Evans v. Western Brass Manufacturing Co.

24 S.W. 175, 118 Mo. 548, 1893 Mo. LEXIS 176
CourtSupreme Court of Missouri
DecidedDecember 11, 1893
StatusPublished
Cited by16 cases

This text of 24 S.W. 175 (Evans v. Western Brass Manufacturing Co.) is published on Counsel Stack Legal Research, covering Supreme Court of Missouri primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Evans v. Western Brass Manufacturing Co., 24 S.W. 175, 118 Mo. 548, 1893 Mo. LEXIS 176 (Mo. 1893).

Opinion

Black, P. J.

— The plaintiffs are partners owning and operating marble mills at Baltimore, Maryland. The defendant is a corporation located at St. Louis, in this state, and engaged in the business of furnishing plumbers’ supplies. The plaintiff brought 'this suit to recover a balance due upon an open account. A large part of the account is by defendant conceded to be correct. The contest arises oat of three shipments made by the plaintiff to the Hussy-Day Company, under a letter from the defendant to the plaintiffs-, dated the twenty-third of February, 1889.

The following are the material portions of that letter:

“We have forwarded you a diagram by mail to-day for a lot of marble work. Each slab is to be numbered, both backs and slabs, so that they will go in at the proper place. Ship direct to Omaha, Nebraska. You will notice each slab is numbered, and the plan [552]*552shows whether it is on back or back and one end or back and two ends. Italian marble to be one and one-quarter inch, partitions and backs of urinals to be seven-eighths of an inch, and the bases two inches thick. These bases call for American or Georgia marble. A cheap grade of Italian marble will do just as well, if you have not got either of the above, only we have got to have that grade of marble, in order to ' meet the price we have bid on.”

It appears that the slabs and other pieces, when polished and shipped to the Hussy-Day company, were not of the thickness specified in the letter. But it is stated in the bill of exceptions that the plaintiff produced evidence tending to show that the marble pieces, when sawed, and before polished, were of the-specified thickness; and that in the trade a specified thickness means the thickness of the slabs as sawed and before polished. On this point defendant produced evidence tending to show that there was no understanding in the trade that an order for marble of a specified thickness, prepared for immediate use, means the thickness when sawed into slabs and before polished.

It is also stated in the bill of exceptions that the bases for urinals were made of Rutland, Vermont, marble; that “Rutland, Vermont” marble and American marble mean the same thing; that plaintiff produced evidence tending to show that Vermont marble is suitable for such purposes. On the other hand, the defendant produced evidence tending to show that Rutland, Vermont, marble is unfit for urinal bases, because it is too porous.

It appears the Hussy-Day Company refused to accept the marble pieces now in question, and left them with the carrier. The defendant was required to supply other pieces for those rejected. There is no evidence as to the terms of the contract between the [553]*553defendant and the Hussy-Day Company.

The defendant objected to some, but not all, of the evidence produced by the plaintiffs tending to show that an order for polished marble of a specified thickness means in the trade the thickness when sawed. The defendant also asked the court to instruct that the plaintiffs were, under the letter, bound to furnish marble pieces of the thickness specified in the letter when prepared and finished for use, and that defendant had a right to reject the pieces not of such thickness whenever polished. The court refused this instruction. As the refusal of the instruction and the objection to the evidence present the same question, they may be considered together.

The general rule undoubtedly is, that parol evidence cannot be admitted to contradict, add to, or vary a written contract; and it is the duty of the court to construe the writing. Bunce, Adm’r, v. Beck, Ex’r, 43 Mo. 266; Black River Lumber Co. v. Warner, 93 Mo. 374; State ex rel. Yeoman v. Hosham, 98 Mo. 358. But it is equally well settled that proof of usage is ■often admitted to interpret the meaning of the language used; for under many circumstances the parties may be supposed to contract with reference to a usage •or custom, as they are presumed to use words in their ordinary signification. 1 Greenleaf on Evidence, sec. 292. “The courts,” says Starkie, “have long allowed mercantile instruments to be expounded according to the usage and custom of merchants, who have a style und language peculiar to themselves, of which usage and custom are the legitimate interpreters.” Starkie on Evidence [10 Ed.J, p. 701. Hence it has been held by this court that it may be shown by way of a general •and well established custom that two packs of shingles of a certain size constitute a'thousand. Soutier v. Kellerman, 18 Mo. 509. See, also, Blair v. Corby, 37 Mo. [554]*554314; Kimball v. Brawner, 47 Mo. 398; Fruin v. Railroad, 89 Mo. 402; Wolff v. Campbell, 110 Mo. 119; Bobinson v. United States, 13 Wall. 365. It is true, as some of the cases just cited show, that usage cannot be permitted to control the terms of a special contract by introducing something which is repugnant to or' inconsistent with the contract. But it does not follow that evidence of usage can only be received where the-words of the contract are ambiguous. Such evidence is often received to show that words are used in a sense different from their ordinary meaning, as in Soldier v. Kellerman, supra. Such evidence is received on the-theory that the parties knew of the usage or custom and contracted in reference to it, and in such cases the evidence does not add to or contradict the language used, but simply interprets and explains its meaning.

