Hamm v. South Carolina Public Service Commission

422 S.E.2d 110, 309 S.C. 282, 1992 S.C. LEXIS 186
Supreme Court of South Carolina·Decided August 31, 1992·No. 23705·Published·Cited by 11 cases

Opinion

Toal, Justice:

This consolidated appeal arises from several rate orders of the South Carolina Public Service Commission (“Commission”) granting certain relief to South Carolina Electric and Gas (“SCE&G”). We affirm in part, reverse in part, and remand.

1987 CASE

Rerating Issue

In 1983, SCE&G applied for a change in its rate structure to add the V.C. Summer Nuclear Station, into its rate base. 1 The Commission excluded 400 megawatts (“MW”) or $114,770,512 of the investment in the V.C. Summer Plant from SCE&G’s rate base. The Commission did not find that the capacity represented by the 400 MW was not used or useful but excluded this portion of the investment as part of a “phase-in” of the new plant. The Commission ordered the carrying cost of the 400 MW deferred. The entire depreciation expense of the V.C. Summer Plant was allowed. This order was affirmed by this Court in Hamm v. South Carolina Public Service Commission and South Carolina Electric and Gas, 294 S.C. 320, 364 S.E. (2d) 455 (1988). In 1987, SCE&G sought the inclusion of the 400 MW into their rate base (less depreciation) and the amortization of the previously-deferred carrying cost over a ten-year period. This action was accompanied by a proposed new depreciation rate which decreased SCE&G’s depreciation expense. The net result was no increase in the consumer rates. The Commission approved SCE&G’s requests. In so doing, the Commission noted there had been a system-wide rerating of SCE&G’s generating units with a net decrease in *286 total capacity of 69 MW. The Commission found this rerating to be immaterial. In Hamm v. South Carolina Public Service Commission and South Carolina Electric and Gas, 298 S.C. 309, 380 S.E. (2d) 428 (1989), we vacated the Commission’s order and remanded the case for further findings of fact under Able Communication v. South Carolina Public Service Commission, 290 S.C. 409, 351 S.E. (2d) 151 (1986) on the issue of whether operational imprudence was reflected in those re-ratings. The Commission’s order on remand is at issue in this appeal.

The Commission’s order on remand made the specific factual finding that the rerating was the result of normal operating and engineering constraints. Further, the Commission found no evidence of operational imprudence resulting in the rerating. Although the burden of proof of the reasonableness of all costs incurred which enter into a rate increase request rests with the utility, the utility’s expenses are presumed to be reasonable and incurred in good faith. Missouri ex rel. Southwestern Bell Co. v. Public Service Comm’n of Missouri, 262 U.S. 276, 43 S.Ct. 544, 67 L.Ed. 981(1923) (Brandis, Jr., J., concurring); West Ohio Co. v. Pub. Util. Comm’n, 294 U.S. 63, 55 S.Ct. 316, 79 L.Ed. 761 (1935); Boise Water Corp. v. Idaho Pub Util. Comm’n, 97 Idaho 832, 555 P. (2d) 163 (1976); City of Chicago v. Illinois Commerce Comm’n, 133 Ill. App. 3d 435, 88 Ill. Dec. 643, 478 N.E. (2d) 1369 (1985) (modified by statute as noted in People ex rel. Hartigan v. Illinois, 117 Ill. (2d) 120, 109 Ill. Dec. 797, 510 N.E. (2d) 865 (1987); Long Island Lighting Co. v. Pub. Serv. Comm’n, 134 A.D. (2d) 135, 523 N.Y.S. (2d) 615 (1987); City of Norfolk v. Chesapeake & Potomac Tel. Co., 192 Va. 292, 64 S.E. (2d) 772 (1951). This presumption does not shift the burden of persuasion but shifts the burden of production on to the Commission or other contesting party to demonstrate a tenable basis for raising the specter of imprudence. Long Island, supra. This evidence may be provided by the Consumer Advocate as an intervenor through the liberal discovery provision provided for in S.C. Code Ann. § 37-6-605 (Supp. 1991) or through the Commission’s broad investigatory powers. S.C. Code Ann. § 58-3-190 (1976) and § 58-27-1960 (1976). The ultimate burden of showing every reasonable effort to minimize fuel costs remains on the utility. Hamm v. South Carolina *287 Pub Serv. Comm’n and Carolina Power and Light Co., 291 S.C. 119, 352 S.E. (2d) 476 (1987).

