Cedar Rapids & Iowa City Railway & Light Co. v. Sprague Electric Co.

280 Ill. 386
CourtIllinois Supreme Court
DecidedOctober 23, 1917
DocketNo. 11487
StatusPublished
Cited by16 cases

This text of 280 Ill. 386 (Cedar Rapids & Iowa City Railway & Light Co. v. Sprague Electric Co.) is published on Counsel Stack Legal Research, covering Illinois Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Cedar Rapids & Iowa City Railway & Light Co. v. Sprague Electric Co., 280 Ill. 386 (Ill. 1917).

Opinion

Mr. Justice Dunn

delivered the opinion of the court:

The appellee, the Sprague Electric Company, entered into a contract with the appellant, the Cedar Rapids and Iowa City Railway and Light Company, for a consideration of $10,992, to furnish, deliver and erect on foundations to be furnished by the railway and light company certain apparatus and equipment known as a monorail electric shovel and runway, being an overhead tramway and the equipment for carrying coal from railway cars to the furnaces of the appellant’s light and power plant in the city of Cedar Rapids, Iowa. The contract .contained the following provision: “The company guarantees the apparatus and equipment covered by this agreement to be free from imperfections in their manufacture for a period of one year from date of invoice. Should any such defects appear within that time traceable to above causes the company will repair or replace such defective parts if an inspection proves the claim. This guaranty also" covers the runway beam against rolling, curling or buckling, due to operation of monorail on its lower flange.” The structure was about 700 feet long and 30 feet high, consisting of a series of upright beams with cross-beams resting upon.them. The electric hoist and carrying apparatus were suspended from the lower flange of a series of I-beams placed end to end, the whole referred to Q.S the runway beam. This runway beam extended the whole length of the structure and was suspended from the lower side of the cross-beams, to which it was fastened by means of brackets, which were small pieces of angle-iron riveted to the bottom of the upper flange of the runway and to the cross-beam above. There were twenty-six of these rivets to each pair of brackets, and the weight of the runway beam, and the hoist which it carried, rested upon the brackets. One end of one of the I-beams which constituted the runway adjoined a movable switch and was not supported by brackets but only by four three-quarter-inch rivets, though the opposite end was fastened by four brackets. The date of the invoice of the apparatus so erected was December 9, 1909. On October 31, 1910, while Fred Duncan was operating the apparatus for the appellant, the end of the I-beam which was not supported by brackets gave way and Duncan was thrown down and killed. His administratrix sued the appellant in Iowa and recovered a judgment for $6000 and costs, which the appellant paid. Thereupon the appellant brought a suit in assumpsit upon the contract in the circuit court of Cook county against the appellee to recover the amount it had been so compelled to pay, together with its attorneys’ fees in defending the suit. At the conclusion of the evidence each party 'moved for a directed verdict. The court sustained the motion of the appellant and directed a verdict in its favor for $6717.40,—the amount of the judgment and attorneys’ fees,—and a judgment was rendered against the appellee for that amount. On appeal by the defendant the Appellate Court for the First District reversed the judgment and granted a certificate of importance and appeal to the railway and light company. ■

There is no material controversy about the facts. The electrical hoist and carrying apparatus weighed 13,000 pounds, had attached an operator’s cage of structural 'steel which hung from the hoist and had a capacity of 2000 pounds, so that its weight, when loaded, was 15,000 pounds. The negligence charged in constructing the apparatus was in failing to supply the necessary number of supports and bolts to safely carry the hoist. Soon after the apparatus was put in operation the heads of the rivets began to break off at the point where there was no bracket, and from time to time the appellant replaced them, and after several weeks substituted four three-quarter-inch bolts for the four three-quarter-inch rivets. This did not remedy the defect, for the bolts also broke off and they were replaced several times by the appellant. On April n Rowlands, a representative of the appellee, was at the appellant’s plant and his attention was called to this condition. Rowlands, told Duncan, who was the operator of the electrical hoist, that it was very dangerous to operate the car over the rail in that condition and that the best thing to do would be to have a bracket made to hold the I-beams to the cross-beams. He told Ford, who was an employee of the appellant in charge of the boiler department, that he had better have a bracket made to support that part of the runway,—that it was dangerous to operate the car over it in its present condition,— and told him how the bracket should be made. It could have been made by the appellant there in its own blacksmith shop at a cost of five or six dollars. Green, who was the superintendent of the plant, was not there at the time, but Martin, his assistant, was. Rowlands and Ford talked to Martin about the bracket, and he either said that he would have it attended to or would take it up with Green on his return. Upon his return the matter was taken up with Green but he gave no directions to have the matter attended to, sajdng that it was up to the Sprague Electric Company to fix that and that Ford should not do it, and therefore no bracket was made. No notice was given to the appellee, but the appellant continued to operate the apparatus in its dan'gerous condition for more than six months longer, until the accident which resulted in Duncan’s death.

