Columbia Gas Transmission Corp. v. Adams

646 N.E.2d 923, 68 Ohio Misc. 2d 29, 1994 Ohio Misc. LEXIS 70
CourtCourt Of Common Pleas Of Ohio
DecidedNovember 23, 1994
DocketNo. 94CV0015
StatusPublished
Cited by8 cases

This text of 646 N.E.2d 923 (Columbia Gas Transmission Corp. v. Adams) is published on Counsel Stack Legal Research, covering Court Of Common Pleas Of Ohio primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Columbia Gas Transmission Corp. v. Adams, 646 N.E.2d 923, 68 Ohio Misc. 2d 29, 1994 Ohio Misc. LEXIS 70 (Ohio Super. Ct. 1994).

Opinion

Joseph T. Clark, Judge.

This action was commenced by plaintiff, Columbia Gas Transmission Corporation (“Columbia”), seeking a preliminary and permanent injunction to compel defendants, Mr. and Mrs. Clyde Adams (“the Adamses”), to move a structure constructed by the Adamses on their property located approximately six to seven feet from an underground natural gas pipeline owned and operated by Columbia [31]*31and to permanently enjoin the Adamses from constructing any structure within twenty-five feet of each side of the center line of the pipeline or from otherwise interfering with or obstructing Columbia’s operation of the pipeline pursuant to a right-of-way agreement held by Columbia for the pipeline on this property. In their answer filed to the complaint, the Adamses admitted most of the allegations contained in the complaint.

The only issue remaining for determination is the necessary and reasonable width of a right-of-way that Columbia could enforce pursuant to the easement given to Columbia in its right-of-way agreement that covers this real property.

This matter was heard by the court on October 27, 1994. All parties were present for the hearing and all parties presented evidence and testimony to the court. Based on the evidence and argument presented at the hearing and based on the Adamses’ response to the complaint filed herein, the court issues the following findings of fact and conclusions of law, order, and final judgment.

FINDINGS OF FACT

1. Columbia is a corporation with its principal place of business in Charleston, West Virginia. Columbia is engaged in the business of storing and transporting natural gas in interstate commerce in Ohio and in other states.

2. Defendants, Mr. and Mrs. Adams, are residents of Fairfield County, Ohio.

3. As part of its operation, Columbia owns and operates an underground high pressure natural gas pipeline, Line H, that runs through real property located at 5767 Bauman Hill Road, Lancaster, Ohio, owned by the Adamses. Columbia maintains this pipeline pursuant to an easement granted in a written right-of-way agreement that applies to this property. This agreement is recorded for public record in the Office of the County Recorder of Fairfield County, Ohio, at Deed Record Volume 315, page 313. A copy of the right-of-way agreement is attached to the complaint filed herein. The right-of-way agreement expressly permits Columbia “to maintain, operate without restriction or limitation, repair, replace, and remove” the pipeline. However, the agreement does not specify any certain width or area around the pipeline that Columbia may use for this purpose. Columbia has used this right-of-way agreement to come on the Adamses’ property to inspect Line H.

4. In addition, Columbia’s right-of-way and use of the property are open and obvious. Portions of the pipeline are marked by permanent line markers, which were in place before the construction of the structure. A portion of the pipeline travels through a wooded area, which area can be observed from the Adamses’ property, where Columbia maintains a large cleared corridor to service and maintain the pipeline. Before constructing the structure in issue here, Adams [32]*32knew of the pipeline, the right-of-way agreement, and Columbia’s operation of the pipeline across the property.

5. Line H is a twelve-inch, high-pressure natural gas pipeline located approximately two to three feet below the surface of the property. The pressure in Line H is approximately one hundred twenty-five to two hundred twenty-five pounds per square inch. Line H serves Fairfield and other counties in Ohio.

6. The structure constructed by the Adamses is a large asphalt pad, approximately forty by fifty feet, surrounded on three sides by a privacy or stockade fence that is approximately six feet high. The Adamses use the pad to store materials, such as crushed glass. The structure was constructed without any notice to Columbia. At its closest point, the structure is approximately six to seven feet away from Line H.

7. Columbia first discovered the encroaching structure during a car patrol on or about October 19, 1993. The Columbia employee conducting the patrol, Tom Finck, advised the Adamses that the structure was encroaching on Line H and that it may be necessary to move the structure back at least twenty-five feet from the pipeline.

8. Thereafter, Columbia employees met with the Adamses on November 4, 1993, and confirmed that the structure encroached on Line H and that it would be necessary to move the structure back at least twenty-five feet from the pipeline. Although the Adamses indicated initially they would move the structure, the structure was never moved.

9. Columbia regularly inspects all of its pipelines, including Line H, in a variety of ways, as a ongoing part of its business operation. One type of inspection undertaken by Columbia is a “side drain” test. A side drain test is a test taken from the side of the pipeline undertaken for several reasons, including the detection' and location of possible gas leaks. Although the test can be undertaken at various distances from the side of a pipeline, a reasonable and necessary width for the side drain test is twenty-five feet from each side of the pipeline.

10. If Columbia would detect a leak or other problem in the line, Columbia is required to repair that leak and restore the pipeline to good working order as soon as possible. Although such repairs or maintenance may require areas larger than twenty-five feet from each side of the pipeline, at a minimum, an area of twenty-five feet on each side from the center of the pipeline is reasonably required. This area is required to safely and efficiently accommodate the construction work and equipment necessary to complete any repairs or maintenance, including replacement.

[33]*3311. It is standard practice in the operation of an underground natural gas pipeline such as Line H to keep at least twenty-five feet on each side of the pipeline free and clear of encroaches so that inspections, maintenance, and repairs can be safely and efficiently undertaken.

12. At its present location, the structure constructed by the Adamses constitutes an unreasonable and unsafe obstruction and interferes with Columbia’s safe and efficient operation of the pipeline and, in this respect, unreasonably violates the easement granted to Columbia in the right-of-way agreement. The structure prevents or hinders Columbia from doing the side drain test. The structure prevents or hinders Columbia from undertaking maintenance and repairs that might be necessary on Line H. Additionally, the structure also prevents Columbia from reacting quickly and in a timely and proper manner in an emergency situation, since Columbia would have to move the structure before it could repair the pipeline. In this respect, the structure creates a dangerous situation to Columbia’s employees, to the Adamses, and the public. The public interest requires that Columbia be able to repair and service natural gas pipelines as quickly, safely, and reasonably as possible.

13. The burden to the Adamses in moving the structure is slight when compared to the burden and risk to the Adamses, Columbia’s employees, and the public if the structure remains where it is presently located. The structure constitutes a dangerous and unsafe condition and an unreasonable risk to the public safety.

CONCLUSIONS OF LAW

1.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
646 N.E.2d 923, 68 Ohio Misc. 2d 29, 1994 Ohio Misc. LEXIS 70, Counsel Stack Legal Research, https://law.counselstack.com/opinion/columbia-gas-transmission-corp-v-adams-ohioctcompl-1994.