Continental Insurance Company v. Bollinger Quick Repair, LLC

District Court, E.D. Louisiana·Decided May 18, 2021·No. 2:18-cv-02810·Unknown

Opinion

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA

CONTINENTAL INSURANCE CIVIL ACTION COMPANY

NO: 18-2810 VERSUS

BOLLINGER QUICK REPAIR, LLC, SECTION: “J”(5) BOLLINGER AMELIA REPAIR, LLC, ROLLS-ROYCE NORTH AMERICA, INC. AND ROLLS- ROYCE ENERGY SYSTEMS, INC.

ORDER & REASONS Before the Court are two Motions for Partial Summary Judgment (Rec. Docs. 96, 97) filed by Defendants, Rolls-Royce Marine North America, Inc., Bollinger Amelia Repair, LLC, and Bollinger Quick Repair, LLC; an opposition filed thereto by Plaintiff, Continental Insurance Company (Rec. Doc. 101); and a reply by Defendants (Rec. Doc. 105). Having considered the motion and legal memoranda, the record, and the applicable law, the Court finds that the motions should be DENIED. FACTS AND PROCEDURAL BACKGROUND In December 2015, the M/V OCEAN PIONEER, which was owned and operated by Hydra Offshore Construction, Inc. (“Hydra”) and insured by Plaintiff Continental Insurance Company (“CNA”), was docked at the Gulf Copper shipyard in Port Arthur, Texas when a loose mooring line that was adrift in the harbor became tangled in the vessel’s port and starboard propellors. Divers removed the line and found no underwater damage to the vessel. The vessel then performed two jobs offshore without any problems. In February 2016, the vessel sailed to Defendant Bollinger’s yard for drydocking and for inspection by the United States Coast Guard. During the inspection, the Coast Guard observed an oil sheen and required repairs

before it would issue a new Certificate of Inspection. Consequently, Hydra entered into an oral contract with Bollinger to repair the oil leak and refurbish and rebuild components of the vessel’s controllable pitch propeller systems (“CPPS”). Bollinger subcontracted with Defendant Rolls-Royce, who designed and manufactured the vessel’s CPPS, to perform some of the repair work. In March 2016, Bollinger and Rolls-Royce began the repair work, which

concluded in December 2016. The vessel then departed Bollinger’s shipyard for Port Arthur for testing of the vessel’s CPPS and dynamic positioning system. While in transit, the CPPS allegedly began “hunting” due to hydraulic pressure fluctuations in the port side CPPS. On March 10, 2017, Hydra put Bollinger on notice of its intent to pursue a claim for damage to the vessel’s CPPS. On April 12, 2017, Hydra placed CNA on notice that it was abandoning the vessel and tendered the vessel to CNA as a

constructive total loss. While CNA conducted its own investigation between June 1, 2017 and December 2018, Hydra was reimbursed by CNA for its sue and labor expenses incurred to moor and maintain the vessel; however, Hydra was not invoiced for these same services before or after those dates. On March 16, 2018, CNA filed the instant lawsuit to recover the amounts that it was obligated to pay its insured, Hydra, for the damage to the vessel caused by Bollinger’s and Rolls-Royce’s alleged failure to properly repair the vessel. On April 20, 2021, Defendants filed the instant motions for partial summary judgment, arguing that CNA’s sue and labor expenses were not reasonably incurred as a result

of an insured loss. (Rec. Docs. 96, 97). LEGAL STANDARD Summary judgment is appropriate when “the pleadings, the discovery and disclosure materials on file, and any affidavits show that there is no genuine issue as to any material fact and that the movant is entitled to judgment as a matter of law.” Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986) (citing Fed. R. Civ. P. 56(c)); Little

v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir. 1994). When assessing whether a dispute as to any material fact exists, a court considers “all of the evidence in the record but refrains from making credibility determinations or weighing the evidence.” Delta & Pine Land Co. v. Nationwide Agribusiness Ins. Co., 530 F.3d 395, 398 (5th Cir. 2008). All reasonable inferences are drawn in favor of the nonmoving party, but a party cannot defeat summary judgment with conclusory allegations or unsubstantiated assertions. Little, 37 F.3d at 1075. A court ultimately must be

satisfied that “a reasonable jury could not return a verdict for the nonmoving party.” Delta, 530 F.3d at 399. If the dispositive issue is one on which the moving party will bear the burden of proof at trial, the moving party “must come forward with evidence which would ‘entitle it to a directed verdict if the evidence went uncontroverted at trial.’” Int’l Shortstop, Inc. v. Rally’s, Inc., 939 F.2d 1257, 1264-65 (5th Cir. 1991). The nonmoving party can then defeat the motion by either countering with sufficient evidence of its own, or “showing that the moving party's evidence is so sheer that it may not persuade the reasonable fact-finder to return a verdict in favor of the moving party.”

Id. at 1265. If the dispositive issue is one on which the nonmoving party will bear the burden of proof at trial, the moving party may satisfy its burden by merely pointing out that the evidence in the record is insufficient with respect to an essential element of the nonmoving party's claim. See Celotex, 477 U.S. at 325. The burden then shifts to the nonmoving party, who must, by submitting or referring to evidence, set out

specific facts showing that a genuine issue exists. See id. at 324. The nonmovant may not rest upon the pleadings but must identify specific facts that establish a genuine issue for trial. See, e.g., id. at 325; Little, 37 F.3d at 1075. DISCUSSION It is undisputed that the hull insurance policy issued by CNA to Hydra included a sue and labor clause. Sue and labor clauses require an insurer to reimburse the insured for the costs incurred to prevent loss or mitigate damages. St.

Paul Fire & Marine Ins. Co. v. SSA Gulf Terminals, Inc., No. CIV.A. 01-3063, 2002 WL 31260153, at *4 (E.D. La. Oct. 8, 2002). Insurers began to include sue and labor clauses centuries ago in order to encourage insured parties to take steps to prevent threatened losses and mitigate losses if they occur. Reliance Ins. Co. v. The Escapade, 280 F.2d 482, 488 n. 11 (5th Cir. 1960). Even when the vessel is ultimately declared a total constructive loss, the insurer is still required to reimburse sue and labor expenses. 12A Couch on Insurance § 183:162 (3d ed. 2020). In this case, Defendants concede that the policy issued by CNA to Hydra

required CNA to reimburse Hydra for any reasonably incurred expenses made to preserve the vessel and prevent further damage. (Rec. Doc. 96-1, at p. 3). However, rather than arguing that the expenses incurred were excessive, Defendants argue that CNA should not have reimbursed Hydra for any of its sue and labor expenses. Specifically, Defendants note that, from December 2016 to the present, the vessel has remained moored at the same location, but, from December 2016 through the end of

Free access — add to your briefcase to read the full text and ask questions with AI

Continental Insurance Company v. Bollinger Quick Repair, LLC, (E.D. La. 2021).

Continental Insurance Company v. Bollinger Quick Repair, LLC (Continental Insurance Company v. Bollinger Quick Repair, LLC) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related