Easthampton Lumber & Coal Co. v. Worthington

79 N.E. 323, 186 N.Y. 407, 24 Bedell 407, 1906 N.Y. LEXIS 1127
CourtNew York Court of Appeals
DecidedNovember 27, 1906
StatusPublished
Cited by7 cases

This text of 79 N.E. 323 (Easthampton Lumber & Coal Co. v. Worthington) is published on Counsel Stack Legal Research, covering New York Court of Appeals primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Easthampton Lumber & Coal Co. v. Worthington, 79 N.E. 323, 186 N.Y. 407, 24 Bedell 407, 1906 N.Y. LEXIS 1127 (N.Y. 1906).

Opinion

Vann, J.

This action was brought to foreclose a mechanic’s lien filed by the contractor to secure payment of a balance alleged to be due upon the contract price and for extra work, in erecting a dwelling house for the defendant in the town of Easthampton, county of Suffolk. The trial court directed judgment for the plaintiff, the assignee of the contractor, for. the entire amount claimed, and while the findings were in the short form it was found specifically “ that there was a substantial performance of the contract by the contractor.” The Appellate Division affirmed, hut by a divided vote. The contract was in writing, and .required the contractor to provide all the materials and perform all the work mentioned in ' the specifications, and to complete the building by the 15th of May, 1899." The contract price was $3,150, and the extra labor and’ materials amounted to $441.36, according to the claim of the contractor. The owner had paid $2,600, leaving a balance of $991.36, for which, with interest, judgment was rendered.

While the copy of the specifications used by the contractor differed somewhat from that retained by the architect, we *409 shall confine-ourselves to the specifications delivered to the contractor, which lie testified were a part of the contract and were used by him to build the house. Those specifications provided that the house is to be set on 5 inch piles set 4 feet in ground to be of acceptable local wood to be approved by the architect.” The contractor testified that.“the house was set on locust posts. They were not set 4 feet in the ground. * * * It was not necessary on the sand or beach as that was; they went as far as perhaps two or three feet, down to frost. These piles were set upon fiat stones. The flat stones were not called for in the specifications. It was better with the flat stones.”

The specifications required “ Ilip rafters, 2 inches by 10 inches.” Ho hip rafters were put in.

The other rafters were to be “ 2 inches by 6 inches,' 20 inch on centers,” but while the contractor put in rafters of the required size they were “but 24 inches on the center.” lie testified that he did this because it makes a better job of it, it was no gain to me at all.”

The first story beams were to be 2 inches by 10 inches, but beams 2 inches by 9 were put in, “ because it was discovered that they were strong enough and it reduced the price.”

“ Stair horses, 3 inches by 10 inches,” were required, but none were put in, because in the opinion of the contractor they were not needed.

“Ribbon strips, one inch by 7 inches,” although required, were not put in, but smaller timber was used, because, as the contractor thought, “it made just as good a job as the others, there was really no change made, the timber used would cost more than the ribbon strip.”

“ Bridging, 2 inches by 2 inches,” was called for but not put in and the explanation given was that “ bridging 2 by 2 was out of stock, and they did not keep it in stock at any time.”

The entire frame was to be covered with “ ¿-th inch sheath ing,” which in turn was to be covered with “ Black Heponset building paper made by F. W. Bird & Son, E. Walpole, *410 Mass.” The contractor testified that he did not use this paper “ because it was not to be had ; I used Child’s paper; I consider that the red is best, and is used in preference to the black on Long Island. The black Neponset paper was not in stock at the time. * * I should say that it (Child’s paper) was ás good as the other. * * * It is as expensive as the other as far as I know, I don’t know just'what the black -would cost.”

The manager of the plaintiff, testifying in its behalf, said that he knew of black Neponset paper and that it was a well-known article to the trade, but that the paper furnished he considered as good as the black Neponset. The architect testified that the paper used was porous and no better than newspaper ; that it cost but fifty cents a roll while black Neponset cost about $1.73 a roll.

