Design Built Systems v. Sorokine

CourtCalifornia Court of Appeal
DecidedFebruary 27, 2019
DocketA151264
StatusPublished

This text of Design Built Systems v. Sorokine (Design Built Systems v. Sorokine) is published on Counsel Stack Legal Research, covering California Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Design Built Systems v. Sorokine, (Cal. Ct. App. 2019).

Opinion

Filed 2/26/19 CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION TWO

DESIGN BUILT SYSTEMS, Plaintiff and Respondent, A151264, A152059 v. ALEXEI SOROKINE et al., (Marin County Super. Ct. No. CIV-12-00737) Defendants, Cross-complainants and Appellants; DMITRIY KORNACH et al., Cross-defendant and Respondent.

These consolidated appeals assert three claims of error by the trial court. The first was directing a verdict against appellants as cross-defendants on a claim they violated an Internal Revenue Code provision and thereafter awarding $20,000 in sanctions and $122,995 in attorney fees against them. The second was directing verdicts against appellants on claims they had asserted against others, which ruling was premised on appellants’ inability to prove damage because the trial court had granted a motion in limine preventing appellants from introducing evidence of payments made to an unlicensed contractor. And the third was awarding cost of proof damages to a party based on requests for admissions propounded by a different party. We agree with appellants on all three claims, and we reverse. BACKGROUND Appellants are Alexei Sorokine and Elena Koudriavtseva (usually when referred to collectively, appellants). They are husband and wife. Sorokine is the owner of a home in

1 San Rafael (the property), which he had acquired prior to their marriage. In 2010, Sorokine traveled to Russia and has not been able to return. Respondents are Design Built Systems (DBS), and Dmitriy Kornach and his company, Kornach Construction Company (for convenience, collectively Kornach). DBS and Kornach were represented by separate counsel below, but are represented by one firm here, which has filed a single brief on behalf of both respondents. DBS and Kornach are both California licensed contractors, and both interacted over the years with Sorokine, and later Koudriavtseva, in connection with work done at the property, though in quite different ways. Specifically: DBS began its relationship with Sorokine in 2006, following a landslide at the property, when it was hired to prepare plans for the installation and construction of retaining walls. In 2010, Sorokine entered into an agreement with DBS to prepare various drawings for the property. And DBS was also retained to remedy a stop work notice issued by the city of San Rafael as a result of prior work performed by others. In 2011, DBS entered into another—and final—contract for work at the property, this time with Koudriavtseva, the contract giving rise to the litigation here. This contract was for the installation of concrete retaining walls and a driveway, for a price of $175,000. The contract set forth the specific scope of work for the retaining walls and driveway, and also had specific exclusions. In September 2011, after DBS had completed most of the work under the contract, Koudriavtseva fired DBS. She then hired PA Builders, Inc. (PA Builders) to complete the work and remedy what she claimed were defects caused by DBS and others. As will be seen, PA Builders was unlicensed. As mentioned, Kornach also had significant interaction with Sorokine, but in a much different fashion—and never as a general contractor. Rather, over the years Sorokine undertook significant remodeling work on the property, doing much of the work himself, sometimes with his sons Alexi and Oleg. He also hired labor crews to do work. Kornach, a longtime friend of Sorokine’s, agreed to purchase materials for projects at the property because of the discounts afforded to holders of a general contractor’s license. Sorokine does not speak English, and Kornach, who did, often interpreted, explained

2 things, or arranged meetings with contractors for Sorokine. Kornach never acted as a general contractor for any work at the property. Koudriavtseva took over projects at the property after 2010, as Sorokine could not return from Russia. Kornach continued to assist Koudriavtseva through the supply of materials, retention of contractors, and translations. Then, in fall 2011, Koudriavtseva informed Kornach she did not want him on the property any longer. THE PROCEEDINGS BELOW The Pleadings In February 2012, DBS filed a complaint against appellants, alleging four causes of action: (1) breach of contract; (2) foreclosure of mechanic’s lien; (3) common counts; and (4) account stated. Appellants’ response included a cross-complaint and thereafter amended cross- complaints, the second of which is the operative pleading here. It named as cross- defendants DBS (and its principal, Daniel Owens), Kornach (and its principal Dmitriy Kornach), and American Contractors Indemnity Company (ACIC), which had issued a surety bond to Kornach. The cross-complaint alleged 11 causes of action: (1) breach of written contract; (2) breach of oral contract; (3) breach of implied warranty; (4) negligence; (5) disgorgement; (6) intentional misrepresentation; (7) negligent misrepresentation; (8) rescission and restitution; (9) violation of the California Unfair Business Practice Act 17200; (10) breach of the covenant of good faith and fair dealing; and (11) recovery on contractor’s license bonds.1 Kornach’s response included its own cross-complaint against appellants, alleging causes of action for indemnity, contribution, declaratory relief, and “fraudulent filing.” The “fraudulent filing” cause of action in the cross-complaint went through several iterations, ultimately to allege a claim based on Internal Revenue Code section 7434, 26 U.S.C. § 7434 (the section 7434 claim). The section 7434 claim essentially alleged

1 Appellants had been granted leave to file a third amended cross-complaint. They failed to do so until six days before the trial commenced, and the trial court did not allow the amendment.

