Continental Insurance Company v. Bollinger Quick Repair, LLC

CourtDistrict Court, E.D. Louisiana
DecidedApril 8, 2021
Docket2:18-cv-02810
StatusUnknown

This text of Continental Insurance Company v. Bollinger Quick Repair, LLC (Continental Insurance Company v. Bollinger Quick Repair, LLC) is published on Counsel Stack Legal Research, covering District Court, E.D. Louisiana primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Continental Insurance Company v. Bollinger Quick Repair, LLC, (E.D. La. 2021).

Opinion

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA

CONTINENTAL INSURANCE CIVIL ACTION COMPANY

NO: 18-2810 VERSUS

BOLLINGER QUICK REPAIR, LLC, SECTION: “J”(5) BOLLINGER AMELIA REPAIR, LLC, ROLLS-ROYCE NORTH AMERICA, INC. AND ROLLS- ROYCE ENERGY SYSTEMS, INC.

ORDER & REASONS Before the Court are a Motion for Partial Summary Judgment (Rec. Doc. 79) filed by Defendants, Rolls-Royce Marine North America, Inc., Bollinger Amelia Repair, LLC, and Bollinger Quick Repair, LLC; an opposition filed thereto by Plaintiff, Continental Insurance Company (Rec. Doc. 80); a reply by Defendants (Rec. Doc. 87); and a sur-reply by Plaintiff (Rec. Doc. 94). Having considered the motion and legal memoranda, the record, and the applicable law, the Court finds that the motion should be DENIED. FACTS AND PROCEDURAL BACKGROUND In December 2015, the M/V OCEAN PIONEER, which was owned and operated by Hydra Offshore Construction, Inc. (“Hydra”) and insured by Plaintiff Continental Insurance Company (“CNA”), was docked at the Gulf Copper shipyard in Port Arthur, Texas when a loose mooring line that was adrift in the harbor became tangled in and fouled the OCEAN PIONEER’s port and starboard propellors. Divers removed the line and found no underwater damage to the vessel. The vessel then performed two jobs offshore without any problems. In February 2016, the vessel sailed to Defendant Bollinger’s yard for drydocking and for inspection by the United

States Coast Guard. During the inspection, the Coast Guard observed an oil sheen and required repairs before it would issue a new Certificate of Inspection. Consequently, Hydra entered into an oral contract with Bollinger to repair the oil leak and refurbish and rebuild components of the OCEAN PIONEER’s controllable pitch propeller systems (“CPPS”). Bollinger subcontracted with Defendant Rolls- Royce, who designed and manufactured the vessel’s CPPS, to perform some of the

repair work. In March 2016, Bollinger and Rolls-Royce began the repair work, which concluded in December 2016. The vessel then departed Bollinger’s shipyard for Port Arthur for testing of the vessel’s CPPS and dynamic positioning system. While in transit, the CPPS allegedly began “hunting” due to hydraulic pressure fluctuations in the port side CPPS, which caused the port propeller blades to oscillate and fail to settle on the order of pitch. Plaintiff alleges that the vessel did not experience hunting issues prior to the repair work done by Bollinger and Rolls-Royce; however,

Defendants argue that the CPPS was hunting before their attempted repairs. On March 10, 2017, Hydra put Bollinger on notice of its intent to pursue a claim for damage and continuing issues related to the OCEAN PIONEER’s CPPS. On April 12, 2017, Hydra placed CNA on notice that it was abandoning the OCEAN PIONEER and tendering the vessel to it as a constructive total loss. On May 25, 2017, the parties commenced a joint teardown and inspection of the CPPS, which was attended by surveyors for all parties. On March 16, 2018, CNA filed the instant lawsuit to recover the amounts that

it was obligated to pay its insured, Hydra, for the damage to the OCEAN PIONEER caused by Bollinger’s and Rolls-Royce’s alleged failure to properly repair the vessel. Specifically, CNA asserted claims for negligence and breach of workmanlike performance. After asserting general denials and affirmative defenses, Defendants filed the instant motion for partial summary judgment. (Rec. Doc. 79). In this motion, Defendants seek to limit Plaintiff’s recovery to the original repair costs paid to

Bollinger as a matter of law. LEGAL STANDARD Summary judgment is appropriate when “the pleadings, the discovery and disclosure materials on file, and any affidavits show that there is no genuine issue as to any material fact and that the movant is entitled to judgment as a matter of law.” Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986) (citing Fed. R. Civ. P. 56(c)); Little v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir. 1994). When assessing whether a

dispute as to any material fact exists, a court considers “all of the evidence in the record but refrains from making credibility determinations or weighing the evidence.” Delta & Pine Land Co. v. Nationwide Agribusiness Ins. Co., 530 F.3d 395, 398 (5th Cir. 2008). All reasonable inferences are drawn in favor of the nonmoving party, but a party cannot defeat summary judgment with conclusory allegations or unsubstantiated assertions. Little, 37 F.3d at 1075. A court ultimately must be satisfied that “a reasonable jury could not return a verdict for the nonmoving party.” Delta, 530 F.3d at 399. If the dispositive issue is one on which the moving party will bear the burden

of proof at trial, the moving party “must come forward with evidence which would ‘entitle it to a directed verdict if the evidence went uncontroverted at trial.’” Int’l Shortstop, Inc. v. Rally’s, Inc., 939 F.2d 1257, 1264-65 (5th Cir. 1991). The nonmoving party can then defeat the motion by either countering with sufficient evidence of its own, or “showing that the moving party's evidence is so sheer that it may not persuade the reasonable fact-finder to return a verdict in favor of the moving party.”

Id. at 1265. If the dispositive issue is one on which the nonmoving party will bear the burden of proof at trial, the moving party may satisfy its burden by merely pointing out that the evidence in the record is insufficient with respect to an essential element of the nonmoving party's claim. See Celotex, 477 U.S. at 325. The burden then shifts to the nonmoving party, who must, by submitting or referring to evidence, set out specific facts showing that a genuine issue exists. See id. at 324. The nonmovant may

not rest upon the pleadings but must identify specific facts that establish a genuine issue for trial. See, e.g., id. at 325; Little, 37 F.3d at 1075. DISCUSSION Defendants argue that Plaintiff’s recovery should be limited to the original repair costs because, under general maritime law, the proper measure of damages in a negligence action “is to place the injured person as nearly as possible in the condition he would have occupied had the wrong not occurred.” Gaines Towing & Transp., Inc. v. Atlantic Tanker Corp., 191 F.3d 633, 635 (5th Cir. 1999) (internal citations and quotations omitted). Thus, “a defendant cannot be held liable for

damages that he has not been shown to have caused, or for the cost of repairs that enhance the value of the damaged property compared with its pretort condition.” Id. However, Plaintiff has stated claims for both negligence and breach of the warranty of workmanlike performance. The contracts of ship repairers fall under admiralty jurisdiction, and thus, are subject to doctrines of general maritime law, such as the warranty of workmanlike

performance. 1 Admiralty & Mar. Law, Thomas J. Schoenbaum, § 5:14 (6th ed.). Unless excluded by agreement, all maritime service contracts include an implied warranty of workmanlike performance. See Todd Shipyards Corp. v. Turbine Serv., Inc., 674 F.2d 401, 416 (5th Cir. 1982).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
Continental Insurance Company v. Bollinger Quick Repair, LLC, Counsel Stack Legal Research, https://law.counselstack.com/opinion/continental-insurance-company-v-bollinger-quick-repair-llc-laed-2021.