Kell v. Jansen

127 P.2d 1033, 53 Cal. App. 2d 498, 1942 Cal. App. LEXIS 511
CourtCalifornia Court of Appeal
DecidedJuly 21, 1942
DocketCiv. 6766
StatusPublished
Cited by11 cases

This text of 127 P.2d 1033 (Kell v. Jansen) is published on Counsel Stack Legal Research, covering California Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Kell v. Jansen, 127 P.2d 1033, 53 Cal. App. 2d 498, 1942 Cal. App. LEXIS 511 (Cal. Ct. App. 1942).

Opinion

ADAMS, P. J.

Plaintiffs were the .owners of certain land in Shasta County across which a natural stream known as the east fork of Clear Creek ran in a southwesterly direction to its confluence with Clear Creek which ran along the west side of the property. The only access to the house occupied by the Kells upon the premises was by a road leading from a county road and crossing the east fork over a bridge which Mr. Kell had constructed. Plaintiffs also owned a water right appurtenant to their property, and water for the irrigation of some fifteen or twenty acres of their land was diverted from the said east fork at a point above the upper or northerly line of their property by means of a headgate, dam and ditch.

Defendants were engaged in gold dredging, and in the summer of 1939 they purchased some five acres of the Kells’ land lying on the north side of the east fork, for the purpose of dredging same, after which it was reconveyed to plaintiffs. Operations were begun about August 15th, and continued for eight days, during which time the channel of said east fork was dredged from a point near its confluence with Clear Creek, to a point beyond the boundary of plaintiffs’ land, and extending beyond the Kell diversion dam. In the course of these operations the original channel of the stream was changed, _ the old channel being filled up with tailings. Also the Kell dam and headgate and a part of their ditch were destroyed. The bridge was moved from its original position, the channel which it had formerly spanned was widened by the dredging operations, and the bridge was then set back across ^he new channel. When the fall and winter rains came the channel of the stream was unable to carry the waters with the result that the bridge was washed out and plaintiffs’ ditch was further damaged.

*500 Charging that the damages sustained by plaintiffs because of their loss of the bridge and diversion works were due to the negligence of defendants in the manner in which their dredging operations were carried on, and their negligent deposit of tailings on the banks and in the natural channel of the stream, plaintiffs began this action. Trial was had by the court sitting without a jury, and at its termination findings of fact and conclusions of law were filed, followed by judgment awarding plaintiffs $1,287 for damages to the bridge, $471 for the loss of their dam and headgate, $35 for a fill, and $234 for the destruction of 234 feet of their diversion ditch.

Defendants have appealed contending that the evidence is insufficient to show negligence on their part, that the damages suffered by plaintiffs were due, rather, to an act of God, to wit: an excessive flood that occurred about the first of March, 1940, and that damages were improperly assessed.

The trial court found that in the course of the dredging operations tailings were negligently deposited behind the dredger used therein in the natural channels of Clear creek and the east fork thereof, and that the dredging operations and the negligent deposit of tailings as aforesaid changed, altered, obstructed and destroyed the natural channels of the streams; that during the course of said dredging operations and as a proximate consequence of the negligent deposit of said tailings in the streams the dam and headgate of plaintiffs were entirely destroyed and rendered useless and as a further proximate consequence at least 234 feet of plaintiffs’ ditch was entirely destroyed. As to the bridge it was found that it was removed from its original location and later negligently replaced by defendants, and that thereafter as a proximate consequence of the acts of defendants in altering, changing and obstructing the natural channel of the east fork said bridge was washed away and entirely destroyed, and the banks of the creek greatly widened. As to the claim of defendants that these damages were due to the unprecedented floods that came late in February or early in March, 1940, the court found that prior to said time there had been normal high water which had washed the tailing deposits into the channel and changed the course of the creek in such a manner as proximately to result in the said injuries; that prior to said flood the normal high waters had begun to wash away the tailing piles upon which the bridge was *501 negligently placed and that the washing away of said bridge was proximately contributed to by the high waters flowing down the east fork prior to said flood.

Appellants cannot contend seriously that there is a. total absence of evidence to support the court’s finding of negligence on their part; they do to some extent argue the weight of it, but such matters are for the trial court. It may be noted, however, that defendant Clark testified that they agreed with the Kells that they would not mine up their ditch or their dam, that after their operations the dam was useless unless they put in a few days to open it up, that they tore out the willows where the headgate was, though the willows would be a protection to the ditch in high water, that their caterpillar probably mashed down the banks of the ditch a little, that they mined both sides of the creek, that tailing piles were left, that they had agreed to leave the road and bridge in as good condition as it was formerly, that the stream at the bridge which was formerly twenty feet wide was sixty feet wide after the dredging, that tailings were left across certain portions of the east fork, that the level of the creek bed was raised and that when the bridge was replaced after they took it out it was set back on tailing piles. Mr. Kell testified that tailings were piled on both sides of the stream fifteen feet higher than the original water flow, that the bridge was replaced across an entirely new channel with no bulkheads, just on top of the tailing piles, that the channel was moved about forty feet from the south side to the north side of the creek, and that the water level was raised about four feet. Mrs. Kell testified that the old channel of the creek was closed with tailings and their ditch spread out over the flat, that the old channel was covered with tailings, that the dredger operated close enough to the ditch to tear some of it down and defendants made no effort to make a substantial ditch but built one of tailings that went down with the first high water, that the banks of the original ditch were solid, and as to the bridge that it was originally a good substantial one, that its original site was buried under tailings and that when it was replaced the sills were not put on bedrock and no bulkheads were built.

There was, therefore, ample evidence to sustain the trial court’s findings of negligence.

In Salstrom v. Orleans Bar Gold Mining Co., 153 Cal. 551, 555 [96 Pac. 292], it was said that no matter how carefully *502 a miner may conduct his mining operations, he has no lawful right to flood or wash away his neighbors’ land, or deposit mining debris thereon to its injury, and that if by the deposit of such debris in the stream he causes such a result, he is liable for the resulting damage; and the fact that he uses all care for his neighbors’ property, consistent with the successful conduct of his mining operations, is immaterial. (With citations.)

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Avalon Pacific-Santa Ana, L.P. v. HD Supply Repair & Remodel, LLC
192 Cal. App. 4th 1183 (California Court of Appeal, 2011)
Armitage v. Decker
218 Cal. App. 3d 887 (California Court of Appeal, 1990)
Heninger v. Dunn
101 Cal. App. 3d 858 (California Court of Appeal, 1980)
Mozzetti v. City of Brisbane
67 Cal. App. 3d 565 (California Court of Appeal, 1977)
Basin Oil Co. v. Baash-Ross Tool Co.
271 P.2d 122 (California Court of Appeal, 1954)
Avery v. Fredericksen and Westbrook
154 P.2d 41 (California Court of Appeal, 1944)
Sager v. O'Connell
153 P.2d 569 (California Court of Appeal, 1944)
Natural Soda Products Co. v. City of Los Angeles
143 P.2d 12 (California Supreme Court, 1943)

Cite This Page — Counsel Stack

Bluebook (online)
127 P.2d 1033, 53 Cal. App. 2d 498, 1942 Cal. App. LEXIS 511, Counsel Stack Legal Research, https://law.counselstack.com/opinion/kell-v-jansen-calctapp-1942.