Green Construction Co. v. Williams Form Engineering Corp.

506 F. Supp. 173, 1980 U.S. Dist. LEXIS 9609
CourtDistrict Court, W.D. Michigan
DecidedSeptember 10, 1980
DocketG75-248 CA1
StatusPublished
Cited by7 cases

This text of 506 F. Supp. 173 (Green Construction Co. v. Williams Form Engineering Corp.) is published on Counsel Stack Legal Research, covering District Court, W.D. Michigan primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Green Construction Co. v. Williams Form Engineering Corp., 506 F. Supp. 173, 1980 U.S. Dist. LEXIS 9609 (W.D. Mich. 1980).

Opinion

OPINION

DOUGLAS W. HILLMAN, District Judge.

This is a products liability action, founded in diversity, for damages sustained in 1972 when grout manufactured and sold by defendants allegedly deteriorated after use on a government construction project in Alaska. Plaintiffs Green Construction Company, Hoak Construction Company, and a joint venture, Green Construction Company-Hoak Construction Company (hereinafter Green-Hoak), were awarded a contract by the U. S. Army Corps of Engineers for the construction of transmission towers along a line extending from Juneau, Alaska, to the Snettisham Hydro Electric Station, approximately 28 miles southeast of Juneau. This contract was known as the Snettisham Project. In constructing the towers, Green-Hoak used Wil-Kwik-Set grout, a product manufactured by defendant Gibralter Cement Products, Inc. (Gibralter) and sold by Williams Form Engineering Corporation (Williams Form). Wil-Kwik-Set allegedly was defective and the Corps of Engineers ordered Green-Hoak to replace the product and make repairs, which the contractors did. Plaintiffs filed suit against Williams Form and Gibralter in 1975 and Williams Form in turn impleaded the United States of America as third-party defendant in 1978, seeking indemnity or contribution under the Federal Tort Claims Act (FTCA), 28 U.S.C. §§ 1346(b), 2671, et seq. The case is now before the court on the Government’s motion to dismiss the third-party complaint for lack of subject matter jurisdiction, pursuant to Fed.R. Civ.P. 12(b), or alternatively, for summary judgment.

*176 FACTS AND PLEADINGS

For the purpose of consideration of motions under Rules 12(b) and 56, well-pleaded facts are taken as true, and the third-party complaint is construed in favor of the party opposing the motion. Davis Elliot Co., Inc. v. Caribbean Utilities Co., Ltd., 513 F.2d 1176, 1182 (6th Cir. 1975); Day v. UAW, 466 F.2d 83 (6th Cir. 1972).

Plaintiffs’ complaint maintains that an agent of defendant Williams Form, learning of the requirements and specifications of the Snettisham Project from the Corps of Engineers, recommended use of Wil-Kwik-Set grout and assured them the product met the Government’s specifications. They subsequently purchased Wil-Kwik-Set grout and applied it to transmission tower foundation pads and used it to grout anchor rods. The grout, it is alleged, failed to set up firmly, rapidly deteriorated, became soft and wholly unfit, and had to be replaced, together with all anchor rods and rock bolts, at a total cost of $557,519.19. The complaint comprises six counts, five of which state claims against Williams for the failure of Wil-Kwik-Set grout, as follows:

Count I: Breach of an express warranty that Wil-Kwik-Set grout met all requirements for its intended use, would successfully perform when integrated into the Snettisham Project, and would withstand the Alaska weather and climatic conditions.

Count II: Breach of an implied warranty of fitness for a particular purpose, namely, use on the Snettisham Project in conformity with the requirements of the Army Corps of Engineers.

Count III: Breach of implied warranty of merchantability, namely, that Wil-KwikSet grout was fit for the ordinary purpose for which grout is sold.

Count IV: Negligence in the following respects:

1. Failure to test the product for the use for which intended and sold.
2. Failure to warn intended users of any limitations upon the adaptability of the product to conditions likely to be encountered by users in the position of the Plaintiffs.
3. Failure to state on the label on the container in which the product was shipped, or by the use of other available means such as circulars, advertising material, or direct communication, that the Defendants have failed to test the product or to impart notification of the limitations of the use of the product under climatic conditions likely to be incurred.
4. Failure in the formulation and production of the Wil-Kwik-Set grout, which the Defendants sold the Plaintiffs, to observe known requirements for the formulation of grout which will perform under adverse climatic conditions.
5. Defendants formulated and produced grout of a composition which the defendants knew or should have known would not perform satisfactorily in out-of-door weather.

Count V: Res ipsa loquitur.

Defendant Williams Form maintains, in its third-party complaint and briefs, that the Corps of Engineers had operational duties under the contract with Green-Hoak to review, and approve or reject, the designs and material proposed by the contractors and also to inspect work in progress, and in so performing, the Government assumed a duty towards Williams Form to act with reasonable care. It alleges the Corps of Engineers redesigned the anchor rod specifications, thereby requiring the grout to act as a structural bearing material as well as a sealant, and also redesigned the electrical grounding system on the transmission towers, and that these changes, together with the Corps’s failure to perform its operational duties with reasonable care, caused the failure of Wil-Kwik-Set grout on the Snettisham Project.

Williams Form’s third-party complaint alleges that negligent acts and/or omissions of the Corps of Engineers were the primary and active causes of the damages suffered by plaintiffs and that its liability, if any, will be only vicarious and passive. Accordingly, it seeks full indemnity from the Government. In the alternative, Williams Form alleges that negligent acts and omis *177 sions of the Corps of Engineers make the Government a concurrent tortfeasor with Williams Form. Accordingly, Williams Form seeks contribution from the Corps.

DISCUSSION

1. Lack of Subject Matter Jurisdiction.

The Government first moves to dismiss the third-party complaint on the ground the district court has no jurisdiction to hear a contract claim in excess of $10,-000. It maintains Williams Form’s third-party complaint posits breaches of duties arising from the contract between the Corps of Engineers and Green-Hoak which can only be heard in the Court of Claims under the Tucker Act, 28 U.S.C. § 1491. It cites Woodbury v. United States, 313 F.2d 291 (9th Cir. 1963), where the Ninth Circuit Court of Appeals stated, at 296:

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Rannals v. Diamond Jo Casino
250 F. Supp. 2d 829 (N.D. Ohio, 2003)
Salter v. United States
880 F. Supp. 1524 (M.D. Alabama, 1995)
Hill v. Kokosky
463 N.W.2d 265 (Michigan Court of Appeals, 1990)
Davis v. New England Pest Control Co.
576 A.2d 1240 (Supreme Court of Rhode Island, 1990)
In RE v. Pangori & Sons, Inc.
53 B.R. 711 (E.D. Michigan, 1985)
Buettgen v. VOLKSWAGENWERK, AG
505 F. Supp. 84 (W.D. Michigan, 1980)