McGuire v. Voight

49 N.W.2d 472, 242 Iowa 1106, 1951 Iowa Sup. LEXIS 440
Supreme Court of Iowa·Decided October 16, 1951·No. No. 47835·Published·Cited by 5 cases

Opinion

Mulroney, J.

Eleven landowners in extension of Drainage District No. 9, Kossuth County, Iowa, sued the county treasurer, the county auditor, the county board of supervisors and Kossuth County Drainage District No. 9, alleging the board of supervisors had entered into a contract with one Faber “for the removal of all [1108] trees, brush and shrubs from both sides of the ditch bank of said extension of Drainage District No. 9”; that the board approved the completed work amounting to $16,201; that the auditor had issued warrants to the contractor in payment therefor; and the auditor had certified to the county treasurer the 1948 assessment against the plaintiffs and other landowners in extension of Drainage District No. 9 to collect the cost and expenses of the Faber contract. The petition attacks the assessment on two main grounds as follows: (1) The Faber contract was not the result of any legal petition filed by the landowners in the extension of Drainage District No. 9, and it was let without notice to plaintiffs and “not in compliance with the requirements of the statutes of the State of Iowa.” (2) The extension of Drainage District No. 9 is a continuation of Drainage District No. 9 and the removal of the trees in the extension would be equally of benefit to Drainage District No. 9 and the assessment should be so spread as to include the landowners in Drainage District No. 9. The prayer of the petition was for a decree “nullifying the proceedings which instituted' and carried into effect the work performed * * * under the Faber contract” or in the event that is not granted then a decree reassessing the expense to include the land in Drainage District No. 9.

The defendants’ answer admits practically all of the factual allegations of the petition and expressly states that the work was necessary repair work, authorized by statute without notice.

In a pre-trial conference plaintiffs sought and secured a unique arrangement whereby the two main complaints alleged in their petition should be tried separately; that the court should first try the issue as to whether the assessment was a nullity — for failure to give notice of the letting of the contract, etc.- — and, if the court decided it was not, then the other issue as to whether the assessment should embrace the land in District No. 9 would be tried.

Thereafter petitions of intervention were filed by certain banks, who were holders by assignment of the warrants, and a numbe* of landowners in District No. 9.

Pursuant to the pre-trial arrangement the first issue was tried, resulting in a decree that the proceedings were not a nullity [1109] based on the trial court’s conclusion that the work on the Faber contract was mere repair. Plaintiffs, evidently under the impression their pre-trial arrangement gave them the right to appeal without consent, have appealed as if from a final judgment and decision. But all parties agree the reserved issue as to' whether the assessment should include the land in District No. 9 has not been tried. Without approving such procedure we will affirm the trial court’s decree.

I. The single question presented is whether the work of the Faber contract was repair or new construction. If it was a repair job then under the statutes, sections 455.138 and -455.140, Code, 1946, and under our holding in Haugen v. Humboldt-Kossuth Joint Drainage District, 231 Iowa 288, 311, 1 N.W.2d 242, 254, the statutory requisites of notice, public letting of contract, engineer’s supervision, etc., required for new construction, have no application. There is no necessity for an extensive review of our prior decisions. This was done by Justice Bliss in the Haugen opinion. As stated, the question is one of fact: whether the removal of trees was repair or new construction. In the Haugen case we said the statute, section 455.140, Code, 1946, provides its own definition of repairs in the following language of the statute: “the work and materials as is required to clean out any specific open ditch * * * so as to restore it to its original efficiency or capacity and to preserve its sides at a practical slope * *

Extension District No. 9 is an open ditch, approximately four miles long, established in 1911 at a cost of $8192.75. As plaintiffs state in their statement of facts:

“It is clear from the evidence that from the time the ditch was constructed in ‘Extension of Drainage District No. 9’ in 1911 up to 1946 the board of supervisors failed to properly maintain the ditch and allowed a large number of trees to grow along the ditch banks and on the waste banks, which by 1946 had developed into' considerable size.”

About June 10, 1946, eight landowners in Extension of District No. 9 (six of them plaintiffs in this action) filed their signed petition with the board requesting “that the Board of Supervisors take steps to have the Main Open Ditch of Drain Extension No. 9 [1110] cleaned out # * * the ditch to the south being filled with silt, trees and other debris.” The board'appointed engineer Thorne to make a survey and report. The engineer’s report, filed October 1, 1947, contains an item “clearing and grubbing 2085 trees $7335.25” and also the following statement of the engineer: “It has been my intention to lay the grade of this work on the same line of levels as that used by the engineer on the original construction and to have the same efficiency as the first constructed ditch.” Thereafter the board contracted with Faber to “remove all the. trees, brush and shrubs from both sides of the ditch bank of the open ditch of Drainage District No. 9 -Extension.”

There can be no question under this record but that the work of the Faber contract was repair work and not new construction. It was work to clean out an open ditch to restore it to its original efficiency or capacity, within the very words of the statute (section 455.140, Code, 1946). Plaintiffs argue several propositions not at all germane to the pleaded issues and we find but little argument in plaintiffs’ brief contending that the actual work done was not repair.

Free access — add to your briefcase to read the full text and ask questions with AI

McGuire v. Voight, 49 N.W.2d 472, 242 Iowa 1106, 1951 Iowa Sup. LEXIS 440 (iowa 1951).

49 N.W.2d 472 (McGuire v. Voight) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Hicks v. Franklin County Auditor
514 N.W.2d 431 (Supreme Court of Iowa, 1994)
Voogd v. JOINT DRAIN. DIST., KOSSUTH & WINNEBAGO COS.
188 N.W.2d 387 (Supreme Court of Iowa, 1971)
Thompson v. Joint Drainage District No. 3-11
143 N.W.2d 326 (Supreme Court of Iowa, 1966)
Johnson v. Monona-Harrison Drainage District
68 N.W.2d 517 (Supreme Court of Iowa, 1955)