Lauer v. Pierce County

267 P.3d 988, 173 Wash. 2d 242
Washington Supreme Court·Decided December 15, 2011·No. No. 85177-8·Published·Cited by 23 cases

Opinion

Owens, J.

¶1 Louise Lauer and Darrell de Tienne separately own properties that neighbor a lot owned by Mike and Shima Garrison. Through a Land Use Petition Act (LUPA) petition, chapter 36.70C RCW, Lauer and de Tienne challenge a fish and wildlife variance granted to the Garrisons by Pierce County (the County) to build a single family residence within the protective buffer zone of a stream that runs across the Garrisons’ property. The central issue before us is whether the Garrisons’ rights vested in 2004 when they submitted their building application. The Garrisons also raise questions about the standing and timeliness of Lauer and de Tienne’s claim, as well as whether the relevant critical area regulation even applies to the Garrisons’ shoreline property. We hold that Lauer and de Tienne properly petitioned the superior court for review and that, because the Garrisons’ building permit application contained misrepresentations of material fact, the Garrisons’ rights did not vest in 2004.

[249] FACTS

¶2 In December 2002, the Garrisons purchased a waterfront parcel of property on Henderson Bay in Gig Harbor, Washington. The property included an existing single-family residence. A Department of Natural Resources (DNR) type 4 or type 5 watercourse — specifically, a non-fish-bearing stream — runs southward across the southwest portion of the Garrisons’ property. Petitioners Lauer and de Tienne are the Garrisons’ neighbors to the east and west, respectively.

¶3 A few months after purchasing their property, the Garrisons illegally cleared vegetation from within the property’s watercourse and its buffer. Former Pierce County Code (PCC) 18E.60.050(C), (D) (1997) required a 35-foot-wide buffer on both sides of “DNR Water Type 1 through 5” rivers and streams and an 8-foot-wide setback from the buffer for any construction over a certain size. See also Pierce County Ordinance 97-84, § 8 (Dec. 30,1997). Current regulations require that the buffer be at least 65 feet wide. PCC 18E.40.060(B)(3).1 Upon receiving a complaint about the clearing, the County investigated and issued a stop work order on March 7, 2003, instructing the Garrisons to stop clearing and requiring that they revegetate the area. As part of that process, the Garrisons submitted a planting plan to the County, including a diagram of their property, which depicted the “existing drainage” and, north of that, an “existing trail.” Clerk’s Papers at 96-98.

¶4 In March 2004, the Garrisons filed a building permit application for a single-family residential dwelling between their existing home and the shoreline. The site plan diagram submitted with the application did not label the watercourse or its buffer and mislabeled the trail as an [250] “existing drive.”2 Administrative R. (AR) at 263. The proposed residence was squarely within the 35-foot buffer of the watercourse. The County approved the permit, and the Garrisons began construction. In October 2004, the County conducted another site visit and issued another cease and desist order because the Garrisons were building within the drainage buffer. The building permit was suspended, and the Garrisons were directed to apply for a fish and wildlife variance within 60 days.

¶5 Instead, the Garrisons challenged the cease and desist order, and the County held a hearing on the matter. The Garrisons specifically claimed that a stream did not exist on their property and, alternatively, if it did, it was actually drainage that was illegally directed onto their parcel by de Tienne. A hearing examiner denied the Garrisons’ claim, upholding the cease and desist order. The hearing examiner found that “[t]he drainage course [on the Garrisons’ property] meets the definition of a DNR Type 4 or 5 watercourse and therefore requires a 35 foot wide, undisturbed buffer.” AR at 90. The hearing examiner also found that

the 2003 site plan prepared by the appellants in response to a Pierce County enforcement action regarding illegal clearing shows a “trail” alongside the drainage course in the same location as the “existing drive.” Numerous exhibits and substantial testimony show that a trail and not a “drive” existed historically along the east side of the drainage course. Appellants cannot, therefore, assert that they justifiably relied upon the Pierce County inspector’s approval of the footing location.

Id. at 98 (emphasis added). The Garrisons’ motion for reconsideration was denied.

[251] ¶6 The Garrisons appealed the hearing decision to the superior court in a LUPA petition. According to the Garrisons, they voluntarily withdrew the petition based on an agreement with the County that they could “seek a variance and the County would process the variance under the regulations that were in effect in 2004.” Br. of Appellants Garrison at 8-9. Neither the LUPA petition nor the supposed agreement is part of the record before us, and therefore, we do not consider them.

¶7 Effective on March 1, 2005, the County changed the required buffer for streams like the one on the Garrisons’ property from 35 feet to 65 feet. Pierce County Ordinance 2004-56s, § 4 (Oct. 19, 2004) (codified as PCC 18E.40.060(B)(3)). Besides the buffer increase, the County’s requirements for acquiring a variance also became more stringent. Compare former PCC 18E.10.070(D)(4) (1997), with PCC 18E.40.060(C)(2).

¶8 On August 9, 2007, over two years after the buffer and variance criteria changes, the Garrisons filed for a fish and wildlife variance. Lauer and de Tienne participated in the hearing, opposing the variance. In particular, Lauer and de Tienne argued that the applicable provisions for determining whether to grant the variance were the current regulations, not those in effect when the building permit was submitted in 2004. At the hearing, the County supported the Garrisons’ efforts to get a variance, agreeing that the Garrisons’ rights vested in 2004.

¶9 Following the hearing, a county deputy hearing examiner applied the 2004 regulations, finding that the Garrisons’ rights had vested in March 2004, and approved the variance in December 2007. Lauer and de Tienne filed a request of reconsideration of the variance decision, which was denied on March 4, 2008.

Free access — add to your briefcase to read the full text and ask questions with AI

Lauer v. Pierce County, 267 P.3d 988, 173 Wash. 2d 242 (Wash. 2011).

267 P.3d 988 (Lauer v. Pierce County) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Ncng, Llc, V Clark County
Court of Appeals of Washington, 2024
Hollywood Hill Neighbors, V. King County
Court of Appeals of Washington, 2023
Cape St. Mary Associates v. San Juan County
Court of Appeals of Washington, 2020
Donald And Kathleen Miller v. City Of Sammamish
447 P.3d 593 (Court of Appeals of Washington, 2019)
Schnitzer West, Llc v. City Of Puyallup
Court of Appeals of Washington, 2019
Brian Byrd v. Pierce County
425 P.3d 948 (Court of Appeals of Washington, 2018)
Snohomish County v. Pollution Control Hearings Board
386 P.3d 1064 (Washington Supreme Court, 2016)
Snohomish County v. Pollution Control Hearings Board
368 P.3d 194 (Court of Appeals of Washington, 2016)
Klineburger v. King County
356 P.3d 223 (Court of Appeals of Washington, 2015)
Richard Colf v. Clark County
Court of Appeals of Washington, 2014
Town of Woodway v. Snohomish County
Washington Supreme Court, 2014
Khushdev & Harbhajan Mangat v. Snohomish County
Court of Appeals of Washington, 2013
Lakey v. Puget Sound Energy, Inc.
296 P.3d 860 (Washington Supreme Court, 2013)
Lakey v. Puget Sound Energy
Washington Supreme Court, 2013
Department of Ecology v. City of Spokane Valley
167 Wash. App. 952 (Court of Appeals of Washington, 2012)