Crouch v. Shepard

44 Tenn. 383
CourtTennessee Supreme Court
DecidedSeptember 15, 1867
StatusPublished
Cited by6 cases

This text of 44 Tenn. 383 (Crouch v. Shepard) is published on Counsel Stack Legal Research, covering Tennessee Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Crouch v. Shepard, 44 Tenn. 383 (Tenn. 1867).

Opinion

Shackelford, J.,

delivered the opinion of the.'Court.•

The complainants, Jesse A. .Crouch, and, son,: were the owners of, a...small tract of. land containing .five acres,'.on [384]*384Fall Branch, in Washington County, on .which there was valuable water power, and on which they had erected a saw-mill and carding machine. On the 8th day of April, 1856, they sold this tract of land to the defendant, Shepard, and executed a deed after the giving of the boundaries. The deed recites, “with a full power to erect all necessary works for the purposes of carrying on any kind of machinery said Shepard may see fit to erect and build on the premises, together with all and singular, its appurtenances,” etc. After the .usual covenants of warranty and seizin in the deed, is the following recitation: “It is understood, the said bargainors in the above conveyance, retain the right of a water lane running through the above premises, so as to receive the water as soon as the said James Shepard is done with it at his saw-mill, so as not to prove detrimental to the said Shepard; and the object of reserving said water, is to run other machinery below, and for no other purpose.”

The deed was duly acknowledged and registered. At the execution of the said deed, and cotemporaneous with it, an agreement was entered into by which the complainants were to remove their carding-machine and sawmill within a specified time, so as to enable the said Shepard to build his mill; and he was to build a sawmill costing about one thousand dollars. The complainants removed the mill and carding-machine within the time specified. Shepard built his saw-mill, but placed it upon the opposite bank of the creek from where the old mill stood. After the building of the mill by the defendant, Shepard, the complainant built on his lot be[385]*385low a earding-macbine, to be run by water, and opened bis water-lane through the lot conveyed. By placing the saw-mill on the opposite bant of the creek,- the channel of water was turned, and not sufficient passed the wheel of the mill to propel the machinery of the complainant, and he constructed another lane, running into the original one, so as to gather the surplus water that passed over the dam, which originally passed on the south bank of the stream, at the old mill site. To do this, it became necessary to build a small dam below — which the complainant did — about eighteen inches or two feet high. After this was done the defendant, Shepard, removed it, and forbid the complainant to replace it, or use the second water-lane erected by him. Thereupon this bill was filed, in which the complainant insists that he is entitled to use all the water of the stream after it passes the saw-mill of the defendant, and to have the use of this water he has the right to use all proper means to collect it, and the defendant having made it necessary, by building his mill on the opposite bank has so changed the current that it will not pass into the water-lane contemplated by the contract. An injunction was prayed for and obtained, restraining Shepard from disturbing his dam and use of the water.

The defendant, in his answer, sets out his deed, and insists, upon a proper construction of it, the complainant is only entitled to the water that passes over and under the wheel of his said mill, and that he is not entitled to the surplus water that runs over the dam; that he has been greatly damaged by the complainant, .in mak[386]*386ing two water-lanes, and building a dam and flooding bis wheel; that by the two lanes he is- cut off from the use of his stables; he prayed for an account of the damage done by the complainant. The answer was filed as a cross-bill. It was agreed the original bill should be taken as an answer to the cross-bill.

The weight of the proof is, by the building of the saw-mill of the defendant on the opposite side of the stream from the old site, the channel of the stream was changed, and a water-lane from the mill would not gather the surplus water that passes over the dam; that to gather the surplus water,, the short water-lane made by the complainant was necessary, and to throw the- water into this lane a dam of eighteen inches is requisite; that . the erection of this lane obstructs the passway of the defendant to his stables; that the bridge made by the complainant over the water-lane is unsafe, and in erecting the dam the complainant dug up part of the soil of the defendant; that the water passing under or through the saw-mill was not sufficient to propel the machinery of the complainant.

The Chancellor was of opinion, that, by the terms of the deed and reservations, the complainant had the right only to run a simple water-lane so as to receive the water at the saw-mill so soon as the defendant was done with it, that is, to take the water immediately below the saw-mill wheel, but so as not to interfere with the sawing; that he had no right to take the water at two places, or by two water-lanes; that he had no right to the waste water running over the dam, and no right to erect a dam on the premises to collect the waste [387]*387water, or the water running around the saw-mill; that the defendant had the right to erect any kind of machinery on the lot.

The bill of the complainant was dismissed, and a decree for an account against the complainant upon the cross-bill; from which he has appealed to this Court.

The determination of the questions involved depend upon the construction to be given to the deed of the 8th of April, 1856, with the reservations therein contained. By the terms of the deed, the complainant granted to the defendant the full power to erect any kind of works, for the purpose of carrying on any sort of machinery he may see fit to build on the premises, with the reservation of the right of a water-lane through the granted premises, so as to receive the water as soon as the grantee is done with it at his saw-mill, so as not to prove detrimental to him. The object of the complainant in reserving the use of the water was to run other machinery.

For the proper construction of this deed with its reservations, it becomes necessary to look to the situation of the parties, and the property which is the subject matter of the deed, and the intention and purpose of the parties in making it, and to give it that construction which the person making the deed believed the other to have accepted: 2 Kent, 556. It is a rule of law the whole contract should be considered in determining the meaning of any or all of its parts, for the reason the same parties make all the contract, and may be supposed to have the same purpose and object in view in all of it; and if this purpose is more clear in [388]*388some parts tban in others, those which are obscure may be illustrated by the light of others: 2 Parsons on Contracts, 15. It is held, the rule that the language of a deed or contract is to be taken more strongly against the party using it, though it be a rule, according to Lord Bacon, drawn out to the depths of reason, applies only to cases of ambiguity in the words, or when the exposition is requisite to give them lawful effect. It is a rule of strictness and rigor, and not to be resorted to but when other rules of exposition fail. The modern, and more reasonable practice, is, to give to the language its just sense, and to search for the precise meaning; and one requisite is to give due and fair effect to the contract, without adopting the rule either of rigor or of an indulgent construction: 2 Kent, 556.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

United States v. Tennessee
632 F. Supp. 2d 795 (W.D. Tennessee, 2009)
Ronald E. Brown v. Balaton Power, Inc.
Court of Appeals of Tennessee, 2003
Thomas C. Farnsworth, Jr. v. Gary P. Faulkner
Court of Appeals of Tennessee, 2001
Coble Systems, Inc. v. Gifford Co.
627 S.W.2d 359 (Court of Appeals of Tennessee, 1981)
Aetna Casualty & Surety Co. v. Woods
565 S.W.2d 861 (Tennessee Supreme Court, 1978)

Cite This Page — Counsel Stack

Bluebook (online)
44 Tenn. 383, Counsel Stack Legal Research, https://law.counselstack.com/opinion/crouch-v-shepard-tenn-1867.