Opinion

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF RHODE ISLAND

) MICHAEL GEHRKE and RACHEL ) SOARES, ) Plaintiff, ) ) v. ) ) A/Z CORPORATION, ) Detendant/Third-Party Plaintiff ) ) Vv. ) ) BARNES BUILDINGS AND ) MANAGEMENT GROUP, INC., ) Third-Party Deftendant/ ) Fourth-Party Plaintitt ) ) Vv. ) ) BRYANT UNIVERSITY; FALCON ) nt xe bacwoeiaa ASSOCIATES ARCHITECTS, INC; __) Bh NOW KEYSTONE CONSTRUCTION ) CONSULTING, INC.; TURNER ) BROTHERS, LLC; MATERIAL ) CONCRETE CORP.; GEISSER ) ENGINEERING CORP:.; C.A. ) PRETZER ASSOCIATES, INC.; and ) TAUPER LAND SURVEY, INC., ) Fourth-Party Defendants. ) ) and ) ) FABRICIO VLADIMIR VIDES ) QUINTANILLA, ROBERTO RIOS, ) ROISE RIOS, A.R., R.R.; and A.R., ) Plaintitts, v. ) ) )

BARNES BUILDINGS & ) MANAGEMENT GROUP, INC.; ) A/Z CORPORATION; and BRYANT ) UNIVERSITY, ) Defendants. ) a)

ORDER Fourth-Party Defendant seeks to dismiss claims for contribution and/or indemnification made by Third-Party Defendant/Fourth-Party Plaintiff. Because there is no dispute indicating that Fourth-Party Defendant had a relevant duty of care, the Court GRANTS Defendant’s Motion for Summary Judgment. ECF No. 87. FACTS This matter arises out of the collapse of a partially erected steel building during the construction of an indoor practice facility (“the Project”) on the campus of Bryant University (“Bryant”). The Defendant A/Z Corporation (“A/Z”), was the general contractor for the Project, and the Third-Party Defendant Barnes Buildings and Management Group, Inc. (“Barnes”) was the subcontractor for the erection of the Project’s steel building. ECF No. 90-1 at 2. Bryant hired Keystone Construction Consulting, Inc. (“Keystone”), a Fourth-Party Defendant, to consult on the design and construction of the Project. In 2014, Bryant hired Keystone to “provide consulting services, as may be required by the Project management team at Bryant University, in support of the design and construction” of the Project. Jd Keystone did not contract with any other entity involved in the construction.

For the Project, Keystone’s principle, Ed Ryberg, served as part of the “Bryant University Team” throughout construction, reviewing and analyzing submissions as part of the Project’s approval process. He advised Bryant on various aspects of construction, including vendor procurement, construction scheduling and costs, and exterior and interior design. Jd. at 3. While Mr. Ryberg communicated with other entities in connection with the Project, such direct contact was limited, and he reported to Joshua Rodrigues—Bryant’s Project manager. ECF No. 87 at 4-5. Work on the Project site began in May 2015, with the placement of concrete forms and pouring of concrete beginning two months later. ECF No. 90-1 at 4. But problems arose soon after, and during the week before the collapse of the steel structure, multiple involved parties engaged in dialogue about the problems with the strength of the concrete. Jd. at 5. At the end of August, Geisser Engineering, which tested the concrete for the Project, sent various compression testing results for the concrete to Mr. Rodrigues at Bryant. Mr. Rodrigues forwarded the testing results to Mr. Ryberg, among others, asking them to review and pay close attention to compression test No. 35. Jd. Mr. Ryberg responded to the email chain by noting that Bryant should ask for batch records from the concrete supplier to ensure the concrete was made in accordance with the mix design. He also stated: “I think the concrete is being supplied under Turner Brothers contract. AZ, Turner Brothers, and the concrete supplier should be placed on notice that concrete is not meeting contract requirements.” Jd.