In this case, there was no direct evidence of imprudence. The Commission found the rerating itself did not suggest imprudence but was the result of normal operating and engineering constraints. The Commission sits as the trier of facts, akin to a jury of experts. South Carolina Tel. & Tel. Co. v. Pub. Serv. Comm’n, 270 S.C. 590, at 597, 244 S.E. (2d) 278, at 282 (1978). This Court is without authority to set aside an agency’s judgment on a factual issue where there is substantial evidence of record to support the agency’s decision. Hamm v. South Carolina Pub. Serv. Comm’n, 294 S.C. 320, 364 S.E. (2d) 455 (1988). We, therefore, affirm the Commission’s inclusion of the 400 MW previously withheld from SCE&G’s base rate.

1989 RATE INCREASE CASE

In 1989, SCE&G sought a rate increase. The Consumer Advocate intervened. The Commission granted SCE&G relief. The Commission’s decision on several issues relating to the increase was appealed to the Circuit Court. The Circuit Court affirmed the Commission and the Consumer Advocate now appeals to this Court.

Rate of Return

The Commission found 13.25% is a fair rate of return on SCE&G’s common equity. The Consumer Advocate argues that the Commission’s conclusion is not supported by substantial evidence in the record. We agree.

Four experts testified on this issue. All four experts principally relied on the discounted cash flow (“DCF”) methodology. According to this method, the proper rate of return is determined by adding to the common stock’s current yield a rate of increase or growth rate which investors will expect to occur over time. All four experts relied on this method. Their opinions, however, on the proper rate of return differed. The expert opinion as to the proper growth rate varied between 3.5% and 5.0%. The expert witness of the Consumer Advocate opined the appropriate cost of equity would be 12.75%. The expert for the Department of the Navy opined the proper rate ranged between 11.92% and 12.42%.

*288 Dr. Rhyne testified for the Commission staff. In his prefiled testimony, he gave a broad acceptable range of 12.25% to 13.25%, excluding issuance costs. At the hearing, Dr. Rhyne testified, upon updated information, in his opinion, the best point estimate fell between 12.5% and 13.0%.

Dr. Olson, who testified for SCE&G, applied the DCF method and arrived at a range of 12.39% to 12.89%. He then adjusted this figure by applying a financing costs adjustment and an adjustment for “market breaks” by adding 8%. This resulted in a range of 13.4% to 13.9%. In his prefiled testimony, he opined SCE&G’s return on equity should be set at 13.25% to 13.75%. At the hearing, he modified his opinion upward to 14.0%.

Free access — add to your briefcase to read the full text and ask questions with AI

Hamm v. South Carolina Public Service Commission, 422 S.E.2d 110, 309 S.C. 282, 1992 S.C. LEXIS 186 (S.C. 1992).

422 S.E.2d 110 (Hamm v. South Carolina Public Service Commission) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Duke Energy Carolinas v. SC Office of Regulatory Staff
Supreme Court of South Carolina, 2021
Kiawah Property Owners Group v. Public Service Commission
525 S.E.2d 863 (Supreme Court of South Carolina, 1999)
Porter v. SC PUBLIC SERVICE COM'N
507 S.E.2d 328 (Supreme Court of South Carolina, 1998)
South Carolina Energy Users Committee v. Public Service Commission
505 S.E.2d 342 (Supreme Court of South Carolina, 1998)
Heater of Seabrook Inc. v. Public Service Commission
503 S.E.2d 739 (Supreme Court of South Carolina, 1998)
Porter v. South Carolina Public Service Commission
493 S.E.2d 92 (Supreme Court of South Carolina, 1997)
Hilton Head Plantation Utilities, Inc. v. Public Service Commission
441 S.E.2d 321 (Supreme Court of South Carolina, 1994)