Kirk v. Walter E. Deuchler Associates, Inc.

398 N.E.2d 603, 79 Ill. App. 3d 416, 34 Ill. Dec. 780, 1979 Ill. App. LEXIS 3721
CourtAppellate Court of Illinois
DecidedDecember 7, 1979
Docket77-432
StatusPublished
Cited by10 cases

This text of 398 N.E.2d 603 (Kirk v. Walter E. Deuchler Associates, Inc.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Kirk v. Walter E. Deuchler Associates, Inc., 398 N.E.2d 603, 79 Ill. App. 3d 416, 34 Ill. Dec. 780, 1979 Ill. App. LEXIS 3721 (Ill. Ct. App. 1979).

Opinion

Mr. JUSTICE GUILD

delivered the opinion of the court:

The plaintiff herein and his wife brought suit against the Aurora Sanitary District (District) and Walter Deuchler Associates, Inc. (Deuchler) under the Structural Work Act (Ill. Rev. Stat. 1973, ch. 48, pars. 60-69). Plaintiff was employed by the Matt Walton Sewer Construction Company (Walton), which was installing a sewage system in Aurora for the District. Walton is not a party to this action, and it is surmised that plaintiff proceeded under the Workmen’s Compensation Act, insofar as the liability, if any, of Walton was concerned.

Trial was had in the circuit court of Kane County in February 1977. During that trial a great deal of evidence was introduced by the plaintiffs. At the close of the plaintiffs’ case they were allowed to amend their original complaint to conform to the proofs. In essence the amended complaint alleged that the defendants violated the Structural Work Act by allowing the use of a particular method of lifting the load which injured the plaintiff and also by the failure of the defendants to require the use of a complete and adequate system of hand signals in conjunction with that lifting system. At the same time each of the defendants moved for a directed verdict on the grounds that they were not in charge of the work and that the plaintiffs had not proven a case as a matter of law. These motions were denied. Neither of the defendants presented any testimony.

The jury returned a verdict for the plaintiff, Norman Kirk, in the sum of $250,000 for actual and prospective damages and *20,000 in actual and prospective damages to the plaintiff Helen Kirk for loss of consortium. The post-trial motions for judgment n.o.v. of the defendants were denied, and they appeal.

Four issues must be resolved to properly dispose of this case: (1) whether a jury question existed as to which, if either, of the defendants were “in charge of the work”; (2) whether section 67 of the Structural Work Act imposes liability as a matter of law upon an engineer or architect for the absence of a complete or adequate system of signals for use in the lifting or hoisting of materials on a job site; (3) whether the evidence fails to support the jury’s verdict in favor of the plaintiff; and (4) whether the trial court committed prejudicial error related to voir dire examination, admission of evidence, or instructions to the jury.

I

We consider first who was “in charge of the work.” Section 9 of the Structural Work Act (Ill. Rev. Stat. 1977, ch. 48, par. 69) provides, in pertinent part, that “[a]ny owner, contractor, sub-contractor, foreman or other person having charge of the erection, construction, repairing, alteration, removal or painting of * * * or other structure within the provisions of this act * ° shall be liable “[f]or any injury to person or property, occasioned by any wilful violations of this act, or wilful failure to comply with any of its provisions, a right of action shall accrue to the party injured ” "

We have examined the record and conclude that it would serve no purpose to set out the contractual relationship between the defendants and the plaintiff’s employer in detail. It is sufficient for us to note that the District had the right to take over the work upon 10 days notice after a failure by Walton to fully or adequately perform the work; or due to his financial incapacity. Additionally, the District had its limited right to modify the plans during the project as well as the right to inspect the system prior to its acceptance. The sole direct connection between the District and the work on the site was an inspector in its employ. That inspector, Gerald Abel, appeared at the site for an undetermined period of time most every day that work was in progress. His instructions from the District were to report back to them as to the quality of the work being performed. The record reveals that upon occasion, however, Abel gave “advice” to Walton’s foreman on the site. However, the record is equally clear that this “advice” was informal in nature and was outside the scope of Abel’s actual authority.

