Bordelon Marine, Inc. v. Laship, LLC

District Court, E.D. Louisiana·Decided November 22, 2023·No. 2:22-cv-03046·Unknown

Opinion

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA

BORDELON MARINE, INC. CIVIL ACTION

VERSUS NO. 22-3046

LASHIP, LLC, ET AL SECTION “L” (5)

FINDINGS OF FACT & CONCLUSIONS OF LAW This suit arises out of alleged damages to the M/V Shelia Bordelon when the M/V Joshua Chouest, owned by Reel Pipe LLC (Reel Pipe) and cold stacked (stored long term) at the LaShip, L.L.C. docking facility (LaShip) became unmoored on August 29, 2021, when Hurricane Ida made landfall, and crashed into the M/V Shelia Bordelon. Bordelon Marine, Inc (Bordelon), owner of the Shelia, seeks damages including cost of repair and other incidental and related expenses. Defendants, Reel Pipe LLC and LaShip deny liability and assert that all damages were caused by Hurricane Ida, a fortuitous event, force majeure, or Act of God. These alternate views created a question of fact which must be resolved at trial. Consequently, this matter came on for trial before the Court, without a jury, on October 30, 2023. After considering all of the testimony, exhibits introduced into evidence, and the applicable admissible portions of the record, the court issues the following findings of fact and conclusions of law. To the extent that any finding of fact constitutes a conclusion of law, the Court finds it as such, and to the extent that any conclusion of law constitutes a finding of fact, the Court finds it as such. FINDINGS OF FACT

A. The Parties and Relevant Vessels: 1. LaShip L.L.C. (LaShip) is a vessel docking facility and shipyard located in Houma, Louisiana and bounded on the West by the Houma Navigational Canal and the South by a dead end canal known as the Munson Slip. 2. Reel Pipe, LLC (Reel Pipe) owned the M/V Joshua Chouest at all relevant times, including August 29, 2021. 3. Offshore Service Vessels Inc. did not own, manage or operate the Joshua Chouest and did not operate the LaShip facility on August 29, 2021. 4. The Joshua Chouest, official #1203475, was at all relevant times herein an offshore supply vessel owned by Reel Pipe that was moored at LaShip's facility during Hurricane Ida. The

Joshua Chouest is an ABS "Maltese Cross A1" class vessel rated at 131 long tons deadweight (empty) and 4.4577 long tons at full cargo load. She measures 288 feet in length and 66 feet across the beam. The Joshua Chouest had no crew aboard and had been docked at the LaShip facility at its dock on the Munson Slip since July 10, 2018. 5. The Shelia Bordelon is owned by Bordelon Marine Inc. She is an ultra-light intervention vessel (ULIV) measuring at approximately 2312 gross tons and was moored at Bordelon's dock on the Munson canal directly across from the Joshua Chouest. B. The Incident: 1. Hurricane Ida made landfall on August 29, 2021, as a category 4 hurricane with estimated winds of 150 miles per hour.

2. On the afternoon of August 29, 2021, the Joshua Chouest broke her mooring lines drifted across the Munson Slip and forcefully struct the Shelia Bordelon. After colliding with the Shelia Bordelon at about 4:28 pm, on August 29, 2021, the unmanned Joshua Chouest continued to bang against and made repeated contact with the Shelia Bordelon. C. Pre-Incident Occurrences and Preparations for the Storm: 1. The Joshua Chouest transited to LaShip to be "cold stacked" in July of 2018, nearly 3 years before the storm. In order to get to the LaShip facility, the Joshua Chouest was deballasted and had minimal fuel and almost no liquid in any tanks due to the shallow depths along the transited route and within the LaShip facility. At all times pertinent here the Joshua Chouest remained

deballasted in order to remain afloat at LaShip's facility. 2. Reel Pipe delegated care, custody, and control of the Joshua Chouest to LaShip and did not man, attend, inspect, moor or otherwise oversee the Joshua Chouest between the day of her arrival at the LaShip facility on July 10, 2018 and the arrival of Hurricane Ida on August 29, 2021. 3. LaShip had no licensed mariners working at its facility. It used its regular employees including carpenters, painters, and pipefitters to select and arrange the mooring lines for the vessels docked at the facility which, at the time of the storm numbered 19 vessels. 4. The Joshua Chouest was berthed directly against the south bulkhead of the LaShip facility along the Munson Slip. She was moored starboard to the dock with 15 lines, ten of which

