Babcock & Wilcox Co. v. Cormetech, Inc.

168 F. Supp. 3d 1017, 89 U.C.C. Rep. Serv. 2d (West) 105, 2016 WL 916704, 2016 U.S. Dist. LEXIS 30940
CourtDistrict Court, N.D. Ohio
DecidedMarch 10, 2016
DocketCASE NO. 5:14CV514
StatusPublished

This text of 168 F. Supp. 3d 1017 (Babcock & Wilcox Co. v. Cormetech, Inc.) is published on Counsel Stack Legal Research, covering District Court, N.D. Ohio primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Babcock & Wilcox Co. v. Cormetech, Inc., 168 F. Supp. 3d 1017, 89 U.C.C. Rep. Serv. 2d (West) 105, 2016 WL 916704, 2016 U.S. Dist. LEXIS 30940 (N.D. Ohio 2016).

Opinion

MEMORANDUM OPINION & ORDER

Kathleen B. Burke, United States Magistrate Judge

In December 2005, Plaintiff Babcock & Wilcox Company (“B&W”) obtained a contract from Kansas City Power & Light Company (“KCP&L”) to design and construct a Selective Catalyst Reduction (“SCR”) system to control emissions from one of KCP&L’s coal-burning power stations in La Cygne, Kansas. Complaint, Doc. 1, p. 3, ¶ 8. Thereafter, B&W issued a purchase order to Defendant Cormetech, Inc. (“Cormetech”) to obtain catalyst modules to be used in the SCR. Id. ¶¶ 7, 9-10. Cormetech guaranteed that the catalyst it supplied would not need to be replaced for 24,000 operating hours. However, the catalyst reached the end of its useful life well before the guaranteed number of hours. Id., p. 4, ¶ 14. KCP&L made claims against B&W and B&W paid KCP&L $3.5 million pursuant to a settlement reached in mediation. Id., ¶ 16. In this diversity action,1 B&W seeks to recover the settlement amount from Cormetech, asserting two claims: breach of warranty and indemnification.2

Cormetech has filed a Motion for Summary Judgment (the “Motion”) pursuant to Fed. R. Civ. P. 56 arguing that B&W’s [1019]*1019claims are time-barred and that the claims also fail because B&W has no evidence of a defect in the catalyst. Doe. 98. B&W filed a brief in opposition (Doc. 114) and Corme-tech filed a reply (Doc. 117).3

The Court GRANTS Cormetech’s Motion. B&W’s breach of warranty claim is time-barred and there is no genuine issue of material fact that would allow B&W to recover on its contractual indemnity claim. The contract’s indemnity provision requires B&W to prove that its settlement loss was caused by a defect or an act or omission attributable to Cormetech. As more fully set forth below, B&W has pointed to no evidence of such a defect or act or omission and B&W’s expert testified that no catalyst would have worked given the conditions that existed at the relevant time at KCP&L’s LaCygne power station.

I. Background

B&W, a Delaware corporation having its principal place of business in Ohio, is in the business of designing, manufacturing, and constructing power generation facilities and emissions control equipment and services, including SCR systems, for power companies such as KCP&L. Doc. 1, pp. 1-3, ¶¶ 2, 6. Cormetech, a Delaware corporation with its principal place of business in North Carolina, manufactures catalysts for SCR systems. Id, pp. 2-3, ¶ 2, 7.

In its Motion, Cormetech provides the following summary of the purpose and operation of an SCR:

An SCR is designed to reduce emission of nitrogen oxides (“NOx”), an undesirable component of the flue gas that results from burning coal in a power plant. When a power plant’s turbine burns coal, it collects all the gases from the burning process and expels them through a large system of ductwork. The ductwork leads the flue gas into the SCR, which is roughly the size of a three story home. The “floors” of this home are [ ] comprised of honey-combed catalyst material. The flue gas enters the SCR from the top, and a mist of ammonia is added. As the gas-ammonia mix makes it way down through the “floors,” a chemical reaction occurs. The gas-ammonia mix passes over the surface of the catalyst and the resulting reaction produces nitrogen and water, reducing the output of NOx significantly. Under any circumstance, the catalyst has limited useful life and must be changed out at regular intervals.

Doc. 98-1, pp. 1-2. In his report, B&W’s expert, Dr. Stephen Niksa (“Niksa”) agrees with this description of an SCR system (114-17, p. 4) and states, “Even under the best of circumstances, the active sites on SCR catalysts are slowly taken out of service by poisons and masking agents.... Such processes are said to deactivate the catalyst....” Id, p. 6. For that reason, SCRs are designed to facilitate the periodic replacement of catalyst modules. See Doc. 103-3, pp. 46-47 (Deposition of Mark Rohner, B&W’s purchasing agent).

