Morietta v. Reese Construction Co.

808 N.E.2d 1046, 347 Ill. App. 3d 1077, 283 Ill. Dec. 758, 2004 Ill. App. LEXIS 417
CourtAppellate Court of Illinois
DecidedApril 22, 2004
Docket5-03-0215
StatusPublished
Cited by18 cases

This text of 808 N.E.2d 1046 (Morietta v. Reese Construction Co.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Morietta v. Reese Construction Co., 808 N.E.2d 1046, 347 Ill. App. 3d 1077, 283 Ill. Dec. 758, 2004 Ill. App. LEXIS 417 (Ill. Ct. App. 2004).

Opinion

JUSTICE HOPKINS

delivered the opinion of the court:

The plaintiff, Larry Morietta, appeals from the trial court’s order granting a summary judgment in favor of the defendant, Reese Construction Company. On appeal, the plaintiff contends that the trial court erred in determining (1) that the statute-of-limitations provision of section 13 — 214(a) of the Code of Civil Procedure (735 ILCS 5/13— 214(a) (West 2002)) was inapplicable and (2) that the discovery rule was inapplicable. We affirm.

FACTS

On June 3, 1998, the plaintiff was driving southbound on Illinois Route 4. At about 0.4 miles south of mile marker No. 6, the plaintiffs vehicle hydroplaned on standing water on the road, which caused him to lose control, leave the road, enter a ditch, and flip his car over onto the driver’s side. The plaintiff suffered a back injury as a result of the accident.

On June 4, 2001, three years after the accident, the plaintiff filed his negligence complaint against the defendant. The plaintiff alleged that the defendant had done negligent work on Illinois Route 4 in that the defendant “failed to properly design,” “failed to properly specify the manner and method of construction,” “failed to supervise the repaving,” “failed to properly compact the new surface,” and “failed to build a proper crown” during the construction of the road so that water did not drain from the surface during a rain. The plaintiff also alleged that he did not learn until May 2001 that the accident was the result of negligence. The defendant’s answer included several affirmative defenses, inter alia, that the plaintiffs cause of action was barred either by the statute of limitations, because he filed his complaint more than two years after his cause of action had accrued, or by the contractor-specification defense.

According to the pleadings, attachments, and memorandums of law, the defendant successfully bid on a road project let by the Illinois Department of Transportation (IDOT) in 1994, which consisted of “9.3 miles of pavement patching, bituminous surface removal and 26 ft. and variable width bituminous concrete resurfacing on Illinois Route 4 from south of FAI Route 70 to Randle Street in Lebanon.” The project encompassed the area where the plaintiffs accident occurred. The roadwork was done in accordance with the plans and specifications provided by IDOT. Further, resident engineers from IDOT were present daily during the work project to ensure that the defendant followed IDOT’s plans and specifications. The work project did not involve the construction of a new road or the widening of the existing road but only encompassed the removal and repavement of the existing road. On January 3, 1995, IDOT sent the defendant a letter of final acceptance indicating that a final inspection had been done and that the work on the project was complete and in compliance with the applicable plans and specifications.

The defendant filed a motion for a summary judgment, claiming that the plaintiff s complaint was barred by the two-year statute of limitations of section 13 — 202 of the Code of Civil Procedure (735 ILCS 5/13 — 202 (West 2002)) and that the complaint was also barred by the contractor-specification defense, i.e., the defendant cannot be liable because the work on Illinois Route 4 had been done in accordance with IDOT’s plans and specifications. In response, the plaintiff argued that his action was not time-barred because it had been filed within the four-year statute of limitations of section 13 — 214(a) and, alternatively, that the time for bringing the plaintiffs cause of action did not commence until he discovered that his injury had been caused by negligence (the discovery rule). The plaintiff also asked the court to continue any decision concerning the contractor-specification defense until he received all the discovery materials from IDOT.

On March 10, 2002, the court granted the defendant’s motion for a summary judgment, finding that section 13 — 214 does not apply to the plaintiffs cause of action because the defendant’s work was not an improvement to real property and that the “discovery rule” did not apply because the plaintiff “knew at the time of the accident on June 3, 1998[,] that his accident was caused by accumulated water and was therefore on notice to investigate whether the accumulation was caused by negligence.” The plaintiff filed his timely notice of appeal.

