Louisville & Nashville Railroad v. Conn

179 S.W. 195, 166 Ky. 327, 1915 Ky. LEXIS 670
CourtCourt of Appeals of Kentucky
DecidedOctober 21, 1915
StatusPublished
Cited by9 cases

This text of 179 S.W. 195 (Louisville & Nashville Railroad v. Conn) is published on Counsel Stack Legal Research, covering Court of Appeals of Kentucky primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Louisville & Nashville Railroad v. Conn, 179 S.W. 195, 166 Ky. 327, 1915 Ky. LEXIS 670 (Ky. Ct. App. 1915).

Opinion

[328]*328Opinion op the Court by

William; Rogers Clay, Commissioner.

Reversing.

In this suit against the Louisville & Nashville Railroad Company to recover damages to his property, alleged to have been caused by the diversion of the waters of Paint Lick Creek, plaintiff, George W. Conn, recovered a verdict and judgment for $2,000. The railroad company appeals.

Plaintiff’s property lies in the town of Paint Lick. At this point Paint Lick Creek runs between the counties of Garrard and Madison. Defendant’s railroad runs from Richmond to Lancaster in a southwestern direction. The creek runs in a northwestern direction. The villag’e of Paint Lick is located principally between the railroad track and the creek. The principal street of Paint Lick, which is the Richmond and Lancaster turnpike, crosses the railroad track about eight or nine hundred feet from the railroad bridge on the Garrard side. Prom this crossing it is about three hundred feet from the pike bridge over the creek. Plaintiff’s residence faces this street near the railroad track. Back of plaintiff’s residence is his shop, and further back is Rucker’s barn. The land back of these buildings is bottom land and is about ten feet lower than the railroad track and the street.

In July, 1909, the railroad company reconstructed its bridge at Paint Lick. At that point the channel proper of the creek is about 160 feet wide. On each side of the channel proper the bank ascends, and from the top of one of these banks to the other the distance is 448 feet. In reconstructing the bridge the company placed two additional stone piers thereunder. These piers were 17 feet high and 6 feet wide. According to the testimony for plaintiff, the stone abutments were lowered 18 inches by taking out two stones, and the bridge was let down 18 inches lower than the old bridge. At the top of the bridge the iron plate girders were 4 feet deep and the rails and cross ties 12 inches deep. The dirt fill on the Madison side was 20 feet high and about 150 feet long. On the Garrard side it was 50 feet long and 20 feet high. Estimating the channel of the creek as extending not from the banks proper but from the ascending bank on each side, about 74 per cent, of the channel, as a whole, was obstructed. One of the engineers who testified for plaintiff stated that the effect of this was to set the' waters [329]*329back about 6,000 feet east of the bridge. Another engineer, named Tinsley, testified that the new bridge was about 2y2 feet below the “old high water mark” of 96.7. He ascertained this fact by consulting a number of men. Plaintiff’s proof tends to show that on the occasion of the flood the waters of the creek broke and overflowed the fill and washed away the railroad track for a distance of about 420 feet. Two or three witnesses say that they had seen it rain as hard before. Plaintiff further showed that while the bridge was under construction, W. G-. Kemper wrote the superintendent a letter, in which he •expressed the opinion that the construction of two more pillars under the bridge would likely cause an overflow of the creek and cause damage to Paint Lick. According to plaintiff’s testimony, the water rose in his house for •several feet and injured it, and damaged or practically •destroyed certain articles of personal property. The water remained in his house for about an hour. It was three hours before the water returned to the channel of the creek. Other witnesses say that the waters went down in from fifteen minutes to an hour. Plaintiff further testified that the water that entered his house came from over the railroad. In the opinion of the witnesses, the value of plaintiff’s property was depreciated from forty to fifty per cent, by reason of the reconstruction of the bridge.