Deuchler, the general project engineer, acted as the District’s principal agent under the contract. As such, it was vested with authority to approve suspensions in the work; to itself suspend the work due to unfavorable weather conditions or other factors; to make or approve variations in plans or materials; and to require the removal of a contractor’s employee from the project for carelessness, obstructionism or incompetence. Additionally, the engineer had an independent right to inspect the project. To this end it maintained its own field inspector on the site to monitor quality control. The record also reveals testimony by the Walton Construction Company’s co-owner, Hallie Gene Moore, that the engineer (an employee of Deuchler) was “virtually our boss.”

The standards which are to be applied in reviewing whether a jury properly found a defendant to be “in charge of the work” under the Structural Work Act have been recently discussed by the supreme court in Norton v. Wilbur Waggoner Equipment Rental & Excavating Co. (1979), 76 Ill. 2d 481, 485-86, 394 N.E.2d 403, 405, where the majority stated that:

“The question of who has charge of the construction-is a question of fact for the jury. [Citations.] Moreover, this court has determined that the term ‘having charge of should not be defined for the jury because it is ‘one of common usage and understanding, and 9 9 9 further attempt at definition can only lead to confusion and error.’ [Citation.] Hence Illinois Pattern Jury Instructions Civil, section 180.16 (2d ed. 1971), provides for no such instruction.”

The facts involved in Norton closely parallel those in the case before us with regard to the Aurora Sanitary District. It, like the school district in Norton, was related by contract with the injured workman’s employer and that contract provided for the rights to stop work and to modify the work in progress, as well as to inspect. Additionally, both the District here and the school district in Norton controlled the construction through a general agent. In Norton the agent was the architect, here it was the project engineer, Deuchler. The sole difference between these cases, which we do not find to be determinative, is the fact that the school district in Norton itself maintained a “clerk of the work” who subjected the site to continuous close scrutiny while here we only had periodic inspection by an employee of the District. As a result of this close similarity to Norton, we will not disturb the finding of the jury that the Aurora Sanitary District was “in charge of the work.”

Regarding Deuchler, we have a slightly different situation. In Emberton v. State Farm Mutual Automobile Insurance Co. (1978), 71 Ill. 2d 111, 373 N.E.2d 1348, the supreme court specifically held that an architect was clearly within the provisions of the Structural Work Act because he had the contractual right to stop or suspend the work in order to insure the proper performance of the contract. In the instant case, Deuchler had a similar right and, in addition, had the other duties and rights enumerated above. Therefore, we will not disturb the jury’s finding that Deuchler was also “in charge of the work.”

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Hawkes v. Casino Queen, Inc.
785 N.E.2d 507 (Appellate Court of Illinois, 2003)
Hawkes v. Casino Queen, Inc. Corrected Opinion
Appellate Court of Illinois, 2003
Ronald Dean Reed v. Union Pacific Railroad Company
185 F.3d 712 (Seventh Circuit, 1999)
Limer v. Casassa
652 N.E.2d 854 (Appellate Court of Illinois, 1995)
Sasser v. Alfred Benesch & Co.
576 N.E.2d 303 (Appellate Court of Illinois, 1991)
Lyle v. Sester
430 N.E.2d 699 (Appellate Court of Illinois, 1981)
Kirk v. Walter E. Deuchler Associates, Inc.
420 N.E.2d 1124 (Appellate Court of Illinois, 1981)
Hausam v. Victor Gruen & Associates
408 N.E.2d 1051 (Appellate Court of Illinois, 1980)
Robinson v. Greeley & Hansen
408 N.E.2d 723 (Appellate Court of Illinois, 1980)

Cite This Page — Counsel Stack

Bluebook (online)
398 N.E.2d 603, 79 Ill. App. 3d 416, 34 Ill. Dec. 780, 1979 Ill. App. LEXIS 3721, Counsel Stack Legal Research, https://law.counselstack.com/opinion/kirk-v-walter-e-deuchler-associates-inc-illappct-1979.