Eberson v. Continental Investment Co.

109 S.W. 62, 130 Mo. App. 296, 1908 Mo. App. LEXIS 231
Missouri Court of Appeals·Decided March 31, 1908·Published·Cited by 4 cases

Opinion

GOODE, J.

In the summer of 1902, plaintiff was a tenant of the defendant company, occupying a double brick building Nos. 901, 903 North Second Street in the city of St. Louis. The premises were used by plaintiff for a paint factory and. for the sale of paints. The lease provided, among other things, that defendant should keep the building in good condition and in the event of partial destruction by fire should speedily restore it to as good condition as it was in previously. 'The stipulation especially included an agreement on -the part of defendant to keep; the roof in good order. On June 13, 1902, the roof was destroyed by fire to an extent that exposed the contents of the building, including plaintiff’s paint and other merchandise, to the elements. Defendant employed a firm of contractors, Hogg & Reid, to make permanent repairs to the damaged roof. The fire had burned about an elevated skylight or cupola with glass sides, destroying that portion of the roof and a space around the skylight; perhaps a strip of roof about twelve feet long and as wide. Part of the remainder of the roof was so charred that it had to be torn away and reconstructed, and so the ■contractors removed a space sixty feet long and extending over the width of the building. Plaintiff swore his 'goods-suffered very little damages from the fire, practically none; because the Salvage Corps of the City Fire Department spread tarpaulins over his property and protected it from water thrown by the fire engines. But on a previous trial he had given testi[299] mony that considerable damage was sustained by the first fire in consequence of advertising matter being totally lost and cans being caused to rust. The goods were on the second floor and basement, according to the testimony, though we suppose the basement means the ground floor. As the fire was only in the roof, the goods were not burned and were, as said, practically undamaged by the water used in extinguishing the fire. It was raining heavily about the time, and plaintiff was apprehensive his property might be injured by a rain during the repairing of the roof. He had several conversations with Mr. Hogg, one of the contractors, in regard to whether his goods would be protected during the repair work and Mr. Hogg assured him they would be; that all requisite precautions would be taken to keep them from getting wet. Plaintiff’s business was never checked after the fire, but he continued to carry it on without interruption, just as he had before, relying on the assurances of the contractor that proper precautions would be taken to keep the rain from get-' ting into the building. During the night of June 27th, or the morning of the 28th, there was a very heavy and unusual fall of rain, accompanied by a high wind. This storm overcame the measures taken by the contractors to protect plaintiff’s premises and the rain beat into the building, flooding it with water and seriously damaging plaintiff’s property. The contractors had spread tarpaulins over the roof above plaintiff’s office, which was on the second floor, but seem to have done nothing to'protect the other portions of the building, depending on getting the roof constructed with sufficient rapidity to prevent damage. One of the contractors said it did not look like rain the evening before the damage was done, and it is obvious they took the risk of rain, but they assert plaintiff authorized this course. There was testimony of experts tending to prove that by taking proper precautions the rain could have been [300] kept out of the building and plaintiff’s property saved. The cause was here on appeal before and other facts may be found in the opinion then rendered (118 Mo. App. 67).

This action was instituted to recover for the damage done the property, on the ground of negligence on the part of defendant’s agents, the contractors, in allowing the roof to remain in such a condition during the repair work that the property was exposed to the elements. The defense, besides a general denial of the averments of the answer, consisted of a plea that the contractors left a portion of the roof uncovered and unprotected with plaintiff’s leave, license and consent, and that the rain which fell on his property came through the portion of the roof thus left unprotected; that plaintiff accepted the risk of whatever injury might result from leaving the roof open. There was another plea that the injury sustained was caused by plaintiff’s own negligence contributing thereto, in that he allowed his property to remain in the building in such condition that it was exposed to the rain which fell on it. The issues were left to the jury which returned a verdict in plaintiff’s favor for $2,725, and judgment having been entered in accordance with the verdict, defendant appealed.

Free access — add to your briefcase to read the full text and ask questions with AI

Eberson v. Continental Investment Co., 109 S.W. 62, 130 Mo. App. 296, 1908 Mo. App. LEXIS 231 (Mo. Ct. App. 1908).

109 S.W. 62 (Eberson v. Continental Investment Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Ferguson v. Overhead Door Co. of Springfield
549 S.W.2d 356 (Missouri Court of Appeals, 1977)
Bloecher v. Estate of Duerbeck
62 S.W.2d 553 (Supreme Court of Missouri, 1933)
Medley v. Trenton Investment Co.
236 N.W. 713 (Wisconsin Supreme Court, 1931)
Leach v. Bopp
12 S.W.2d 512 (Missouri Court of Appeals, 1929)