On the Friday before the collapse, A/Z was informed about the concerns about the concrete. A/Z noted that this was a “low area of concern” and that “Turner [the concrete supplier] had been put on notice.” A/Z has since acknowledged that it did not raise the concrete issues with Barnes because it considered the issue to be one of “low concern.” Jd. On Tuesday, September 1, 2015, the portion of the steel structure already partially assembled collapsed, injuring several workers.! A subsequent OSHA investigation determined Barnes failed to properly secure and brace the partially erected steel building during the erection, which led to the collapse. The construction continued under A/Z’s supervision and was ultimately completed the following spring. Id. at 10. Plaintiffs sued in 2018, claiming A/Z’s failure to maintain a safe worksite, resulting in the collapse of the steel structure, caused their injuries. A/Z then asserted a third-party complaint against Barnes and sought contribution or indemnification in the event A/Z faced liability. Jd. at 2. Barnes impleaded eight fourth-party defendants, including Keystone, seeking contribution or indemnification, and alleging their lability contributed in whole or in part to Plaintiffs’ injuries. Barnes argues that “[hlad Keystone brought the low concrete test’s results to the attention of Barnes, work on [the Project] could have been and

1 Plaintiff Michael Gehrke was a Barnes employee at the time of his injury, and Plaintiffs Rios and Vides Quintanilla were employees of Metal Bilt, which had been subcontracted for the erection of the metal building by Barnes. ECF No. 87 at 10.

likely would have been halted until adequate remedies and additional safety measures could have been implemented.” ECF No. 90-1 at 8. Keystone now moves for summary judgment pursuant to Fed. R. Civ. P. 56 on the Counts brought against it in the fourth-party complaint (Counts V and VD. STANDARD OF REVIEW When making a summary judgment determination, the court must review the entire record and consider the facts and inferences in the light most favorable to the nonmoving party. Conti Cas. Co. v. Canadian Univ. Ins. Co., 924 F.2d 370, 373 (1st Cir. 1991). Fed. R. Civ. P. 56(a) dictates that summary judgment should be granted if “the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.” A genuine dispute of material fact is an issue that “may reasonably be resolved in favor of either party.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 250 (1986). A dispute is “genuine” when “the evidence about the fact is such that a reasonable jury could resolve the point in favor of the nonmoving party.” Aivera- Muriente v. Agosto-Alicea, 959 F.2d 349, 352 (1st Cir. 1992) (citing United States v. One Parcel of Real Prop., 960 F.2d 200, 204 (1st Cir. 1992)). If there is a genuine dispute of a material fact, that dispute would “needI ] to be resolved by a trier of fact.” Doe v. Tr. of Bos. Coll., 892 F.3d 67, 79 (1st Cir. 2018) (citing Kelley v. LaForce, 288 F.3d 1, 9 (Ist Cir. 2002)). “Genuine issues of material fact are not the stuff of an opposing party’s dreams. On issues where the nonmovant bears the ultimate burden of proof, he must present definite, competent evidence to rebut the motion.” Mesnick

v. Gen. Elec. Co., 950 F.2d 816, 822 (1st Cir. 1991) (citing Anderson v. Liberty Lobby, Inc., 477 U.S. 242

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Anderson v. Liberty Lobby, Inc.
477 U.S. 242 (Supreme Court, 1986)
Milissa Garside v. Osco Drug, Inc.
895 F.2d 46 (First Circuit, 1990)
Samuel Mesnick v. General Electric Company
950 F.2d 816 (First Circuit, 1991)
Juan Rivera-Muriente v. Juan Agosto-Alicea
959 F.2d 349 (First Circuit, 1992)
Wilson v. Krasnoff
560 A.2d 335 (Supreme Court of Rhode Island, 1989)
Volpe v. Gallagher
821 A.2d 699 (Supreme Court of Rhode Island, 2003)
Benaski v. Weinberg
899 A.2d 499 (Supreme Court of Rhode Island, 2006)
Martin v. Marciano
871 A.2d 911 (Supreme Court of Rhode Island, 2005)
Forte Bros. v. National Amusements, Inc.
525 A.2d 1301 (Supreme Court of Rhode Island, 1987)
Robertson Stephens, Inc. v. Chubb Corp.
473 F. Supp. 2d 265 (D. Rhode Island, 2007)
Kelley v. LaForce
288 F.3d 1 (First Circuit, 2002)
Doe v. Trustees of Boston College
892 F.3d 67 (First Circuit, 2018)
United States v. Plat 20, Lot 17
960 F.2d 200 (First Circuit, 1992)

Cite This Page — Counsel Stack

Bluebook (online)
Gehrke v. A/Z Corporation, Counsel Stack Legal Research, https://law.counselstack.com/opinion/gehrke-v-az-corporation-rid-2020.