David Turnage v. General Electric Co.

953 F.2d 206, 22 Fed. R. Serv. 3d 83, 1992 U.S. App. LEXIS 1556, 1992 WL 10295
CourtCourt of Appeals for the Fifth Circuit
DecidedFebruary 11, 1992
Docket90-3414
StatusPublished
Cited by53 cases

This text of 953 F.2d 206 (David Turnage v. General Electric Co.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
David Turnage v. General Electric Co., 953 F.2d 206, 22 Fed. R. Serv. 3d 83, 1992 U.S. App. LEXIS 1556, 1992 WL 10295 (5th Cir. 1992).

Opinion

JOHN R. BROWN, Circuit Judge:

In a suit for damages brought as a result of burns he suffered while employed on an offshore rig, Plaintiff-Appellant David Turnage appeals a jury verdict in favor of Defendants-Appellees General Electric Company (GE), P & S Diesel Services, Inc. (P-»& S), and Boyce Machinery Corporation (Boyce). Specifically, Turnage appeals (i) the denial of his discovery motion requesting an internal examination of a circuit breaker and (ii) the court’s charge concerning the identity of a shut-off mechanism and an instruction describing the liability of the shut-off mechanism’s remanufacturer. Tumage also appeals the district court’s grant of summary judgment in favor of Shell Offshore, Inc. (Shell).

Because the district court did not abuse its wide discretion in denying the discovery request, we affirm the district court’s discovery ruling. Because there are no genuine issues of material fact regarding Shell’s liability such that a reasonable finder of fact could hold in Turnage’s favor, we affirm the granting of summary judgment as to Shell. Finally, however, because the court’s instruction concerning the identity of the shut-off mechanism was in error, we reverse the judgment in favor of Boyce and P & S and remand Turnage’s claim against them for a new trial.

A Wild Hose

Tumage was injured on November 27, 1986 while working as an electrician for Pool Company (Pool) on Pool’s Rig 455. At the time of the accident, the rig was engaged in drilling activities for Shell on a Shell platform on the Outer Continental *208 Shelf of the Gulf of Mexico. Tumage was severely burned when a coolant-intake hose disengaged from an overheated engine used to power one of the rig’s generators and spewed hot coolant and steam into the engine room where Turnage had gone to investigate a malfunctioning radiator.

Three electric generators powered the rig; each generator was driven by a Caterpillar diesel engine. The rig had four radiators to circulate coolant through the three engines. Each radiator was itself cooled by a belt-driven fan, one mounted behind each radiator. An electric motor, which drew its current from a GE Motor Control Center, drove the belt that propelled each fan. The Motor Control Center was equipped with four circuit breakers, one for each of the four electric motors; these circuit breakers protected against a short circuit. The Motor Control Center also featured four “overload heaters,” designed to shut the motors down if heat built up due to a circuit overload.

Discovery Brouhaha

Among the disputed theories advanced by Turnage which attempted to explain the cause of the accident, the parties agreed that the hose disengaged because the engine to which it was attached overheated. One explanation for the overheating of the engine, Turnage claims, is that the radiator fan stopped because the circuit breaker for the corresponding electric motor had tripped. From the inception of this suit, Turnage has maintained that the GE circuit breaker was internally defective. Prior to trial, he proceeded to notify all parties that on November 20, 1989, the circuit breaker would be opened, disassembled for investigation and discovery, and photographed. Presumably to avoid the charge of tampering with evidence, Tur-nage cautiously filed a Notice of Intention to Perform Test on November 14, 1989, and, in response, GE filed a motion for a protective order on November 17, 1989. Following a hearing, a magistrate judge granted GE’s motion because the pre-trial and trial dates were imminent and the deadline for the exchange of expert reports had passed. 1 Tumage moved for review of the magistrate’s order by the district court; his motion was denied as violative of the court’s scheduling order.

Turnage submits that the proposed inspection would have taken place within the proper period for discovery and would not have destroyed the circuit breaker. He adds that the passage of the date for exchanging expert reports was not a valid reason for denying the inspection. On the contrary, Turnage argues, the circuit breaker’s condition was a critical issue, and its inspection would have “assisted the search for truth.”

Regardless of how helpful this inspection may have been to Turnage’s case, this court will reverse the district court’s discovery ruling only if such ruling constitutes an abuse of discretion. Mayo v. Tri-Bell Industries, Inc., 787 F.2d 1007, 1012 (5th Cir.1986). As this Court pointed out recently:

Rule 16(b) of the Federal Rules of Civil Procedure authorizes the district court to control and expedite pretrial discovery through a scheduling order. Consistent with the authority vested in the trial court by rule 16, our court gives the trial court ‘broad discretion to preserve the integrity and purpose of the pretrial order.’ Moreover, a trial court’s decision to exclude evidence as a means of enforcing a pretrial order ‘must not be disturbed’ absent a clear abuse of discretion.

Geiserman v. MacDonald, 893 F.2d 787, 790 (5th Cir.1990) (citations omitted).

Turnage had over two years to request his inspection of the circuit breaker but waited until a month before trial to file his Notice of Intention to Perform Test. Initially, in its rule 16 scheduling order of January 13, 1989, the district court ordered Turnage to exchange his experts’ reports within 90 days, and the defendants to ex *209 change their experts’ reports within 60 days before the Pre-Trial Conference which was originally scheduled for May 2, 1989, later extended to May 25, 1989. The cut-off date had passed long before Tur-nage sought to examine the circuit breaker, therefore, the district court clearly felt that, given (i) the imminence of trial, (ii) the impending discovery deadline, and (iii) Tur-nage’s failure to request an inspection earlier, Tumage’s request to inspect the circuit breaker lacked merit. No matter how much we might believe that allowing the inspection might have been helpful — perhaps decisively so — or that such an allowance would not have adversely affected the imminent trial, we cannot find that the district court abused its discretion in denying the request.

Charge!

Turnage claimed at trial that the circuit breaker or the shut-off mechanism connected to engine No. 1, or both, malfunctioned, thus causing the engine to overheat and the hose to disengage. The primary thrust of Turnage’s case was that Boyce, approximately four months before the accident, remanufactured Engine No. 1 with a defective shut-off mechanism and that P & S failed to detect the shut-off’s defect when it tested Engine No. 1 three months prior to the accident. Turnage contended that the mechanism’s specific defect was that it contained an “incorrect shaft.” 2 Turnage, in fact, introduced two shut-off mechanisms at trial, exhibits 95 and 96, one of which had an incorrect shaft.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
953 F.2d 206, 22 Fed. R. Serv. 3d 83, 1992 U.S. App. LEXIS 1556, 1992 WL 10295, Counsel Stack Legal Research, https://law.counselstack.com/opinion/david-turnage-v-general-electric-co-ca5-1992.