*483 LENT, J.

Plaintiff brought this action at law to recover damages for defective lumber sold to it by the defendant. 'Hie case was tried to the court and resulted in a judgment in favor of the plaintiff for $4,662.15 in compensatory damages. The defendant on appeal challenges the amount of damages. We affirm.

Two issues are raised on appeal. The first is whether there is sufficient evidence to support the trial court’s findings on the issue of damages. The second is whether the plaintiff was precluded from recovering the incidental damages claimed for failure to plead them specially.

The following facts are undisputed. Plaintiff, a lumber brokerage firm, purchased 103,092 board feet of mixed ponderosa and sugar pine lumber from defendant, a manufacturer of lumber, and resold the lumber to Klamath Molding Mill, Inc. (Klamath), a molding remanufacturing company. Representatives of Klamath, who picked up the shipment at the defendant’s plant, inspected the lumber for grade and moisture content and found it to be within the appropriate standards. The lumber was then ripsawed into various widths and sent through a cutoff saw, where knots and other apparent and naturally occurring defects were cut out. The short pieces were then put through a "finger-jointer” to make boards of uniform length. These boards were then stored until they were needed for reprocessing to fill a particular order.

When the first order requiring this particular type of lumber was run, the quantity needed to fill the order was pulled from storage, resawed center, fed through a planer or molder, then inspected for defects. After approximately ten percent of the finger-jointed lumber was run through the molding process, it was discovered that a significant percentage of the lumber evidenced cracks or checking along the resawed surface. Interior checking of this type cannot be discovered at the initial inspection of the lumber or at *484 any point prior to completion of the planing process. Only after the surface has been finished by the molder are these cracks detectable.

When Klamath discovered the defects, it called the plaintiffs representative, who in turn called the defendant to send representatives to the Klamath plant to inspect the lumber. The defendant’s general manager, Donald Johnson, went with his mill manager and salesman to Klamath’s plant and met there with Jay Robbins, Klamath’s president. Robbins showed Johnson and his associates the defective lumber, and all agreed that the cracking was caused by improper kiln drying by the defendant. When lumber is kiln dried too rapidly, as this lumber was, the moisture on the inside cannot escape and, in effect, explodes, causing internal cracks.

Robbins first asked Johnson to take the lumber back, but the two men finally agreed to an arrangement more satisfactory to the defendant. Klamath would process the lumber in a manner which would yield maximum recovery, would tally the unsalvageable lumber, and would withhold payment accordingly-

At trial, additional terms of this agreement were in dispute. Defendant contended that Klamath agreed to store all the defective lumber at its plant, so that defendant could inspect and tally the amount before settlement. The trial court found that while Klamath did agree to salvage as much of the nondefective lumber as possible, it did not agree to set aside and store all the defective lumber for the defendant’s inspection.

For the purposes of this appeal, the defendant accepts the trial court’s finding as to the terms of the agreement, but contends that the award of damages was not supported by the evidence. The trial court found that the plaintiff had proved damages of $4,662.15, the exact amount prayed for in plaintiff’s complaint.

*485 Findings of fact of a law court are just as binding on us as a jury verdict. ORS 17.435; Hendrix v. McKee, 281 Or 123, 126, 575 P2d 134 (1978). The scope of our review is limited by Article VII (Amended), § 3, of the Oregon Constitution, which states that "* * * no fact tried by a jury shall be otherwise re-examined in any court of this state, unless the court can affirmatively say that there is no evidence to support the verdict.” See Shepler v. Weyerhaeuser Company, 279 Or 477, 484, 569 P2d 1040 (1977), cert den 98 S Ct 903 (1978). Thus, if there is any evidence to support the trial court’s award, we must affirm it.

Defendant’s argument of insufficient evidence is based on the manner in which plaintiff attempted to establish a foundation for the amount of damages prayed for in the complaint at trial. The factual background appears to be as follows:

After approximately 65 to 70 percent of the lumber had been processed through the molder, because one of plaintiff’s key employes was leaving the company, plaintiff asked to settle the account with Klamath, since Klamath had estimated it could take up to two years to completely process all of the shipment in question by filling orders as required. Robbins, Klamath’s president, testified that Klamath had kept a running inventory of the unsalvageable lumber up to this point and applied the average percentage of unsalvageable material to the yet unprocessed material to come up with the figure of 11,008 board feet of total unsalvageable lumber. Klamath then took the average cost of all the material, increased by $10 per thousand board feet for shipping costs, and applied it to the total amount of defective lumber. To this product Klamath added $60 per 1,000 board feet for the cost of manufacturing through the molding process of the defective lumber and withheld the total amount, $4,662.15, from its payment to the plaintiff.

At trial, Robbins was cross-examined as to the manner and result of the tallies of the unsalvageable *486 defective lumber. There appear to have been seven or eight separate tallies. Robbins discovered that he had inadvertently left three or four of the "tally slips” at his plant, but testified that he could recall what the final tally was. At the close of defendant’s cross-examination of Robbins, defense counsel moved to strike the testimony of Robbins relating to damages in excess of that represented by records produced at trial on the basis that such testimony was either hearsay or not based on the witness’ firsthand knowledge. The court denied the motion. Defendant has not assigned as error the trial court’s denial of his motion. 1 Instead, defendant appears to contend that the testimony of this witness to facts represented by the missing tally sheets must be excluded upon this court’s appellate review because it is not the best evidence of those facts. Having failed to make this "best evidence” *487 objection at trial, however, defendant is precluded from raising it on appeal. 2 McEwen v. Ortho Pharmaceutical, 270 Or 375, 421, 528 P2d 522 (1974); Cox v. Ohio National Life Insurance Company,

Free access — add to your briefcase to read the full text and ask questions with AI

Related

State Farm Fire and Casualty Co. v. American Family Mutual Ins. Co.
253 P.3d 65 (Court of Appeals of Oregon, 2011)
Steele v. Mayoral
220 P.3d 761 (Court of Appeals of Oregon, 2009)
GPL Treatment, Ltd. v. Louisiana-Pacific Corp.
894 P.2d 470 (Court of Appeals of Oregon, 1995)
Zehr v. Haugen
871 P.2d 1006 (Oregon Supreme Court, 1994)
Bruer's Contract Cutting v. National Council On Compensation Insurance
841 P.2d 690 (Court of Appeals of Oregon, 1992)
Rennick v. Jackson & Coker
767 P.2d 478 (Court of Appeals of Oregon, 1989)
VonRavensberg v. Houck-Carrow Corp.
653 P.2d 1297 (Court of Appeals of Oregon, 1982)

Cite This Page — Counsel Stack

Bluebook (online)
579 P.2d 235, 282 Or. 481, 1978 Ore. LEXIS 920, Counsel Stack Legal Research, https://law.counselstack.com/opinion/husky-lumber-co-v-d-r-johnson-lumber-co-or-1978.