.Ed.2d 532 (1982). In PURPA terminology, “small pow[1432]*1432er production facilities” are those with a capacity of less than 80 megawatts, producing electricity by using, as their “primary energy source, ... biomass, waste, renewable resources, geothermal resources, or any combination thereof,” 16 U.S.C. § 796(17)(A)(i). Congress directed the Federal Energy Regulatory Commission to set down rules requiring electric utilities to purchase electricity from qualifying facilities — “QFs,” 16 U.S.C. § 824a-3(a). With the QFs receiving this and other favorable treatment, PURPA spawned a new industry. Small power plants using windmills, or methane from landfills, or solar energy sprang up around the country.

An unusual, indeed unique, method of producing electricity from other than fossil fuels is at the center of the present dispute. In 1988, at a cost of $49 million, the 15 megawatt-capacity Mesquite Lake Facility in El Centro, California, came on line as a QF, designed to burn cattle manure to generate electricity for sale to Southern California Edison Company. Despite a steady supply of fuel from the farms and feedlots in the surrounding Imperial Valley (when running, the Facility burned 40 tons of manure an hour), the Facility ran into immediate operational difficulties. Furnaces failed, boiler tubes corroded, refractory ceiling bricks collapsed, equipment fouled. Incomplete combustion caused the Facility to exceed the level of carbon monoxide emissions allowed under its air permit. During 1989 and 1990, the Facility shut down for months at a time while repairs were made. Another partial shutdown occurred in 1992.

In February 1993, New Charleston Power I, L.P., the petitioner here, purchased the Mesquite Lake Facility and began repairing and redesigning it. By April, the refurbished Facility was ready for a test run. Once again the machinery sputtered as the old problem of boiler fouling reoccurred and new problems in handling ash arose. Petitioner blamed some of this on record-setting winter rains in the Imperial Valley. The rains began soaking the cow manure in December. As the rains continued and the cattle milled about in wet pens, the manure became “contaminated” with mud. It was this wet, mud-laden manure, petitioner says, that fouled the boilers and other equipment and caused, or at least exacerbated, the damage.

Although the Mesquite Lake Facility could not safely bum cow manure until repairs were made, it could still produce electricity from natural gas. And so in October 1993, petitioner requested the Commission to waive, for calendar years 1993 and 1994, its regulation limiting QFs to using fossil fuel for no more than 25 percent of their total annual energy supply. 18 C.F.R. § 292.204(b)(l)-(2). Cow manure is “biomass” under § 201’s definition of “primary energy source.” 18 C.F.R. § 292.202(a). Only if a facility produces electricity from something other than fossil fuel may it retain its favored status as a QF. 16 U.S.C. § 796(17)(C). The § 201 definition of “primary energy source,” however, excludes— “under rules prescribed by the Commission” — “the minimum amounts of the fuel required to alleviate or prevent ... unanticipated equipment outages.” 1(5 U.S.C. § 796(17)(B)(i)-(ii)(I). The Commission’s rules promulgated in compliance with § 201 state:

(1)(i) The primary energy source of the facility must be biomass, waste, renewable resources, geothermal resources, or any combination thereof, and 75 percent or more of the total energy input must be from these sources ...
* * * H* * H*
(2) Use of oil, natural gas, and coal by a facility may not, in the aggregate, exceed 25 percent of the total energy input of the facility during any calendar year period.

18 C.F.R. § 292.204(b)(1) & (2).

The Commission will waive § 292.204(b)(2)’s 25 percent rule if doing so would be in the public interest. Its orders initially refusing, and refusing again on rehearing, to waive the rule for petitioner are before us in this petition for judicial review.

Petitioner has two main arguments for setting the orders aside. The first is that the Commission misconstrued 18 C.F.R. § 292.204(b)(2). (Petitioner denies that it is attacking the Commission’s regulation as in[1433]*1433consistent with PURPA.) The 25 percent rule, petitioner tells us, was never meant to limit a facility’s use of fossil fuel during — in the words of § 201(17)(B)(ii)(I) — “unanticipated equipment outages.” The Commission’s preamble to the regulation indicates the opposite. Congress, in § 201(17)(B)(ii)(I), ordered the Commission to determine in “rules” what amount of fossil fuel QFs would be permitted to use in alleviating outages. 16 U.S.C. § 796(17)(B)(ii)(I). The 25 percent limitation, the Commission stated in its 1980 rulemaking, sets forth a “simple rule” “specifying the minimum amounts of fuel under clauses (i) and (ii)” of § 201(17)(B). FERC Stats. & Regs., Regulations Preambles 1977-1981, ¶ 30,134, at 30,-945 (1980). Clause (ii) of § 201(17)(B) contains the “unanticipated equipment outages” provision. The Commission explained to petitioner that its rule, “by permitting a small power production facility the leeway to utilize up to 25 percent fossil fuel, ... would enable the facility to prevent unanticipated equipment outages.” New Charleston Power I, L.P., 66 F.E.R.C. ¶ 61,221, at 61,502 (1994).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
56 F.3d 1430, 312 U.S. App. D.C. 360, Counsel Stack Legal Research, https://law.counselstack.com/opinion/new-charleston-power-i-lp-v-federal-energy-regulatory-commission-cadc-1995.