Keats v. Gas Co.

29 Pa. Super. 480, 1905 Pa. Super. LEXIS 362
CourtSuperior Court of Pennsylvania
DecidedNovember 21, 1905
DocketAppeal, No. 67
StatusPublished
Cited by8 cases

This text of 29 Pa. Super. 480 (Keats v. Gas Co.) is published on Counsel Stack Legal Research, covering Superior Court of Pennsylvania primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Keats v. Gas Co., 29 Pa. Super. 480, 1905 Pa. Super. LEXIS 362 (Pa. Ct. App. 1905).

Opinion

Opinion by

Beavee, J.,

The plaintiff brought her action of trespass against the defendant to recover for damagesto her dwelling house and lot occasioned, as she alleged, by the overflow of a stream across which a dam was formed by the debris carried down the stream against the gas pipe of the defendant which crossed the stream beneath a bridge which spanned it.

The situation is graphically described by a witness of the plaintiff who said, in answer to queries : “ Q. What did you see ? A. I saw an old tree stuck in there against the pipe and against them braces, and a lot of old doors from the Ashley shops and rubbish and briars and everything, right in there tight up against the pipe. Q. Was the water passing under the bridge then or going out the other side above the bridge ? A. Going out the other side. There was a little going through, but not much. Q. How was the creek on the lower side of the bridge with reference to the channel being full or not ? A. It was not overflowing the banks on the lower side of the bridge.”

The jury having found for the plaintiff, the conditions described have been found to have existed and the responsibility of the defendant is thereby established.

We have twenty-one assignments of error, which are discussed under three distinct propositions by the appellant.

1. The first is as to the admission of the testimony of a witness of the plaintiff who testified as to the damages sustained by the plaintiff, based upon the cost of the repairs necessary to [484]*484restore the property to its former condition. The testimony of this witness would of itself have been incompetent, inasmuch as he made the estimate after the repairs had been made and two years from the time of the flood had elapsed. Taken in connection, however, with the testimony of the plaintiff, we think it was competent. The testimony was submitted in connection with that of the plaintiff. The jury could, therefore, first determine whether the testimony of the plaintiff as to the condition of the property after the flood was credible and, assuming it to be true, whether or not the testimony of the witness, based upon information furnished by her, was to be believed. Full opportunity for cross-examination was given and upon a careful examination of the testimony, we can see no error in its admission.

2. In a number of offers, running through various assignments of error, the defendant finally made the following offer: “I propose now to prove by the witness that in 1879 and 1880 this creek was in the same condition as it was in the flood of 1901, as to the height of the banks and the condition generally of the land adjacent to the creek, including the property in dispute; that in those years there were several extraordinary floods ; that no extraordinary flood has been had there since, until the flood in question, and that during those floods in the later seventies and fore part of eighty, the banks overflowed properties along the creek, among them the property in question, and that at the same time there were no obstructions in the way of gas pipe, or anything of that kind, or any bridge to interfere with the natural flow of the water. I propose also to prove by the witness that extraordinary floods were there for the last time in 1880 and that there was no gas pipe or gas main under any of the bridges, and that at that time the banks overflowed and inundated, among others, the property in question.” If the offer had gone a little further and had offered to prove that the property was damaged as well as overflowed or inundated, there could have been no question as to the admissibility of the offer. Even as the offer was made, it may have had some relevancy from some points of view. Why the defendant should have offered the testimony, however, and why the plaintiff should have objected to it is not clearly apparent, the inference being irresistible, if the offer had been made good, [485]*485that, if the stream was unable to vent the water without the bridge and the gas pipe, it would certainly have been impossible for it to have done so with these hindrances in the way so that the flood drift lodged as shown by the plaintiff’s testimony. That, however, is a question for the defendant. In a doubtful case it is better to admit testimony offered that may be competent and relevant from any point of view, and determine later whether or not the testimony meets the requirements of the offer. This is particularly true when offers have been amended a number of times in order to meet objections raised by counsel or by the court in ruling them out. We are of opinion that it would have been wiser to have heard the testimony notwithstanding the fact that the conditions in regard to the bed of the stream had been entirely altered by the erection of the bridge and the suspension by the defendants of a gas pipe six inches in diameter, 3.6 feet above the ordinary level of the water, the distance from the top of the pipe to the lower edge of the girder being 4.4 feet. Whilst no one could say as a matter of fact, what the effect of the flood might have been if the bridge and gas pipe had not been there, the facts as proposed if they had been proved would have enabled the jury to draw some inferences which might have been of use in determining the question at issue. These remarks will apply to offers of a similar character as to the testimony of several other witnesses. We therefore conclude that the offer should have been admitted.

The offer relating to the general character of the flood, as to the amount of rainfall and snow and the condition of temperature existing at the time of the flood, were fairly admissible. It seems to us, therefore, that the sustaining of the objections complained of in the 12th, 13th, 14th, 15th, 16th and 17th assignments of error was erroneous, although as to some of them it appears that the court did not sustain the objections on the ground that the evidence was irrelevant and immaterial, but that the facts stated in the offer had already been shown.

3. The defendant presented several points for charge, all of which were practically affirmed, with the exception of the first and second, the second being : “ Second, The measure of damages to plaintiff’s premises, the injury not being shown to be permanent, is the cost of restoring it to its former condition, [486]*486together with compensation for the loss of its use.” This point was negatived by the court. It is practically admitted by the appellee that it could properly have been affirmed, as containing the proper measure of damages, but it is averred that practically the same rule as to the measure of damages was laid •down in the general charge and that the appellant was not injured, because the point was not read and that, therefore, the jury was not informed in any way as to the character of the ruling. We do not agree with this contention. It is not necessary to argue that the point contained the proper measure of damages, nor is it necessary to cite authorities upon the subject. In his charge the trial judge, in commenting upon the province of the jury, finished the paragraph by saying: “ The cost of remedying the injury to the real and personal property is the true measure of damages.” This is the only reference to the subject which was a vital question and called for specific instructions. Whilst the remark of the trial judge was correct so far as it went, it did not cover the entire subject, nor was it emphasized in such a way as to call the particular attention of the jury to it. The true rule, as laid down in 13 P. & L. Dig. of Dec.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Symons v. Golubic
58 Pa. D. & C.2d 76 (Mercer County Court of Common Pleas, 1972)
Hammermill Paper Co. v. Rust Engineering Co.
243 A.2d 389 (Supreme Court of Pennsylvania, 1968)
Frye v. Pennsylvania Railroad
144 A.2d 475 (Superior Court of Pennsylvania, 1958)
City of Globe v. Rabogliatti
210 P. 685 (Arizona Supreme Court, 1922)
Reisz v. Kansas City Southern R.
88 So. 120 (Supreme Court of Louisiana, 1921)
Sebree v. Huntingdon Water Supply Co.
72 Pa. Super. 553 (Superior Court of Pennsylvania, 1919)
Welliver v. Irondale Electric Light, Heat & Power Co.
38 Pa. Super. 26 (Superior Court of Pennsylvania, 1909)
Engle v. Luzerne County Gas Co.
36 Pa. Super. 311 (Superior Court of Pennsylvania, 1908)

Cite This Page — Counsel Stack

Bluebook (online)
29 Pa. Super. 480, 1905 Pa. Super. LEXIS 362, Counsel Stack Legal Research, https://law.counselstack.com/opinion/keats-v-gas-co-pasuperct-1905.