According to the evidence for the defendant, the two •stones that were removed from the abutments were replaced with creosote timbers and the bottom of the present girder is 2 or 3 inches higher in elevation than the old span. 'On being apprised of the fear on the part of the residents of Paint Lick that the bridge might cause an overflow, A. P. Prendburg, the company’s engineer, made .a careful investigation and estimated the Paint Lick water shed as containing 50 square miles. As a matter of fact, the government map showed it to be 46 square miles. To permit the passage of this water required 387 cubic feet per second per square mile. The bridge provided for 478 cubic feet. The high water mark of March, 1913, was 7 feet and 1 inch higher than the old high water mark. The old high water mark was 6.9 feet below the top of the bridge and 2.3 feet below the bottom of the girder. He further stated that the fills on each side of the bridge were not in the natural channel of the stream. In his opinion, the opening under the [330]*330bridge was fully adequate, not only to allow the water to pass from usual and ordinary rainfalls and floods, but was sufficient for all previous rainfalls and floods in that vicinity, whether ordinary or extraordinary. Other witnesses testified that the old high water mark was something like a foot and one-half below the girder of the present bridge. It was also shown that the pressure above the fill was not sufficient to push out the fill. It would have taken ten or twelve times the amount of pressure to have done so. The fill was washed out by the water overflowing the fill. Defendant further showed that the bench mark, or the point from which the high water elevations were taken prior to 1909, was 3 feet and 2 inches lower than the bench mark used in 1913. It also appears that the pike bridge some distance below the railroad bridge was washed away.

As to the character of the flood and the. height of the waters on the occasion complained of, defendant introduced several witnesses. Dan Bodkins, who lived at Wallaceton, which is five miles above Paint Lick, and who had known Paint Lick Creek for twelve years, testified that the creek was two or three feet higher than he had ever known • it before. - The tide was a great deal larger and higher than on any previous occasion. Across the bottom the creek was 200 yards wider than he had ever seen it before. There was a hard downpour of rain and bridges, culverts, fences and things which had never been washed out since he had been there, were carried away. William Asher, who lived on Paint Lick Creek about two miles below Wallaceton, stated that Walnut Meadow Creek intersected Paint Lick Creek and lower down White Lick Creek ran into it. He had lived on the Wallaceton prong of Paint Lick Creek for fifteen years and in the Wallaceton neighborhood for over twenty years. He had also lived at Paint Lick for twelve years. In his judgment, the creek was three or four feet higher than it had ever been before. Pences and buildings that had never been carried away were washed away. The creek was 100 yards wider than he had ever seen it on any prior occasion. J. B. Gruynn, who .lived on Paint Lick Creek about two miles above Paint Lick depot for about fifty-four years, said that at his place the water was from four to four and one-half feet higher during the March, 1913, flood than he had ever seen it before. At his home place further down the creek the. water was four and one-[331]*331half feet higher than on any previous occasion. This was about a mile above Paint Lick. The water came into his yard and had never been there before during his knowledge of the creek. James Todd, who lived on Paint Lick Creek and had known it. for forty years, says that the creek was from four to six feet higher than he had ever seen it before. It was 100 feet wider on the Garrard side.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Chesapeake & O. Ry. Co. v. Saulsberry
89 S.W.2d 949 (Court of Appeals of Kentucky (pre-1976), 1935)
Seay v. City of Louisville
82 S.W.2d 212 (Court of Appeals of Kentucky (pre-1976), 1935)
Heckaman v. Northern Pacific Railway Co.
20 P.2d 258 (Montana Supreme Court, 1933)
Lincoln Coal Company v. Deaton
17 S.W.2d 249 (Court of Appeals of Kentucky (pre-1976), 1929)
Fordson Coal Company v. Pleasnick
287 S.W. 11 (Court of Appeals of Kentucky (pre-1976), 1926)
Eikland v. Casey
266 F. 821 (Ninth Circuit, 1920)
City of Lexington v. Henderson
203 S.W. 528 (Court of Appeals of Kentucky, 1918)
Louisville & Nashville Railroad v. Conn.
200 S.W. 952 (Court of Appeals of Kentucky, 1918)

Cite This Page — Counsel Stack

Bluebook (online)
179 S.W. 195, 166 Ky. 327, 1915 Ky. LEXIS 670, Counsel Stack Legal Research, https://law.counselstack.com/opinion/louisville-nashville-railroad-v-conn-kyctapp-1915.