Grixi Mendez v. Anadarko Petroleum Corp.

466 F. App'x 316
CourtCourt of Appeals for the Fifth Circuit
DecidedMarch 27, 2012
Docket11-20047
StatusUnpublished
Cited by16 cases

This text of 466 F. App'x 316 (Grixi Mendez v. Anadarko Petroleum Corp.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Grixi Mendez v. Anadarko Petroleum Corp., 466 F. App'x 316 (5th Cir. 2012).

Opinion

PER CURIAM: *

Grixi Mendez appeals the district court’s orders denying his motion to remand and granting summary judgment to his employer, Anadarko Petroleum Corporation (“Anadarko”), on his Jones Act claim, 46 U.S.C. § 30104. We affirm the district court’s rulings because the spar upon which Mendez was working when he was injured was not a Jones Act vessel, meaning there is no possibility that Mendez can establish that he was a seaman for purposes of Jones Act liability.

*317 I.

Mendez, an Anadarko employee, was injured while working on the RED HAWK spar. The RED HAWK is a floating gas-production platform moored in ocean water 5,000 feet deep approximately 210 miles from Sabine Pass, Texas. Spars float on the ocean’s surface, but are moored to large anchors in the seabed below. The RED HAWK has been moored in Red Hawk Field at Garden Banks blocks 876 and 877 since 2004. The RED HAWK spar is secured to the ocean floor by a series of six single-point anchor moorings, which extend in a spread platform from the spar’s hull. Each mooring is comprised of a chain and polyester line 78 feet long. Each line is anchored to the sea floor with a suction embedment anchor that is approximately 18 feet in diameter. The mooring lines are permanently taut so that the RED HAWK spar cannot move laterally. In addition to these mooring lines, an underwater infrastructure of flow lines and export pipeline systems, as well as umbilicals extending from the spar to the subsea wellheads, used to transport oil and gas to shore-based facilities attach the spar to the ocean floor. A pipeline extends from the spar to the Pelican Gas Plant in Patterson, Louisiana, by way of the VR-397 platform. The gas comes from the wellheads on the sea floor, up through the flow lines, then to the platform. Once on the platform, a separator takes the liquids out, and the gas flows to shore through a sixteen-inch steel pipeline.

Anadarko intended the RED HAWK spar to remain in place for the productive life of the field, which it anticipated would be several years. Production began on July 19, 2004. The field, however, proved less productive than Anadarko expected it to be. After four years, on August 17, 2008, Anadarko stopped extracting from the Red Hawk field. The spar has not, however, been moved, and Anadarko has no plans to move it.

Anadarko commissioned a study of the feasibility of having the spar moved to another field approximately 100 miles away. The study concluded that doing so would take approximately 50 days and cost over $42 million. The actual movement of the spar would take only 2 to 4 of those 50 days; the greatest time and difficulty were presented by preparing to move it and modifying it to anchor in the new location. Only the spar itself would be moved; the mooring system, and the risers and umbilicals, would all have to be severed or disconnected. The mooring system would either be disposed of or left in place. Anadarko would have to build a new mooring system at the new location if it decided to have the spar moved. There are no plans to do so.

Some of the spar’s features, including “tow bollards,” and the shape of its hull, could facilitate movement from one offshore location to another, but the work and expense needed to unmoor it, prepare it for transportation, and to reattach it to a new location, make that difficult and expensive. As a result, the spar was designed to remain permanently moored to the seabed and stationary for the life of the oil and gas production field. Employees on the RED HAWK spar must perform periodic evacuation drills under Coast Guard rules, and the Coast Guard classifies the spar as an “industrial vessel.” These features are, however, consistent with a fixed structure permanently moored far offshore, not merely with vessel status. The Coast Guard’s Certificate of Inspection (“COI”) also states that the spar is “considered a floating facility with passive ballast systems.” The COI states that the RED HAWK is not permitted to carry passengers and notes under the “Route Permitted and Conditions of Operations” section that the spar is “[l]imited to the *318 Gulf of Mexico-Garden Banks Block 876, not on international voyage. The unit is a floating production system of the cell spar design using a synthetic line mooring system, and is considered a floating facility with passive ballast systems.”

