Kavalaris v. Anthony Bros., Inc.

217 Cal. App. 2d 737, 32 Cal. Rptr. 205, 1963 Cal. App. LEXIS 1959
CourtCalifornia Court of Appeal
DecidedJune 28, 1963
DocketCiv. 26818
StatusPublished
Cited by4 cases

This text of 217 Cal. App. 2d 737 (Kavalaris v. Anthony Bros., Inc.) is published on Counsel Stack Legal Research, covering California Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Kavalaris v. Anthony Bros., Inc., 217 Cal. App. 2d 737, 32 Cal. Rptr. 205, 1963 Cal. App. LEXIS 1959 (Cal. Ct. App. 1963).

Opinion

ASHBURN, J.

Plaintiff Harold C. Kavalaris sued appellant Anthony Bros., Inc., for negligent breach of contract to construct for him a swimming pool in his residence property. A few months after its completion the pool settled and cracked and leaked and had to be repaired and reconstructed to such an extent that the court awarded plaintiff damages in the sum of $7,847.33. Defendant appeals.

Its main contention, variously phrased, is that the evidence is insufficient to sustain the court’s findings of negligent breach of contract on defendant’s part. There is considerable conflict in the evidence but the uncontradicted evidence plus the portions of the conflicting proofs which are favorable to plaintiff’s case and which must be accepted by the reviewing court as true (New v. New, 148 Cal.App.2d 372, 383 [306 P.2d 987]) are now found to be sufficient to sustain the findings and judgment.

The pool was built in filled ground which was not adequately compacted, 90 per cent or better being the standard recognized by counsel for both sides of this ease. Plaintiff called as a witness Mr. Clifford M. Hall, who was held by the court to be qualified to testify as an expert. Defendant produced Mr. Charles Mackintosh, who was stipulated to be a qualified expert.

Mr. Hall testified that the pool failed because, as he found when reconstructing it, the reinforcing steel rods which should have been covered completely with gunite (concrete) were in places lying on the ground with the gunite above them; that this was not good practice; that such condition has a tendency to crack the pool; that the concrete would be so weak without the reinforcing steel it could not hold the pressure of the water when the pool was filled; that if the steel were reinforcing the gunite the pool would not have cracked.

Mr. Mackintosh rejected this explanation of the damage to *740 the pool and said that the fill was not properly compacted, the ground had shifted and the cracks in the pool were caused by the ground movement; that the failure of the pool would not have occurred had the soil been compacted to the extent of 90 per cent or better. It is not accurate to say, as do counsel for appellant, that Mr. Mackintosh’s testimony was uncontradieted. It was definitely in conflict with that of Mr. Hall upon the vital issue of the cause of the failure of the pool.

The testimony of both of these witnesses leaves plaintiff with a pool constructed in filled ground by defendant in a manner not adequate to resist the stresses and strains of loosely compacted soil. Mr. Mackintosh said that if called upon to build a pool in a loosely filled ground “the two recommendations that we make under such eases, one, either take the fill out and compact it, which is cheaper if there is available access and a place to pile the dirt; or if that is not possible or not economical, to use caissons. Q. Caissons down to the firm soil? A. Firm soil,” and that caissons require heavier reinforcing rods and thicker gunite.

The parties contracted upon the basis of knowledge that the pool was to be built in filled ground. On the written contract there appear in the upper left corner and in the handwriting of Mr. L. Root, who negotiated and prepared the contract as defendant's agent, the words ‘1 Compaction report is with this contract—no extra charge for fill ground.” This, of course, negatived the printed statement on the back of the contract saying: “6. The contract price is based upon the following mutual assumption of facts: (a) That the site is not fill ground, contains no rock formation or boulders and adequate bearing capacity.” Mr. Mackintosh, before testifying, had examined a Smith-Emery Company report of October 31, 1955, upon field compaction tests made by it which showed 92.1 per cent compaction at one test site and 91.6 per cent at the only other one—probably the report mentioned in the contract. He said that the locations of the only two tests were outside the area of the pool and in that of the garage. One of them, No. 2, was 18 feet from the north edge of the pool.

Mr. Root testified that on his first visit to plaintiff’s property he looked over the proposed site, noticed where the garage was. built, walked out to the edge of the slope and looked down; that he was informed that it was all fill in there; that Kavalaris had pointed out the area.where be wanted the *741 pool and said it was on a fill. He, Boot, had asked for a compaction report “so that our engineering can check it.” The specifications, which were drawn by defendant, contain references to filled ground: “Fill ground—compaction report from Smith-Emerey Testing Lab.” Bespondent’s brief says: “It is further undisputed that the compaction report so furnished, did not have a test drilling indicated for any of the area on which the swimming pool was to be constructed, ’ ’ and appellant does not take issue with this statement. The contract provides as a part of its “General Terms and Conditions”: “1. Contractor guarantees the work performed by it against defects in material and workmanship for the period of one year from the date pool is plastered. ...”

The court was warranted in holding that plaintiff did not make any representation that the Smith-Emery report covered the pool area or that it was correct; on the contrary the judge was justified in impliedly holding that the report was furnished for what it was worth and accepted as such, With no further inquiry on the subject of the nature or extent of the fill or its compaction defendant proceeded with construction of the pool and failed to conform to normal and careful standards, whether the criterion stated by Hall or Mackintosh be applied to the work.

Defendant’s plan for the pool says: “(1) Contractor shall verify all dimensions & conditions on job.” This is but a recognition of a duty imposed upon defendant by applicable law, as is attested by Firemen’s Ins. Co. v. Indermill, 182 Cal.App.2d 339, 341 [6 Cal.Rptr. 469] : “Defendants were under a duty to use reasonable care in the construction of the building. This duty included a reasonable examination of the soil condition where the excavations were to be made for the caissons, and reasonable inspection of the holes after the excavation had been made, in order to determine whether or not they had gone through the filled-ground and had penetrated the load-bearing ground for the required depth. (See Dow v. Holly Mfg. Co., 49 Cal.2d 720 [321 P.2d 736].) The evidence establishes that the foundation caissons were constructed in a defective and insufficient manner and created a condition which caused the building to settle; that the defendants did not reasonably test the condition of the soil, nor inspect the holes for the caissons, nor attempt to determine whether the caissons were placed on proper load-bearing ground. Their negligence in these respects was clearly the proximate cause of the damage to the building.”

*742

Free access — add to your briefcase to read the full text and ask questions with AI

Related

George B. Gilmore Co. v. Garrett
582 So. 2d 387 (Mississippi Supreme Court, 1991)
Evans v. Warwick
252 N.E.2d 328 (Lima Municipal Court, 1969)
City of Salinas v. Souza & McCue Construction Co.
424 P.2d 921 (California Supreme Court, 1967)

Cite This Page — Counsel Stack

Bluebook (online)
217 Cal. App. 2d 737, 32 Cal. Rptr. 205, 1963 Cal. App. LEXIS 1959, Counsel Stack Legal Research, https://law.counselstack.com/opinion/kavalaris-v-anthony-bros-inc-calctapp-1963.