AMENDED MEMORANDUM OPINION AND ORDER

JOSEPH H. McKINLEY, JR., Chief Judge.

This matter is before the Court on cross-motions for judgment on the administrative record [DN 32, DN 46], Fully briefed, this matter is ripe for decision.

I. BACKGROUND

On February 16, 2012, the Environmental Protection Agency (EPA) issued regulations known as the Mercury and Air Toxics Standards (MATS) requiring operators of coal-fired power plants, including Tennessee Valley Authority, to reduce hazardous pollutants emitted from their plants by April 16, 2015, or by April 16, 2016, if an extension was granted. In August of 2012, TVA Board of Directors approved a budget that included the funding to upgrade the existing emission controls at Paradise Units 1 and 2 by installing pulse jet fabric filter systems to comply with MATS emission mandates. In April of 2013, TVA again indicated its intent to upgrade Paradise Units 1 and 2.

In August of 2013, in an effort to comply with MATS, TVA announced a change in its position regarding Paradise Units 1 and 2. TVA released a Draft Environmental Assessment (“EA”) that proposed the following alternatives:' (1) the No Action Alternative, under which TVA would allow the facility to operate out of compliance with the governing laws and regulations [707] (Alternative A); (2) construction and operation of pulse jet fabric filter systems for emission control on Paradise Units 1 and 2 (Alternative B); and (3) retirement of Paradise Units 1 and 2 and construction and operation of a new natural gas-fueled power generating CT/CC plant (Alternative C). Unit 3 at Paradise would remain operational. According to the Draft EA, TVA also considered six other emission reduction alternatives, but eliminated them from detailed analysis because they were determined not to be technically or economically practical or feasible. TVA offered a 30-day comment period, which TVA notes was not required. TVA received 304 comments on the draft EA and most of those comments supported the second alternative.

In November of 2013, TVA issued a 153-page Final EA determining that Alternative C, the proposed action of retiring Paradise Units 1 and 2 and replacing them with a natural gas fueled power plant, was the preferred alternative. TVA determined that the proposed action would not significantly impact the environment and issued a Finding of No Significant Impact (“FONSI”) in accordance with the National Environmental Policy Act (“NEPA”), the Council on Environmental Quality (“CEQ”) regulations, and TVA’s procedures. TVA represents that the Paradise EA builds on or tiers from Environmental Impact Statements (“EIS”) that TVA issued for its 1995 and 2011 Integrated Resource Plan (“IRP”). An IRP is the culmination of a comprehensive utility planning process that evaluates the merits of using different kinds of energy resources to meet forecasted future demand for electricity with the goal of meeting demand reliably and cost effectively. According to TVA, tiering permits an agency to go from a broader NEPA review to a more site-specific NEPA review without readdressing issues or repeating information. TVA states that its decision to replace two coal-fired units with natural gas generation at its Paradise Plant is supported by two linked environmental reviews — the 2011 IRP and the Paradise Final EA.

On July 10, 2014, Plaintiffs, Kentucky Coal Association, Inc., James Rogers III, J.L. Rogers Family, LLC, Talmage Rogers, Talmar of FL., LLC, Pat Early, Kir-stine Early, Buckingham Hollow, LLC, Kevin Lawrence, and Big Bucks, LLC, filed an eight-count complaint seeking a declaration ■ that Defendant, Tennessee Valley Authority, violated the National Environmental Policy Act (NEPA), 42 U.S.C. § 4332, the Administrative Procedures Act, 5 U.S.C. § 555 et seq., and the TVA Act, 16 U.S.C. § 831n-4(f), by conducting a faulty EA, improperly issuing a FONSI, and failing to prepare and issue an EIS concerning the project. The Plaintiffs then filed a motion seeking a preliminary injunction enjoining TVA and its representatives from any activities that implementing TVA’s November 13, 2013, decision to retire Paradise Units 1 and 2 and to construct a new gas-powered generating facility and accompanying gas transport infrastructure. On December 19, 2014, the Court denied the motion for preliminary injunction finding that Plaintiffs had not met their heavy burden to show that a preliminary injunction should be granted.

In September of 2014, Defendants moved for judgment on the administrative record arguing that TVA properly analyzed its decision to replace two coal-fired units at its Paradise Plant with natural gas generation under NEPA and that TVA’s action was neither arbitrary nor capricious under NEPA or the Energy Policy Act of 1992. In November of 2014, Plaintiffs filed a cross-motion for judgment on the administrative . record arguing that that TVA failed to undertake required environmental analysis under NEPA and failed to engage in least-cost planning under the TVA Act [708] in connection with its decision to proceed with Alternative C. Plaintiffs contend that TVA should have conducted an EIS for this project which is required by NEPA, but instead TVA conducted only a more limited EA. According to Plaintiffs, because TVA failed to comply with its statutory mandates under NEPA and the TVA Act, the Court should find TVA’s action arbitrary and capricious and enter judgment for Plaintiffs under both claims.

II. ADMINISTRATIVE REVIEW OF THE NEPA CLAIM

Free access — add to your briefcase to read the full text and ask questions with AI

Kentucky Coal Ass'n v. Tennessee Valley Authority, 68 F. Supp. 3d 703, 2015 WL 461402 (W.D. Ky. 2015).

68 F. Supp. 3d 703 (Kentucky Coal Ass'n v. Tennessee Valley Authority) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related