ANALYSIS

1. Standard of Review

A summary judgment is a drastic means of disposing of litigation and is only to be granted when pleadings, depositions, admissions on file, and affidavits, if any, establish that there is no genuine issue of any material fact and that the moving party is entitled to a judgment as a matter of law. Outboard Marine Corp. v. Liberty Mutual Insurance Co., 154 Ill. 2d 90 (1992); Jinkins v. Lee, 337 Ill. App. 3d 403 (2003), aff’d, 209 Ill. 2d 320 (2004). The review of the grant of a summary judgment is de novo. Outboard Marine Corp., 154 Ill. 2d at 102. In reviewing a summary judgment, a court construes evidentiary material strictly against the moving party and in the light most favorable to the nonmoving party. Jinkins, 337 Ill. App. 3d at 409. A genuine issue of material fact exists where there is a dispute on a material fact or where the facts are undisputed but reasonable minds might differ in drawing inferences from the facts. Jinkins, 337 Ill. App. 3d at 409. If facts are not disputed and the issue is one of statutory interpretation, the issue is reviewed as a matter of law. Jacobson v. General Finance Corp., 227 Ill. App. 3d 1089 (1992).

2. Statute of Limitations

The plaintiff argues that the trial court erred in determining that the construction statute of limitations of section 13 — 214(a) was inapplicable and that the general statute of limitations of section 13 — 202 applied (735 ILCS 5/13 — 214(a), 13 — 202 (West 2002)). The plaintiff claims that the four-year statute of limitations applies because the defendant’s removal and repaving of Illinois Route 4 under the IDOT contract meets all the criteria for an improvement to real estate.

Section 13 — 214(a) applies to any actions “based upon tort, contract!,] or otherwise against any person for an act or omission of such person in the design, planning, supervision, observation[,] or management of construction, or construction of an improvement to real property.” 735 ILCS 5/13 — 214(a) (West 2002). Section 13 — 214 applies to all parties engaged in construction activities. Wright v. Board of Education of the City of Chicago, 335 Ill. App. 3d 948 (2002). If the special statute of limitations of section 13 — 214(a) does not apply to the plaintiffs case, then the general statute of limitations of section 13 — 202 of the Code of Civil Procedure applies. 735 ILCS 5/13 — 202 (West 2002); Hernon v. E.W. Corrigan Construction Co., 149 Ill. 2d 190 (1992).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Mitchell v. Michael's Sports Lounge
2023 IL App (1st) 220011 (Appellate Court of Illinois, 2023)
M&S Industrial Co., Inc. v. Allahverdi
2018 IL App (1st) 172028 (Appellate Court of Illinois, 2018)
Fireman's Fund Insurance Co. v. Rockford Heating & Air Conditioning, Inc.
2014 IL App (2d) 130566 (Appellate Court of Illinois, 2014)
Peabody-Waterside Development, LLC v. Islands of Waterside, LLC
2013 IL App (5th) 120490 (Appellate Court of Illinois, 2013)
Bruns v. City of Centralia, Illinois
2013 IL App (5th) 130094 (Appellate Court of Illinois, 2013)
Bruns v. The City of Centrailia, Illinois
2013 IL App (5th) 130094 (Appellate Court of Illinois, 2013)
Schott v. Halloran Construction Company, Inc.
2013 IL App (5th) 110428 (Appellate Court of Illinois, 2013)
Richards v. Eli Lilly & Co.
355 F. App'x 74 (Seventh Circuit, 2009)
Ambrosia Land Investments, LLC v. Peabody Coal Co.
521 F.3d 778 (Seventh Circuit, 2008)
Nye v. Leavell
376 Ill. App. 3d 437 (Appellate Court of Illinois, 2007)
Illinois Mine Subsidence Insurance Fund v. Peabody Coal Co.
383 F. Supp. 2d 1078 (C.D. Illinois, 2005)

Cite This Page — Counsel Stack

Bluebook (online)
808 N.E.2d 1046, 347 Ill. App. 3d 1077, 283 Ill. Dec. 758, 2004 Ill. App. LEXIS 417, Counsel Stack Legal Research, https://law.counselstack.com/opinion/morietta-v-reese-construction-co-illappct-2004.