Ferentchak v. Village of Frankfort

459 N.E.2d 1085, 121 Ill. App. 3d 599, 76 Ill. Dec. 950, 1984 Ill. App. LEXIS 1449
CourtAppellate Court of Illinois
DecidedJanuary 26, 1984
Docket3—83—0116, 3—83—0138 cons.
StatusPublished
Cited by37 cases

This text of 459 N.E.2d 1085 (Ferentchak v. Village of Frankfort) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Ferentchak v. Village of Frankfort, 459 N.E.2d 1085, 121 Ill. App. 3d 599, 76 Ill. Dec. 950, 1984 Ill. App. LEXIS 1449 (Ill. Ct. App. 1984).

Opinions

JUSTICE ALLOY

delivered the opinion of the court:

This is a consolidated appeal from judgments entered by the circuit court in favor of plaintiffs Philip and Caroline Ferentchak and against defendant Robert E. Hamilton and defendant village of Frankfort, a municipal corporation. The case is based upon property damage to the plaintiffs’ home in the village of Frankfort as a result of alleged negligence by the defendants. The jury found against both defendants. The separate appeals by the defendants have been consolidated for appeal. A threshold issue, raised by both defendants, is whether the plaintiffs’ negligence actions seek merely “economic damages,” and are, therefore, barred by the decisions of the Illinois Supreme Court in Moorman Manufacturing Co. v. National Tank Co. (1982), 91 Ill. 2d 69, 435 N.E.2d 443, and Redarowicz v. Ohlendorf (1982), 92 Ill. 2d 171, 441 N.E.2d 325. Since we find no bar to the negligence actions under Moorman, we also address the other issues raised by the defense. Defendant Robert Hamilton contends that his liability, as architect and subcontractor, terminated upon completion of his contract with the builder and acceptance of his work. He also contends that the trial court committed prejudicial error in permitting plaintiffs’ expert to testify to his opinion as to unethical conduct by Hamilton. The municipal defendant, village of Frankfort (hereinafter Frankfort), argues that the plaintiffs failed to both state and prove any cause of action against it. We turn to the facts as found in the record.

In 1971, Albert Krusemark (hereinafter developer) engaged defendant Robert Hamilton, an Illinois civil engineer and sole proprietor of his own consulting firm, to design and oversee the construction work on a subdivision in Frankfort. The contract called upon Hamilton to design and construct the subdivision so as to meet applicable code requirements of the village. Included in the subdivision design and construction work was a surface water drainage system for the project. Hamilton, pursuant to his contract with developer, did the engineering work on the project.

Hamilton, at the same time, was also the village engineer for Frankfort. In that capacity, he reviewed the subdivision plans submitted by developer to the village planning commission. Such review required him to assess if the proposed plans complied in all respects with the village’s building and zoning codes. Hamilton reviewed the plans and passed them, advising the board in writing that they conformed to applicable village standards. The subdivision plat was accepted by the village and the plat was recorded in 1973.

Hamilton’s plans concerning the surface water drainage system for the subdivision included a 20-foot wide channel easement for surface water drainage between the northern boundary of Lot 82 and the southern boundary of Lot 81 in the subdivision. The designation “channel easement” was on the plat of the subdivision between those two lots, although there were no specifications on the plans indicating the shape or depth of any channel to be constructed. The village’s 1971 ordinances did not require that such specifications be included on subdivision plats. Hamilton would testify later at trial that the omission of specifics was intentional, to permit individual development of the lots, while reserving to the village the right to restore the natural drainage, through use of the channel easement. Hamilton also testified that no specifics were set forth because there was no way of knowing how the adjacent properties would be developed, which development would affect the design of the channel.

Lot 81, the property at issue herein, was sold by developer to Lidio Filippo (hereinafter builder) in 1975. Builder then applied to the village for a building permit for construction of a single-family residence on Lot 81. At the time of his application, he was informed by William Knippel, building and zoning codes administrator for the village (hereinafter Code Administrator), that the foundation grade of the home had to be a certain number of inches about the mid-level of the curb or street. Builder testified at trial that Code Administrator informed him specifically of what foundation grade to build for the house. Code Administrator testified that he informed the builder of the standard minimum foundation level required by the city, thereby leaving a final decision as to foundation grade above that level to the builder. Code Administrator also stated that the plans submitted by builder in his application for building permit did not contain any specification as to foundation grade level. When the builder indicated that he was ready to pour the footings, Code Administrator visited the premises for an on-site inspection prior to commencement of the cement pour. At that time, Code Administrator directed that the foundation be raised as much as possible and still remain on good, bearing soil. The foundation height was raised several inches above the minimum, or approximately 20 inches above middle of the lot. The home was built on Lot 81 with the foundation at the height indicated by the Code Administrator at the time of construction, approval of building having been given.