Mendez brought his Jones Act claim in state court. Anadarko removed the suit to the District Court for the Southern District of Texas, claiming federal jurisdiction under the Outer Continental Shelf Lands Act, 43 U.S.C. § 1331, et seq., and arguing that the Jones Act claim did not prevent removal because Mendez did not qualify as a seaman. Mendez filed a motion to remand, which the district court denied after concluding that Mendez could not possibly establish his status as a seaman. The district court then granted Anadarko’s motion for summary judgment on the same ground and entered final judgment in favor of Anadarko.

II.

Mendez argues that the district court erred in refusing to remand this action to state court and in granting summary judgment to Anadarko. We review both a denial of a motion to remand and the grant of summary judgment de novo. Holmes v. Atl. Sounding Co., 437 F.3d 441, 445 (5th Cir.2006).

When a plaintiff brings a Jones Act case, the defendant generally cannot remove the case to federal court. Id. If a Jones Act claim is fraudulently pleaded, though, it is removable. Id. “[A] district court ... may use a 'summary judgment-like procedure’ to dispose of the assertion that the Jones Act claim was fraudulently pleaded.” Id. (quoting Burchett v. Cargill, Inc., 48 F.3d 173, 175 (5th Cir.1995)). “The court may deny remand where, but only where, resolving all disputed facts and ambiguities in current substantive law in the plaintiffs favor, the court determines that the plaintiff has no reasonable possibility of establishing a Jones Act claim on the merits.” Id.

The issue on appeal is whether Mendez could possibly establish that he was a Jones Act seaman. To qualify as a seaman under the Jones Act, a plaintiff must demonstrate, among other things, that he has “a connection to a vessel in navigation (or an identifiable group of such vessels) that is substantial in terms of both its duration and its nature.” Id. at 357 (internal quotation marks and alteration omitted). The district court determined that Mendez could not establish a connection to a vessel in navigation because the RED HAWK is not a vessel in navigation as the Supreme Court has defined that term. We held that a spar almost identical to the RED HAWK was not a vessel in Fields v. Pool Offshore, 182 F.3d 353 (5th Cir.1999). We therefore agree with the district court’s conclusion.

The Supreme Court defined the term “vessel” for Jones Act purposes in Stewart v. Dutra Construction Co.,

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Sanchez v. Enter. Offshore Drilling LLC
376 F. Supp. 3d 726 (S.D. Texas, 2019)
Ross v. W&T Offshore, Inc.
357 F. Supp. 3d 554 (E.D. Louisiana, 2018)
Cardoso-Gonzalez v. Anadarko Petroleum Corp.
326 F. Supp. 3d 273 (E.D. Louisiana, 2018)
James Hefren v. Murphy Expl & Prodn Co., USA, et a
820 F.3d 767 (Fifth Circuit, 2016)
BW Offshore USA, LLC v. TVT Offshore
145 F. Supp. 3d 658 (E.D. Louisiana, 2015)
Armand v. Terral River Service, Inc.
158 So. 3d 61 (Louisiana Court of Appeal, 2014)
Hefren v. Murphy Exploration & Prod. Co., USA
14 F. Supp. 3d 746 (W.D. Louisiana, 2014)
Warrior Energy Services Corp. v. ATP Titan M/V
551 F. App'x 749 (Fifth Circuit, 2014)
Riley v. Alexander/Ryan Marine Services Co.
983 F. Supp. 2d 884 (S.D. Texas, 2013)
Warrior Energy Services Corp. v. ATP Titan
941 F. Supp. 2d 699 (E.D. Louisiana, 2013)
Baricuatro v. Industrial Personnel & Management Services, Inc.
927 F. Supp. 2d 348 (E.D. Louisiana, 2013)

Cite This Page — Counsel Stack

Bluebook (online)
466 F. App'x 316, Counsel Stack Legal Research, https://law.counselstack.com/opinion/grixi-mendez-v-anadarko-petroleum-corp-ca5-2012.