In December 2005, B&W entered into a contract with KCP&L for the design and construction of an SCR system at KCP&L’s power station in La Cygne. Doc. 1, p. 3, ¶ 8. B&W thereafter provided design specifications to Cormetech for the catalyst modules to be used in the SCR system at the La Cygne plant and later contracted with Cormetech to purchase the catalyst. Id, ¶ 9. On the basis of the parties’ assumptions as to, inter alia, the type of fuel KCP&L would use at the power station, Cormetech made certain [1020]*1020guarantees regarding the catalyst, including that the ammonia slip (aka “NH slip”)4 would not surpass 2 parts per million (“ppm”) and that the catalyst would last for 24,000 operating hours. See, e.g., Doc. 114-4, p. 6 (B&W’s Technical Specifications setting forth the ammonia slip level); Doc. 114-6, p. 3 (Cormetech’s Performance Guarantee Language describing the catalyst life expectancy of 24,000 operating hours); Doc. 114-17, pp. 4-5 (Niksa’s report).

Niksa’s report provides the following information about the catalyst supplied by Cormetech for the LaCygne power station:

The catalyst was provided in the form of hundreds of modules, which are rectangular blocks with internal honeycomb walls that form numerous square channels along the length of each block. The modules are closely stacked into scaled layers that process all the flue gas that enters the SCR. The SCR at La Cygne has two identical SCRs installed side-by-side that each process about half of the flue gas stream.

Doc. 114-17, p. 4.

KCP&L began operating the SCR at the La Cygne plant in April 2007. Doc. 1, p. 4, ¶ 13. B&W conducted an Initial Performance Test in June 2007 at 1,200-1,500 hours of operation, which revealed that the ammonia slip was at a higher level than expected.5 Doc. 114-17, p. 7; Doc. 98-15, p. 3. In other words, more ammonia was being emitted from the SCR than expeet-ed, albeit still within the guaranteed limits. The catalyst was otherwise operating to reduce the emission of NOx as expected.6 Doc. 114, p. 7; Doc. 98-1, p. 4; Doc. 114-17, pp. 4-5, 7-8; Doc. 114-18, p. 5, 1120.

B&W’s expert report explains the significance of rising levels of ammonia slip:

As the NO reduction rate diminishes, the [ammonia] slip increases. This inverse proportionality explains why monitoring [ammonia] slip is widely regarded as the most reliable means to assess the extent of catalyst deactivation ....

Doc. 114-17, p. 6.

On October 8, 2007, Cormetech reported to B&W the results of its analysis of catalyst samples extracted from the SCR at “approximately 3000 hours of field service.”7 Doc. 114-9, p. 2. Such testing provides even “more conclusive evidence” regarding the degree of catalyst deactivation than measuring ammonia slip, according to B&W’s expert report. Doc. 114-17, p. 8. This testing showed that the catalyst had already reached 50% of its useful life. Id, p. 9.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

BMC Industries, Inc. v. Barth Industries, Inc.
160 F.3d 1322 (Eleventh Circuit, 1998)
Anderson v. Liberty Lobby, Inc.
477 U.S. 242 (Supreme Court, 1986)
Thomas M. Godfrey v. Pulitzer Publishing Co.
276 F.3d 405 (Eighth Circuit, 2002)
Keck v. Dryvit Systems, Inc.
830 So. 2d 1 (Supreme Court of Alabama, 2002)
Home Insurance v. Detroit Fire Extinguisher Co.
538 N.W.2d 424 (Michigan Court of Appeals, 1995)
Kennedy v. Vacation Internationale, Ltd.
841 F. Supp. 986 (D. Hawaii, 1994)
Neibarger v. Universal Coopertives, Inc.
486 N.W.2d 612 (Michigan Supreme Court, 1992)
Weiss v. MI Home Products, Inc.
877 N.E.2d 442 (Appellate Court of Illinois, 2007)
Ankle & Foot Care Centers v. Infocure Systems, Inc.
164 F. Supp. 2d 953 (N.D. Ohio, 2001)
Mécanique C.N.C., Inc. v. Durr Environmental, Inc.
304 F. Supp. 2d 971 (S.D. Ohio, 2004)
Lewis v. Philip Morris Inc.
355 F.3d 515 (Sixth Circuit, 2004)
Portsmouth Insurance Agency v. Medical Mutual
934 N.E.2d 940 (Ohio Court of Appeals, 2009)
Allied Industrial Service Corp. v. Kasle Iron & Metals, Inc.
405 N.E.2d 307 (Ohio Court of Appeals, 1977)
State Farm Fire & Casualty Co. v. Chrysler Corp.
523 N.E.2d 489 (Ohio Supreme Court, 1988)
C.J. Mahan Construction Co. v. Valspar Corp.
30 F. App'x 381 (Sixth Circuit, 2002)
Fab-Tech, Inc. v. Nemours
311 F. App'x 443 (Second Circuit, 2009)
Miles v. Kohli & Kaliher Associates, Ltd.
917 F.2d 235 (Sixth Circuit, 1990)

Cite This Page — Counsel Stack

Bluebook (online)
168 F. Supp. 3d 1017, 89 U.C.C. Rep. Serv. 2d (West) 105, 2016 WL 916704, 2016 U.S. Dist. LEXIS 30940, Counsel Stack Legal Research, https://law.counselstack.com/opinion/babcock-wilcox-co-v-cormetech-inc-ohnd-2016.