It was therefore competent for the plaintiff to show that in the marble trade an order for slabs of a specified thickness, prepared for use, means slabs of a stated thickness as they come from the saw. And the evidence being admissible, there was nó error in refusing to instruct it out of the case, for that is what the refused instruction seeks to do. A custom or usage, to-be of any avail, ought to be shown to be well established; but the defendant did not seek to have this-matter explained by instructions. We do not know what the evidence of the alleged custom and usage was, for very little of it is preserved in the bill of exceptions. Though such evidence ought to be admitted with care, still we cannot say the court erred in admitting the-evidence or in refusing the instruction.

2. The next complaint is that the court erred in refusing a part of the instruction before mentioned, which is to this effect: If the plaintiff shipped bases made from Rutland, Vermont, marble, and this marble was not suitable for urinals, the defendant had the-[555]*555right to reject such marbles.

As the instruction was erroneous, for the reasons-before stated, there was no error in refusing it as a. whole. But we think the part just stated was properly-refused, even if it stood as a separate instruction. According to the letter constituting the contract, the-bases were to be of American or Georgia marble, or of a cheap grade of Italian marble! It seems to be conceded that American marble means and includes Vermont, but not Georgia marble. Now, the complaint is. not that this Vermont marble furnished by the plaintiffs was of an inferior quality, but the contention is-that the instruction should have been given because there is evidence tending to show that Vermont marble-is not, suitable for urinal bases. In other words the claim is that plaintiffs should have made the bases of' Georgia or Italian marble, though the contract gave-them the right to use Vermont marble for the bases. This is not, and cannot be, the law. The plaintiffs had.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Heiden v. General Motors Corp.
567 S.W.2d 401 (Missouri Court of Appeals, 1978)
Weekley v. Wallace
314 S.W.2d 256 (Missouri Court of Appeals, 1958)
Stentor Electric Mfg. Co. v. Klaxon Co.
30 F. Supp. 425 (D. Delaware, 1939)
Jacobs v. Danciger
41 S.W.2d 389 (Supreme Court of Missouri, 1931)
Electric Reduction Co. v. Colonial Steel Co.
120 A. 116 (Supreme Court of Pennsylvania, 1923)
Fellows v. Dorsey
157 S.W. 995 (Missouri Court of Appeals, 1913)
Robinson v. Korns
157 S.W. 790 (Supreme Court of Missouri, 1913)
Dougherty v. Dougherty
102 S.W. 1099 (Supreme Court of Missouri, 1907)
Freygang v. Vera Cruz & P. R.
154 F. 640 (Fourth Circuit, 1907)
Trimble v. Kansas City, Pittsburg & Gulf Railroad
79 S.W. 678 (Supreme Court of Missouri, 1904)
Meredith v. Holmes
80 S.W. 61 (Missouri Court of Appeals, 1904)
Baer v. Glaser
90 Mo. App. 289 (Missouri Court of Appeals, 1901)
Wilcox v. Baer
85 Mo. App. 587 (Missouri Court of Appeals, 1900)
Cameron v. McNair & Harris Real Estate Co.
76 Mo. App. 366 (Missouri Court of Appeals, 1898)
Verdin v. City of St. Louis
33 S.W. 480 (Supreme Court of Missouri, 1895)
Lowenstein & Thomas v. Wabash Railroad
63 Mo. App. 68 (Missouri Court of Appeals, 1895)

Cite This Page — Counsel Stack

Bluebook (online)
24 S.W. 175, 118 Mo. 548, 1893 Mo. LEXIS 176, Counsel Stack Legal Research, https://law.counselstack.com/opinion/evans-v-western-brass-manufacturing-co-mo-1893.