Balke v. Central Missouri Electric Cooperative

966 S.W.2d 15, 1997 WL 783106
CourtMissouri Court of Appeals
DecidedJune 2, 1998
DocketWD 54559
StatusPublished
Cited by28 cases

This text of 966 S.W.2d 15 (Balke v. Central Missouri Electric Cooperative) is published on Counsel Stack Legal Research, covering Missouri Court of Appeals primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Balke v. Central Missouri Electric Cooperative, 966 S.W.2d 15, 1997 WL 783106 (Mo. Ct. App. 1998).

Opinion

EDWIN H. SMITH, Judge.

Central Missouri Electric Cooperative appeals from the judgment of the Circuit Court of Cooper County, following a jury trial, awarding $783,333 to its electrical customers Richard W. Balke and Ruth Balke, respondents, on their claim for property and business damages arising from an alleged over-voltage caused by appellant’s defective electrical transformer.

Appellant asserts seven points on appeal. It alleges that the trial court erred: (1) in failing to grant its motion for judgment notwithstanding the verdict (JNOV) in that the applicable five-year statute of limitations had run on respondents’ claim; (2) in allowing respondents’ trial counsel to argue in closing argument an adverse inference arising from appellant’s decision not to call an engineer retained by it as an expert witness; (3) in alternatively submitting respondents’ claim on a defective produet-strict (hereinafter DP-S) liability theory in that there is no authority in Missouri for such a submission as to a supplier of electricity; (4) in denying appellant’s request that the jury be instructed as to the respondents’ comparative fault as to their DP-S liability submission; (5) in alternatively submitting respondents’ claim on a res ipsa loquitur theory; (6) by refusing to include in respondents’ comparative fault verdict director as to their res ipsa loquitur submission the issue of their failure to mitigate damages; and (7) in failing to grant appellant’s motion for a mistrial or, in the alternative, for a continuance, based upon the absence at trial of respondent, Richard W. Balke.

We reverse and remand.

Facts

Central Missouri Electric Cooperative, appellant, is in the business of supplying electricity to the members of its cooperative. Although appellant sells electricity to its members, it does not generate the electricity; rather, it acquires the electricity from Central Missouri Power of Jefferson City, Mis *18 souri. However, all of the equipment from the substation up to the customer’s meter is owned by and maintained exclusively by appellant.

Appellant’s distribution system of the electricity included a regulator, which served the function of regulating the voltage on the line to points down line or further away from the substation. The regulator would either increase or decrease the voltage depending on the circumstance. If the regulator sensed that the voltage at that point was either too high or too low, based upon the parameters of the system, then there was a 45-second to one-minute delay before the regulator was activated. On the regulator there was a device to record the number of times it was activated.

The voltage on any particular electrical supply line would vary depending on a variety of conditions. These conditions included the potential variations associated with the output from the substation, seasonal load variants, daily load variations and load variations caused by usage of particular customers. If a customer received voltages that were higher than the design parameters of the transmission system, the customer could experience motors overheating, motors burning out, and light bulbs burning out. Appellant had design parameters for their customers to receive no greater than 130 volts on the low side of the system and 260 volts on the high side of the system. The output of voltage from a line could be tested at the point of the transformer.

A transformer is a piece of electrical equipment which is designed to change the voltage which is received by the transformer from an electrical source. The transformer is designed to reduce the voltage from the distribution line down to a level that can be used by the customer to operate electrical equipment and devices in a residence or on a farm. The distribution line which began at the substation and continued to the respondents’ property was energized with an average of 7,620 volts. The purpose for having a line with such a high voltage when a residence requires significantly less is that since the source of the electrical power is some distance from the ultimate consumer and the voltage will decrease with the distance traveled over a line due to resistance, a higher voltage is used on the line so that, in theory, all customers on a particular line will have sufficient voltage.