were rope lines and five wire cables. At the time of Hurricane Ida, the Joshua Chouest was secured to six mooring structures by two wires at the bow and three wires along the broadside length of the vessel. One of those wires was attached to a padeye at the bow which was almost horizontal to the shoreside mooring bitt. The wires were supplemented with four ropes at the bow, four ropes at the stern, and two ropes along the broadside length of the vessel. The ropes were an eight-strand braised polypropylene and polyethylene rope with a nine-inch circumference (approximately two and a half inches in diameter). This type of rope had a measured breaking strength of 129,370 lbs. The steel wire was one inch in diameter and had a measured breaking strength of 162,800 lbs. The lines were attached to mooring structures which were located on the dock about ten feet from the water's edge. They are single pile structures consisting of twenty-four-inch diameter pipe driven vertically into the seabed filled with concrete and extending approximately six feet above ground with a cross bar approximately four feet above ground. 5. On August 29, 2021, Hurricane Ida made landfall in Southeast Louisiana as a category 4 storm. The storm center traveled slowly northwest while its eyewall, the area of highest winds,

passed over the LaShip facility on the Houma Navigational Canal. The data, research, and findings indicate that the LaShip location was exposed to winds gusting between 125 and 135 mph during a ninety-minute period on the afternoon of August 29, 2021. Wind direction, while initially from the northeast, became northerly, then northwest and finally westerly as the center of Ida passed to the east of LaShip. The force of the wind over the exposed length of the Houma Navigation Canal was creating waves up to six feet high traveling south in the channel. See Expert Report of Meteorologist E. Craig Setzer, Exhibit 42. 6. Based on visual accounts, a computer program known as Optimore, and as the eyewitness videos indicate, the mooring lines that secured the bow of the Joshua Chouest were

over stressed and parted. See Testimony of Thomassie, page 11, line 7. Defendants’ expert, William Thomassie indicates that the forward most wire closest to the bow failed first and then the second wire failed. Thereafter, the third wire failed, and the winds increased causing the fourth wire to fail. He believes that the remaining mooring lines and wire held until the wind speed reached between 126 and 135 mph. The testimony is that the total wind force on the vessel was 479,000 pounds. At that point the rope lines at the bow were fully extended and reach their breaking strength and failed while the mooring lines that held the stern remained secure, allowing the vessel's bow to rotate to the port side away from the bulkhead and collide with the Bordelon vessel. 7. The Lilly Bordelon was moored at the Bordelon dock nearest to the Houma Navigational Canal and was unmanned both prior to and throughout the passing Hurricane Ida. 8. The Gerry Bordelon and Marcelle Bordelon were also moored at the Bordelon dock abreast of the Shelia Bordelon. 9. All of these Bordelon vessels remained securely moored throughout the passing of

Hurricane Ida on August 29, 2021.

Free access — add to your briefcase to read the full text and ask questions with AI

Bordelon Marine, Inc. v. Laship, LLC, (E.D. La. 2023).

Bordelon Marine, Inc. v. Laship, LLC (Bordelon Marine, Inc. v. Laship, LLC) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Brunet v. United Gas Pipeline Co.
15 F.3d 500 (Fifth Circuit, 1994)
Fischer v. S/Y NERAIDA
508 F.3d 586 (Eleventh Circuit, 2007)
The Louisiana
70 U.S. 164 (Supreme Court, 1866)
The Oregon
158 U.S. 186 (Supreme Court, 1895)
Consolidated Aluminum Corp. v. C.F. Bean Corp.
833 F.2d 65 (Fifth Circuit, 1988)
In re Mid-South Towing Co.
418 F.3d 526 (Fifth Circuit, 2005)
Illinois Constructors Corp. v. Logan Transportation, Inc.
715 F. Supp. 872 (N.D. Illinois, 1989)
Bunge Corp. v. M/V Furness Bridge
558 F.2d 790 (Fifth Circuit, 1977)
American Petrofina Pipeline Co. v. M/V Shoko Maru
837 F.2d 1324 (Fifth Circuit, 1988)