Subsequent to construction of the home, builder sold the property to plaintiffs Caroline and Philip Ferentchak, in August of 1976. There was some delay in the Ferentchaks’ taking possession as a result of problems obtaining the occupancy permit from the village. Code Administrator, prior to approving an occupancy permit for the home, insisted that builder put in a drainage swale, as indicated on the plat of the subdivision. Builder testified at trial that he was unaware that a drainage swale had to be constructed until so informed by the Code Administrator during the attempt to obtain the occupancy permit. The permit was withheld until the drainage matters were addressed. Since the plat contained no specifics as to construction of the swale, builder asked Code Administrator what needed to be done to get the approval on the permit. Code Administrator, after consulting with Bruce Hamilton, an employee of defendant, Robert Hamilton, gave builder specific directions for construction of the drainage swale on Lot 81. In the same period of time, Code Administrator, during a visit to the site, objected to a crown, or gentle slope, that ran across the rear portion of Lot 81. He felt that the crown would impede proper drainage and was, therefore, unacceptable. On his directions, the builder flattened the crown so that water would drain from north to south, from the back of the lot to the front. Builder also dug the drainage swale and sodded it according to directions from the Code Administrator. Code Administrator thereafter visited the site and approved the occupancy permit, the required changes having been made.

In January 1977 the Ferentchaks began to experience water problems at their new home. They noticed water in the back portion of the rear yard, as well as the water running in the swale to the street. In February 1977, water was observed in the family room down in the basement. The problems with water oozing into the lower level of the house have continued since that time, without significant abatement, whenever there is a heavy rain in the area. Their attempts to solve the problem, through basement waterproofing, were unsuccessful. In the spring of 1978, Colin Gray, a civil engineer obtained by the Ferentchaks’ attorney, examined the property.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Harleysville Insurance Co. v. Mohr Architecture, Inc.
2021 IL App (1st) 192427-U (Appellate Court of Illinois, 2021)
Thompson v. Gordon
948 N.E.2d 39 (Illinois Supreme Court, 2011)
Laidlaw Waste Systems, Inc. v. Mallinckrodt, Inc.
925 F. Supp. 624 (E.D. Missouri, 1996)
Calloway v. Kinkelaar
659 N.E.2d 1322 (Illinois Supreme Court, 1995)
Sohaey v. Van Cura
607 N.E.2d 253 (Appellate Court of Illinois, 1992)
Polak v. Person
597 N.E.2d 810 (Appellate Court of Illinois, 1992)
HENNEPIN DRAIN. & LEVEE DIST. v. Klingner
543 N.E.2d 967 (Appellate Court of Illinois, 1989)
Hennepin Drainage & Levee District v. W.H. Klingner
543 N.E.2d 967 (Appellate Court of Illinois, 1989)
Oldenburg v. Hagemann
512 N.E.2d 718 (Appellate Court of Illinois, 1987)
Blake Const. Co., Inc. v. Alley
353 S.E.2d 724 (Supreme Court of Virginia, 1987)
Wheeling Trust & Savings Bank v. Tremco Inc.
505 N.E.2d 1045 (Appellate Court of Illinois, 1987)
Washington Courte Condominium Ass'n-Four v. Washington-Golf Corp.
501 N.E.2d 1290 (Appellate Court of Illinois, 1986)
Anderson Electric, Inc. v. Ledbetter Erection Corp.
503 N.E.2d 246 (Illinois Supreme Court, 1986)
Swaw v. Ortell
484 N.E.2d 780 (Appellate Court of Illinois, 1985)
Lakeside Condominium "C" Ass'n v. Frediani Developers, Inc.
482 N.E.2d 665 (Appellate Court of Illinois, 1985)
Anderson Electric, Inc. v. Ledbetter Erection Corp.
479 N.E.2d 476 (Appellate Court of Illinois, 1985)

Cite This Page — Counsel Stack

Bluebook (online)
459 N.E.2d 1085, 121 Ill. App. 3d 599, 76 Ill. Dec. 950, 1984 Ill. App. LEXIS 1449, Counsel Stack Legal Research, https://law.counselstack.com/opinion/ferentchak-v-village-of-frankfort-illappct-1984.