The actual flow of electricity through a line is measured in amps. The work that is done by the electricity is measured in watts, and the formula to determine watts is simply the volts times amps. The amount of electricity which is purchased by a customer is measured at the customer’s meter in kilowatts.

A transformer reduces the voltage received from an electrical source by means of internal windings. These windings are wrapped around a metal core with a high side and a low side. The output of volts from the transformer is based upon an established ratio for both the high and low sides. It will vary based upon the input. If there is a higher input into the transformer from the distribution line because of load variations, then there is a corresponding variation based upon the specific ratio for the transformer. It was well known in the electrical distribution field that a lightning strike could cause some of the windings or turns in a transformer to be shorted out and, as a result, the turns ratio would be altered.

Respondents began their dairy operation in 1972. They initially started with a herd of 30 dairy cows. The dairy operation grew in size from 30 cows to 200 cows between 1983 and 1991. The operation included state of the art computer technology, including a computer feeder system that was designed to provide each cow with a customized diet to enable it to produce the maximum amount of milk possible. The respondents’ operation was one of the first dairy operations to utilize the computer feeder technology. In addition, they worked with their feed supplier to obtain the best quality of diet for their herd. The testimony was that a good dairy cow would produce 60 pounds of milk per day, and that respondents had cows that produced up to 120 pounds per day.

In 1982, the transformer servicing the respondents’ farm was changed by the appellant because of increased electrical usage by them. The new transformer which was in *19 stalled on the respondents’ property had earlier been part of a bank of three transformers at another location. When the transformer was removed from its prior location, it was not checked to determine whether it was in good working order. When it was installed on the respondents’ farm, the records from the appellant do not reflect that its output voltage was cheeked. However, employees of the appellant stated that it was normal practice to check the voltage on a transformer that was installed at a new location. The appellant had maintenance forms concerning the installation of transformers which had a specific blank for voltage information to be recorded, which was not completed on the form concerning the installation of the new transformer on respondents’ farm.

Following the installation of the new transformer, the respondents began experiencing electrical problems before which they had not experienced.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Kayla Hurley v. Karen Burton
Missouri Court of Appeals, 2021
Baldridge v. Kan. City Pub. Sch.
552 S.W.3d 699 (Missouri Court of Appeals, 2018)
Joe Frazier v. City of Kansas City, Missouri
467 S.W.3d 327 (Missouri Court of Appeals, 2015)
Chicago Insurance Company v. Archdiocese of St. Louis
740 F.3d 1197 (Eighth Circuit, 2014)
Green v. Plaza in Clayton Condominium Ass'n
410 S.W.3d 272 (Missouri Court of Appeals, 2013)
Precision Electric, Inc. v. Ex-Amish Specialties, Inc.
400 S.W.3d 802 (Missouri Court of Appeals, 2013)
Flood Ex Rel. Oakley v. Holzwarth
182 S.W.3d 673 (Missouri Court of Appeals, 2005)
Nordic Inn Condominium Owners' Ass'n v. Ventullo
864 A.2d 1079 (Supreme Court of New Hampshire, 2004)
State v. Thompson
147 S.W.3d 150 (Missouri Court of Appeals, 2004)
Cohen v. Express Financial Services, Inc.
145 S.W.3d 857 (Missouri Court of Appeals, 2004)
Central Missouri Electric Cooperative v. Balke
119 S.W.3d 627 (Missouri Court of Appeals, 2003)
Altenhofen v. Fabricor, Inc.
81 S.W.3d 578 (Missouri Court of Appeals, 2002)
Bland v. IMCO Recycling, Inc.
67 S.W.3d 673 (Missouri Court of Appeals, 2002)
Boyer v. Sinclair & Rush, Inc.
67 S.W.3d 627 (Missouri Court of Appeals, 2002)

Cite This Page — Counsel Stack

Bluebook (online)
966 S.W.2d 15, 1997 WL 783106, Counsel Stack Legal Research, https://law.counselstack.com/opinion/balke-v-central-missouri-electric-cooperative-moctapp-1998.