“ Sampson’s Spot Braided Cotton Sash cord,” although called for, was not used, but Silver Lake cord substituted, because, as the contractor testified, “I never heard of Sampson’s cord. I did not know anything in regard to the two different kinds of cord. The kind I used, Silver Lake, is considered the best in the market. I did not know anything about Sampson’s and I know that Silver Lake is" good.” Another witness called by the plaintiff testified that the cord used “is good quality sash cord the same as is used on the eastern end of Long Island. As compared with Sampson’s cord I do not know how they would compare in cost.” The architect testified that the cord used was not durable and that it is already partly worn out while that called for by the specifications is strong and durable. .

The specifications required “all tin to be of Merchant’s Alaska for lining, flashing and gutters,” The contractor did not use the kind specified, saying, “1 suppose that Alaska tin is some special brand, there are a number of different kinds. I got this at Eastliampton from Mr. Grimshaw. He is the only dealer in tin. It is used on first class jobs.” Mr. Grimshaw testified that Alaska tin “ had been done away with some years ago. The quality of tin used was of the. best,”

*411 The contractor testified : “ The specifications provide for all piping to be extra heavy and guaranteed to stand pressure; all to have a coat of asphaltum for test. The asphaltum was "not done; that was not put on I believe.” The plumber swore that asphaltum was left off where the pipes would show, because there the pipes were bronze and painted and the asphaltum would show through. It was not omitted at the instance of Mrs. Worthington but through his own discretion as a business man.

The specifications called for “ one copper, lined with tin, oval sink, 14 inches by 20 inches, with nickeled faucets, Fuller improved, nickeled traps made by Messrs. Fred Adee & Co.” The contractor testified, “I can’t answer whether that was done; the plumber will have to answer that;” but the plumber said: “Adee does not make those things; he buys them ; he is simply a dealer in them. I can’t answer whether this was done according to the specifications.” The architect testified that the one called for was worth $25 more than the one used.

In the bill for extras was an item of $12.75 “ for locust posts.” The contractor testified that he charged extra for the locust posts because his contract “ only took him to the sill of the house ; all below was extra.” The specifications provided specifically as follows: “ Foundations. The house is to be set on 5 inch piles set 4 feet in ground, to be of acceptable local wood, to be approved by the architect.”

Among the extras is the following item : Planing second floor second time,«$9.75.” With reference to this item the contractor testified : “ In the extras there is an item for planing the second floor. The floor did not look well enoueh to suit Mrs. Worthington. We oiled it and it was so bad that she was very much dissatisfied with it and we planed it off for her. It was partly my fault; it was oiled and I did not make a good job of it.”

Free access — add to your briefcase to read the full text and ask questions with AI

Related

State Ex Rel. West Virginia Truck Stops, Inc. v. McHugh
233 S.E.2d 729 (West Virginia Supreme Court, 1977)
Antonoff v. Basso
78 N.W.2d 604 (Michigan Supreme Court, 1956)
Cohen v. Eggers
219 A.D. 429 (Appellate Division of the Supreme Court of New York, 1927)
Jacob & Youngs, Inc. v. Kent
129 N.E. 889 (New York Court of Appeals, 1921)
Fox v. Fox
145 N.Y.S. 949 (Appellate Terms of the Supreme Court of New York, 1914)
Gersmann v. Walpole
79 Misc. 49 (Appellate Terms of the Supreme Court of New York, 1913)
Easthampton Lumber and Coal Company v. . Worthington
79 N.E. 325 (New York Court of Appeals, 1906)

Cite This Page — Counsel Stack

Bluebook (online)
79 N.E. 323, 186 N.Y. 407, 24 Bedell 407, 1906 N.Y. LEXIS 1127, Counsel Stack Legal Research, https://law.counselstack.com/opinion/easthampton-lumber-coal-co-v-worthington-ny-1906.