3 that appellants had borrowed money from Kornach but failed to repay it; that they filed fraudulent Internal Revenue Service 1099 forms reflecting loan repayments to Kornach; that the 1099 forms caused Kornach to have his tax returns audited and incur additional tax liability; and that appellants did not respond to a letter from Kornach’s attorney asking them to correct the 1099 forms. Requests for Admissions The case did not proceed to trial until January 2017, almost five years after it was filed. Meanwhile, the discovery that had occurred included various sets of requests for admissions. The Motion in Limine At the start of trial, Kornach made numerous motions in limine, number 17 of which sought to preclude appellants from introducing testimony or documents regarding work performed by unlicensed contractors, including PA Builders. The basis of the motion was that a contract by an unlicensed contractor is void and illegal (Wilson v. Steele (1989) 211 Cal.App.3d 1053, 1056), and that Business and Professions Code section 7031 bars all actions, however characterized, that effectively seek compensation for illegal unlicensed contract work. (Lewis & Queen v. N. M. Ball Sons (1957) 48 Cal.2d 141, 147–152.) The trial court granted the motion. The Trial Trial began on January 24, 2017. Following jury selection, testimony was taken over many days, and numerous exhibits were introduced. On February 8, the twelfth day of trial, the court heard argument on motions for directed verdicts on numerous causes of action, including on the claims asserted against appellants and also on appellants’ claims in their cross-complaint. Following relatively brief argument, the trial court granted directed verdicts on almost all of the claims, most of which rulings are not before us here.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cheek v. United States
498 U.S. 192 (Supreme Court, 1991)
Katzman v. Essex Waterfront Owners LLC
660 F.3d 565 (Second Circuit, 2011)
Hydrotech Systems, Ltd. v. Oasis Waterpark
803 P.2d 370 (California Supreme Court, 1991)
Asdourian v. Araj
696 P.2d 95 (California Supreme Court, 1985)
Lewis & Queen v. N. M. Ball Sons
308 P.2d 713 (California Supreme Court, 1957)
Newing v. Cheatham
540 P.2d 33 (California Supreme Court, 1975)
Campbell v. General Motors Corp.
649 P.2d 224 (California Supreme Court, 1982)
Grant v. Weatherholt
266 P.2d 185 (California Court of Appeal, 1954)
Bloom v. Bender
313 P.2d 568 (California Supreme Court, 1957)
Wilson v. Steele
211 Cal. App. 3d 1053 (California Court of Appeal, 1989)
Sanchez v. Bay General Hospital
116 Cal. App. 3d 776 (California Court of Appeal, 1981)
Shaw v. Colonial Room
175 Cal. App. 2d 845 (California Court of Appeal, 1959)
Smith v. Hill
237 Cal. App. 2d 374 (California Court of Appeal, 1965)
Epstein v. Stahl
176 Cal. App. 2d 53 (California Court of Appeal, 1959)
MacIsaac v. Waste Management Collection & Recycling, Inc.
36 Cal. Rptr. 3d 650 (California Court of Appeal, 2005)
Ranchwood Communities Limited Partnership v. Jim Beat Construction Co.
49 Cal. App. 4th 1397 (California Court of Appeal, 1996)
Holland v. MORSE DIESEL INTERNAT., INC.
104 Cal. Rptr. 2d 239 (California Court of Appeal, 2001)
MW Erectors, Inc. v. Niederhauser Ornamental & Metal Works Co.
115 P.3d 41 (California Supreme Court, 2005)
People Ex Rel. Lockyer v. Shamrock Foods Co.
11 P.3d 956 (California Supreme Court, 2000)
Carson v. Facilities Development Co.
686 P.2d 656 (California Supreme Court, 1984)

Cite This Page — Counsel Stack

Bluebook (online)
Design Built Systems v. Sorokine, Counsel Stack Legal Research, https://law.counselstack.com/opinion/design-built-systems-v-sorokine-calctapp-2019.