This text of Fiore Concrete Inc. v. J. Rocchio Corp. (Fiore Concrete Inc. v. J. Rocchio Corp.) is published on Counsel Stack Legal Research, covering Superior Court of Rhode Island primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Fiore Concrete Inc. v. J. Rocchio Corp., (R.I. Ct. App. 2009).

Opinion

DECISION
This case was tried before the Court, jury-waived.1

Fiore Concrete Products, Inc. ("Fiore") produced and supplied manholes pursuant to a contract with Defendant, John Rocchio Corporation ("Rocchio"). Rocchio failed to pay for all of the manholes which were supplied, and claimed some were defective. At trial, Fiore established an amount due of $26,542.73, after several returns and other credits.

Findings of Fact
Mr. John Rocchio, the president of the Defendant Corporation, established that his company entered into contract to purchase a quantity of manholes2 for several sewer projects his company had undertaken in Warwick and nearby communities. He acknowledged that the company received manholes from Fiore which were not paid for. For these deliveries, Rocchio received invoices totaling $26,542.73, which were never paid.3 Mr. Rocchio alleged these *Page 2 invoices were for defective products, although some were installed and some were discarded. When Rocchio failed to make timely payment, Fiore filed claims against the surety bonds written by RLI Insurance Company. These bonds were posted to protect the interests of the local community for liability for loss in the construction of the sewer projects.

Mr. Antonio Duarte, the foreperson for Rocchio on a Conimicut project in Warwick, visually inspected each of the manholes upon delivery from Fiore, returning those he discovered to be defective on receipt. Those returned manholes were removed from the billings and are not at issue for this trial. All other manholes were installed, one at a time. Most of the deliveries were made in September and October, 2002. Mr. Duarte explained that there was a problem with the first manhole installed as it did not close properly. As the installation continued, he did not see the mastic (a sealant) seep out as the boots (connection joints to other pipes) were connected. He informed Mr. Rocchio who instructed Mr. Duarte to proceed with installation and to do the `best you can' to continue installation. The manhole, and manholes subsequently installed, were backfilled to the road level.

Manholes which were installed continued to leak, though they were designed to not leak. After two joints leaked on the first manhole, and pumps were used to keep them dry, Mr. Duarte again informed Mr. Rocchio who instructed Mr. Duarte to use waterblock (a hydraulic cement). Still, the leaks continued.

Mr. Duarte used the same installation process on the second manhole and encountered the same problem: joints did not compress the gaskets sufficiently. The problem continued as all 40 manholes in Mr. Duarte's project were installed. Mr. Duarte's installation team continued to move pumps, installing one manhole at a time, and were fully aware of the ongoing problems. After all 40 manholes were installed, water was leaking into about 20 or 25 of the manholes at *Page 3 the seams for the boots. Mr. Duarte recognized this as the manholes were installed, and acknowledged that he would have returned any manholes he desired before installation. He did not inform Fiore Concrete of the defects, but when he told Mr. Rocchio, he was told to "keep going."

Gioaccino Manna was the foreperson for Rocchio on the other Conimicut project. He supervised installation of 30 to 35 manholes supplied by Fiore. He encountered difficulty with the first manhole he installed as the boot did not seal. Mr. Rocchio instructed Mr. Manna to continue and "do the best you can." Of the 35 manholes Mr. Manna installed, eight leaked at their boots and 26 or 27 had leaking joints. Mr. Manna never spoke with Fiore. He testified that other manholes, supplied by Fiore Concrete Products, Inc., functioned properly. Mr. Manna did not note the defects or gaps on his daily reports, but he did inform Mr. Rocchio.

Mr. Salvatore Calise of Rocchio then testified. His duties were to follow the installations and perform water infiltration tests. These included both air testing and visual tests. He reported to Mr. Rocchio that 40 to 45 leaks continued, which he would attempt to repair. Mr. Calise used waterplug on the rings and boots but his repairs were minimally successful. New England Pipe Cleaning was then called to resolve the leaks.

