Johnson v. M. J. O'neil, Inc.

234 N.W. 16, 182 Minn. 232, 1931 Minn. LEXIS 1139
CourtSupreme Court of Minnesota
DecidedJanuary 2, 1931
DocketNo. 28,226.
StatusPublished
Cited by8 cases

This text of 234 N.W. 16 (Johnson v. M. J. O'neil, Inc.) is published on Counsel Stack Legal Research, covering Supreme Court of Minnesota primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Johnson v. M. J. O'neil, Inc., 234 N.W. 16, 182 Minn. 232, 1931 Minn. LEXIS 1139 (Mich. 1931).

Opinion

Olsen, J.

Defendant appeals from an order denying its alternative motion for judgment or a new trial.

Defendant had the contract for furnishing, installing and erecting all piping, wiring, and auxiliary equipment, together with all labor and material required, for the construction of a complete boiler plant for the municipal power plant at Austin, Minnesota. *233 A new building had been or was being constructed joining an older power plant building. Plans and specifications for the work to be done and materials and equipment to be furnished had been prepared by Toltz, King & Day, architects and engineers. Defendant sublet to or employed plaintiffs, doing business as Electric Supply & Construction Company, to furnish and install the electric appliances and wiring. The contract entered into between the plaintiffs and the defendant is to be found from the offer by plaintiffs and defendant’s qualified acceptance thereof, contained in plaintiffs’ letter of April 14, 1928, being exhibit A in the evidence, and defendant’s answer thereto of April 20, being exhibit B in the evidence, together with the plans and specifications therein referred to and the conduct of the parties thereafter in reference to the work to be done. The two letters mentioned read as follows:

EXHIBIT A
“April 14th, 1928.
“M. J. O’Neil Co.,
“608 Exchange Bank Building,
“St. Paul, Minn.
“Gentlemen:
“We are please to quote on the electrical installation and wiring for the Municipal Power Plant at Austin, Minnesota, as per plans and specifications by Toltz, King & Day, engineers, for the sum of five thousand two hundred sixty dollars ($5,260.00).
“We are figuring the high tension feeders to the wall of transformer room. The plans do not show the distance required beyond this wall and we have been unable to get the information from the engineers. It will be necessary to obtain this information at the Power House.
“Very truly yours,
“Electric Supply & Construction Co.”
*234 EXHIBIT B
“Api. 20, 1928.
“Electric Supply & Constr. Co.
“St. Paul.
“We accept your quotation of $5,260.00 Five Thousand Two Hundred and Sixty Dollars—Same to- cover the Electrical Wiring installation in the Municipal Power Plant at Austin, Minnesota—■ complete—as per the plans and specifications prepared for same by Toltz, King & Day, Architects and Engineers.
“M. J. O’Neil, Inc.,
“Per E. J. Gorman.”

The specifications stated that: “Contractor shall provide power feeders from auxiliary switching structures to present 2,300 volt bus,” and specified the material to be used. They did not specify the length of wire or conduit. This wiring is the high tension feeders referred to in plaintiffs’ letter. The. specifications, which the plaintiffs were furnished and had, further provide:

“The contractor shall fully acquaint himself with the conditions of the site where this work is to be done, and with the' local conditions surrounding same. He shall assume full responsibility for any expense to him which may arise from these conditions.”

After receipt of defendant’s letter of April 20, the plaintiffs, without further negotiations or communication with defendant, proceeded to perform the work and furnish and install the wiring and electrical appliances, including the high tension or feeder wires and conduit from switching structure or panel in the new building to the 2,300 volt bus in the older building. The 2,300 volt bus was located in a room in the basement of the old power house building but immediately adjoining the room in the new building where the new switching structure was located. Plaintiffs contend now that the furnishing and installing of the feeder wires and conduit beyond the wall of the new building was an extra expense not included in their contract, for which they are entitled to extra pay. The jury *235 awarded to plaintiffs $157.01 on this claim. The only question here presented is upon this item.

Plaintiffs’ letter of April 14 showed that in making their bid they had figured the high tension feeders only to the wall of the transformer room in the hew building. The defendant had the right to accept or reject the offer, or to accept it conditionally or with qualifications. If conditions or qualifications were annexed to the acceptance, no contract resulted unless and until plaintiffs acquiesced in or accepted the conditions or qualifications. Kileen v. Kennedy, 90 Minn. 414, 97 N. W. 126; Bastian Bros. Co. v. Wemott-Howard Co. 113 Minn. 196, 129 N. W. 369; Lowry C. Co. v. Andresen-Ryan C. Co. 153 Minn. 498, 190 N. W. 985; West v. First Nat. Bank, 165 Minn. 143, 205 N. W. 949; Brearley v. Schoening, 168 Minn. 447, 210 N. W. 588; M. & St. L. Ry. Co. v. Columbus Rolling Mill, 119 U. S. 149, 7 S. Ct. 168, 30 L. ed. 376.

The defendant accepted plaintiffs’ offer to do the electric wiring and installation for the sum of $5,260, with the condition that it covered the electric wiring and installation complete as per plans and specifications prepared by the architects and engineers, which plans and specifications plaintiffs had been furnished. This condition was clear and specific. It was not ambiguous. The wiring here in question was clearly required by the specifications. It was then up to plaintiffs to accept or reject the condition or counter proposal made by defendant. By then promptly going ahead with and completing the work without objection the plaintiffs acquiesced in and consented to the new condition. Defendant’s conditional acceptance amounted to a new offer on its part to pay plaintiffs $5,260 for furnishing and installing the electric wiring and appliances complete as required by the specifications. It falls within the general rule that where one to whom an offer is made goes ahead and performs in accordance with the offer his act is an acceptance. Union Bank v. Shea, 57 Minn. 180, 58 N. W. 985; Midland Nat. Bank v. Security Elev. Co. 161 Minn. 30, 200 N. W. 851; Hankins v. Young, 174 Iowa, 383, 156 N. W. 380; Mfrs. & M. Inspection Bureau v. Everwear Hosiery Co. 152 Wis. 73, 138 N. W. 624, 42 L.R.A.(N.S.) *236 847, Ann. Cas. 1914C, 449; 13 C. J. p. 275, § 73, and note 72; 6 R. C. L. p. 600, § 22, and note 12.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Minnesota Supply Co. v. Raymond Corp.
472 F.3d 524 (Eighth Circuit, 2006)
Minnesota Supply Company v. The Raymond Corporation
472 F.3d 524 (Eighth Circuit, 2006)
Griggs v. Oak
82 N.W.2d 410 (Nebraska Supreme Court, 1957)
Nelson v. the Swedish Hospital
64 N.W.2d 38 (Supreme Court of Minnesota, 1954)
Podany v. Erickson
49 N.W.2d 193 (Supreme Court of Minnesota, 1951)
Henry Simons Lumber Co. v. Simons
44 N.W.2d 726 (Supreme Court of Minnesota, 1950)
Farmers State Bank v. Sig Ellingson & Co.
16 N.W.2d 319 (Supreme Court of Minnesota, 1944)
M. Samuels & Co. v. Zorbas
234 N.W. 468 (Supreme Court of Minnesota, 1931)

Cite This Page — Counsel Stack

Bluebook (online)
234 N.W. 16, 182 Minn. 232, 1931 Minn. LEXIS 1139, Counsel Stack Legal Research, https://law.counselstack.com/opinion/johnson-v-m-j-oneil-inc-minn-1931.