By its guaranty'the electric company warranted the apparatus to be free from imperfection in manufacture, but the apparatus was not free from imperfection in manufacture. That the absence of the bracket at the place in question was a defect which produced a dangerous condition wag recognized both by the appellant and the appellee, and under its guaranty it was the duty of the electric company to replace the defective part. It did not do so, but, having notice of the dangerous condition, informed the appellant how it could be corrected, and the appellant had notice that the appellee was relying upon the appellant’s correcting the defect. The appellant knew that the operation of the apparatus in its defective condition was dangerous to the lives of its employees, and with this knowledge for six months it continued to operate the apparatus without making any effort to repair the defect. It insists that it had a right to rely upon the appellee’s guaranty of the freedom of the apparatus from imperfection, and that the appellee is liable to it for the consequent damages resulting from the imperfection without regard to the conduct of -the appellant in continuing its use with knowledge of its dangerous condition. Whatever might be the liability of the appellee, under its guaranty, for an injury caused to third persons, whether through the negligence of the appellant or without its negligence, it is a general rule of law that it is the duty of a party injured by a breach of contract to do all that is reasonably in his power to prevent the damage or reduce it to the smallest amount. A party may not recklessly use a defective instrument with full knowledge of its dangerous condition, to the injury of third persons, relying upon the guaranty of its condition for indemnity against liability for his own negligence. If the defect were not apparent, or even if it were discoverable by an inspection but was not discovered through the negligent failure to inspect, an en-. tirely different question would be presented from that arising here. Here is a known dangerous condition likely to result in loss of life and great pecuniary damage.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

In re Estate of Schroeder
2022 IL App (5th) 210307-U (Appellate Court of Illinois, 2022)
Maere v. Churchill
452 N.E.2d 694 (Appellate Court of Illinois, 1983)
Montefusco v. Cecon Construction Co.
392 N.E.2d 1103 (Appellate Court of Illinois, 1979)
Williams v. Brown Manufacturing Co.
261 N.E.2d 305 (Illinois Supreme Court, 1970)
Richard v. H. P. Hood & Sons, Inc.
243 A.2d 910 (Supreme Court of Rhode Island, 1968)
Fruehauf Trailer Co. v. Lydick
59 N.E.2d 551 (Appellate Court of Illinois, 1944)
Vezina v. Souliere
152 A. 798 (Supreme Court of Vermont, 1931)
Nestler v. Pure Silk Hosiery Mills
242 Ill. App. 151 (Appellate Court of Illinois, 1926)
San Marcos Oil Mill v. Soyars
265 S.W. 173 (Court of Appeals of Texas, 1924)
Marshall Milling Co. v. Rosenbluth
231 Ill. App. 325 (Appellate Court of Illinois, 1924)
Hutchison Grocery Co. v. Louisville & Nashville Railroad
230 Ill. App. 291 (Appellate Court of Illinois, 1923)
Panteles v. Arsht
227 Ill. App. 488 (Appellate Court of Illinois, 1923)

Cite This Page — Counsel Stack

Bluebook (online)
280 Ill. 386, Counsel Stack Legal Research, https://law.counselstack.com/opinion/cedar-rapids-iowa-city-railway-light-co-v-sprague-electric-co-ill-1917.