Mr. Roland Fiore, the president of the plaintiff-supplier established that his company entered into a blanket purchase order with Rocchio. The Rhode Island Department of Transportation required many specifications for the manholes. Fiore maintained a stock of manholes for its sales. The manholes were then modified and supplied pursuant to project drawings submitted by the customer. In November of 2002, after many of the manholes had already been set, Mr. Fiore received a letter complaining about the manholes. Fiore dispatched an engineer to the site who determined that the manholes met the specifications on the orders. *Page 4 Fiore concluded that different boots and gaskets should have been used for this type of installation. When Rocchio failed to pay for what was ordered, an argument arose. When Rocchio countered by subtracting "back charges" $62,551.94 in repairs from the bills, Fiore cut off shipments to Rocchio. Mr. Fiore also established that in the middle of the ongoing installation, Rocchio's staff asked that a certain waterproofing sealant not be sent. He found this to be odd as the engineer specified hydrocide sealant for use.

Mr. Rocchio saw the manholes delivered, already coated with some mastic. He acknowledged he saw some leaks at the outset of installations. Timeliness of the installation was important to his company as there was a $10,000 penalty if the installations were late. Accordingly, he did not believe the installations could stop. When certain manholes did not meet specifications, Rocchio mixed and matched from the inventory that had been received to see what would fit. Rocchio decided to continue installing, knowing the defects. After three manholes did not function, Rocchio informed Fiore, who sent employees to attempt to fix the leaking. Although the leaking continued, Rocchio proceeded to install additional manholes. In late 2003, Rocchio enlisted an outside contractor, New England Pipe Cleaning, who repaired the leaks with a special epoxy. Mr. Rocchio testified that his company was "under intense pressure from the city as he was already nearing the end of the deadline for installation."

Apart from the Warwick installations, Rocchio produced no evidence concerning the installation of the sewers in East Greenwich or Mattapoisset. Although Fiore established that it shipped manholes to these localities pursuant to the purchase orders with Rocchio, there was no explanation of why those bills were not paid.

Fiore commenced this action in November 2003, for the payment of the invoices due. Rocchio counterclaimed for the costs it incurred to repair the leaks. *Page 5

ANALYSIS AND CONCLUSIONS OF LAW

1. A binding contract existed.

The parties acknowledged that they were each bound by the purchase agreement. They further agree that, pursuant to the contract, manholes were ordered as specified and delivered. Agreed terms are a prerequisite to a binding contract. "In addition to mutual assent, a bilateral contract requires mutuality of obligation, which is achieved when both parties are bound legally to the making of reciprocal promises."Centreville Builders, Inc. v. Wynne,

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Bailey v. West
249 A.2d 414 (Supreme Court of Rhode Island, 1969)
Weaver v. American Power Conversion Corp.
863 A.2d 193 (Supreme Court of Rhode Island, 2004)
Centerville Builders, Inc. v. Wynne
683 A.2d 1340 (Supreme Court of Rhode Island, 1996)
Corning Glass Works v. SEABOARD SURETY COMPANY
308 A.2d 813 (Supreme Court of Rhode Island, 1973)
Tomaino v. Concord Oil of Newport, Inc.
709 A.2d 1016 (Supreme Court of Rhode Island, 1998)
Opella v. Opella
896 A.2d 714 (Supreme Court of Rhode Island, 2006)
McKethean v. Washington Metropolitan Area Transit Authority
588 A.2d 708 (District of Columbia Court of Appeals, 1991)
Bibby's Refrigeration, Heating & Air Conditioning, Inc. v. Salisbury
603 A.2d 726 (Supreme Court of Rhode Island, 1992)
McFarland v. Brier
769 A.2d 605 (Supreme Court of Rhode Island, 2001)
Norm Company v. Cumberland Coal Co.
165 A. 592 (Supreme Court of Rhode Island, 1933)

Cite This Page — Counsel Stack

Bluebook (online)
Fiore Concrete Inc. v. J. Rocchio Corp., Counsel Stack Legal Research, https://law.counselstack.com/opinion/fiore-concrete-inc-v-j-rocchio-corp-risuperct-2009.